171 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works, and providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-28) The Following works are involved in this package 1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 31/850 - 32/4 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0365 2.Widening from Two lane to Four lane at 32/4-32/8 and Improvements from km 32/6 - 32/8 of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0373 3.Improvements to Riding Quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4529 4.Improvements to Riding Quality at Km 7/2-9/0, 10/6-12/2 Thiruchengode - Sankari Road (via) Kolikkalnatham Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4542 5.Improvements to Riding Quality at km 0/0 - 3/0 of Anchettipatti - Unjanoor Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4543 6. Improvements to Riding Quality at km 0/0-4/8 of Thottipalayam - Manjupalayam Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4552"
TRN : 719189 |  Salem - Tamil Nadu
Contract Value : 6.37 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works, and providing rcc centre median and up keeping for a period of 60 months in sankari (h) c&m sub division (package-28) the following works are involved in this package 1.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 31/850 - 32/4 including cd works and providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0365 2.widening from two lane to four lane at 32/4-32/8 and improvements from km 32/6 - 32/8 of salem - cochin - kanyakumari road (abandoned nh 47) sankari including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0373 3.improvements to riding quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of magudanchavadi - komarapalayam road (via) edappady (sh 221) including upkeeping for a period of 60 months 01-cridp-19-20-i-4529 4.improvements to riding quality at km 7/2-9/0, 10/6-12/2 thiruchengode - sankari road (via) kolikkalnatham road including upkeeping for a period of 60 months 01-cridp-19-20-i-4542 5.improvements to riding quality at km 0/0 - 3/0 of anchettipatti - unjanoor road including upkeeping for a period of 60 months 01-cridp-19-20-i-4543 6. improvements to riding quality at km 0/0-4/8 of thottipalayam - manjupalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4552"
172 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works, and providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-28) The Following works are involved in this package 1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 31/850 - 32/4 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0365 2.Widening from Two lane to Four lane at 32/4-32/8 and Improvements from km 32/6 - 32/8 of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0373 3.Improvements to Riding Quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4529 4.Improvements to Riding Quality at Km 7/2-9/0, 10/6-12/2 Thiruchengode - Sankari Road (via) Kolikkalnatham Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4542 5.Improvements to Riding Quality at km 0/0 - 3/0 of Anchettipatti - Unjanoor Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4543 6. Improvements to Riding Quality at km 0/0-4/8 of Thottipalayam - Manjupalayam Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4552"
TRN : 720185 |  Salem - Tamil Nadu
Contract Value : 6.37 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works, and providing rcc centre median and up keeping for a period of 60 months in sankari (h) c&m sub division (package-28) the following works are involved in this package 1.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 31/850 - 32/4 including cd works and providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0365 2.widening from two lane to four lane at 32/4-32/8 and improvements from km 32/6 - 32/8 of salem - cochin - kanyakumari road (abandoned nh 47) sankari including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0373 3.improvements to riding quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of magudanchavadi - komarapalayam road (via) edappady (sh 221) including upkeeping for a period of 60 months 01-cridp-19-20-i-4529 4.improvements to riding quality at km 7/2-9/0, 10/6-12/2 thiruchengode - sankari road (via) kolikkalnatham road including upkeeping for a period of 60 months 01-cridp-19-20-i-4542 5.improvements to riding quality at km 0/0 - 3/0 of anchettipatti - unjanoor road including upkeeping for a period of 60 months 01-cridp-19-20-i-4543 6. improvements to riding quality at km 0/0-4/8 of thottipalayam - manjupalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4552"
173 Widening and Improvements to Government Roads including Construction of CD Works, Drain, Retaining Wall, Reconstruction of Pipe Culvert and up keeping the roads for a period of 60 months in Attur C&M Sub Division (Package-8) The Following works are involved in this package 1. Widening from Single lane to Intermediate lane and Improvements of Nagiyampatty-Ulipuram Road at km 0/0-2/0 including CD works including upkeeping for a period of 60 months -01-CRIDP-19-20-O-2582 2. Widening from Single lane to Intermediate lane and Improvements of Nagiyampatty-Ulipuram Road at km 2/0-3/805 including CD works including upkeeping for a period of 60 months -01-CRIDP-19-20-O-2583 3. Construction of Retaning wall at Km 0/10, 2/6, 2/10, 3/2, 3/4, 3/8 including constuction of drain and raising the bodywall at Km.0/0 - 0/6 of Nagiyampatty - Ulipuram Pudur Road -01-CRIDP-19-20-O-2595 4. Widening from Single lane to Intermediate lane and Improvements of Thammampatty-Palakkadu Road at km0/0-2/4 including CD works including up keeping for a period of 60months - 01-CRIDP-19-20-O-2584 5. Construction of Retainingwall at km 4/4,4/6,4/8,4/10 of Malliykarai-Thammampatty to Jangamasamudram Upto Mullukurichi Road including reconstruction of pipe culvert at Km.4/4 and 4/10 - 01-CRIDP-19-20-O-2596
174 Providing Data Entry Services for Electrical Engineering Department at Salem Airport
TRN : 782087 |  Salem - Tamil Nadu
Contract Value : 2.64 Lacs | Agency Name : Airports Authority Of India
Tender award for providing data entry services for electrical engineering department at salem airport
175 Special Repairs to Government Roads in Rasipuram (H) C&M Sub Division (Package 89) The Following works are involved in this package 1) Special Repairs to Km 2/0-4/0 of Mangalapuram - Urambu - Udaiyarpalayam Road 2) Special Repairs to Km 3/6-6/510 of R.Pudupatty - Moolapallipatty - Mettala Road 3) Special Repairs to Km 4/2-5/6 of Km 4/2 of Mettala - Mullukuruchi Road to K.Kanavaipatty (via) P.Kanavaipatty Road 4) Special Repairs to Km 0/0-3/4 of Thammampatty Forest Road to Parappansolai Road 5) Special Repairs to Km 1/4-2/4 of Devasthanampudur - Oduvankuruchi Road"
176 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 720201 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
177 Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 91) The Following works are involved in this package 1.Special Repairs to Km 0/0-1/8 of Chittalandur - Jedarpalayam Road. 2.Special Repairs to Km0/0-2/0 of Koodacheri-Vasanthapuram-Nadanthai road 3.Special Repairs to Km 0/0-4/0 of Pandamangalam-Vengarai road 4.Special Repairs to Km 2/0-4/0 of Idumpankulam-Panangkadu road"
178 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining wall and widening of Pipe Culverts and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-27) The Following works are involved in this package 1.Construction Drain at km 6/8 - 7/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) 01-CRIDP-19-20-S-0407 2.Improvements to Riding Quality at Km 2/2 - 4/0 of Kakapalayam - Attayampatty Road (MD133) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4533 3.Improvements to Riding Quality at Km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of Kakapalayam -Chinnappampatty road (MD-134) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4536 4.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 0/0 - 2/0 including Construction of Retaining wall at km 0/10 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2618 5.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 2/0 - 4/0 Including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2619 6.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 4/0 - 6/4 Including widening of pipe culverts at km 4/8 & 5/10 and Construction of Retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2620 7.Improvements to Riding Quality at km 4/6 - 6/6 of Katchupalli - Alagappampalayam - Elampillai road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4544 8.Construction of Retaining wall at Km 2/4 of Elampillai - Kadayampatti Road 01-CRIDP-19-20-O-2633"
TRN : 720187 |  Salem - Tamil Nadu
Contract Value : 6.42 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of drain, retaining wall and widening of pipe culverts and up keeping for a period of 60 months in sankari (h) c&m sub division (package-27) the following works are involved in this package 1.construction drain at km 6/8 - 7/2 of magudanchavadi - komarapalayam road (via) edappady (sh 221) 01-cridp-19-20-s-0407 2.improvements to riding quality at km 2/2 - 4/0 of kakapalayam - attayampatty road (md133) including upkeeping for a period of 60 months 01-cridp-19-20-i-4533 3.improvements to riding quality at km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of kakapalayam -chinnappampatty road (md-134) including upkeeping for a period of 60 months 01-cridp-19-20-i-4536 4.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 0/0 - 2/0 including construction of retaining wall at km 0/10 including upkeeping for a period of 60 months 01-cridp-19-20-o-2618 5.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 2/0 - 4/0 including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-cridp-19-20-o-2619 6.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 4/0 - 6/4 including widening of pipe culverts at km 4/8 & 5/10 and construction of retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-cridp-19-20-o-2620 7.improvements to riding quality at km 4/6 - 6/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months 01-cridp-19-20-i-4544 8.construction of retaining wall at km 2/4 of elampillai - kadayampatti road 01-cridp-19-20-o-2633"
179 Special Repairs to Government Roads in Tiruchengodu (H) C&M Sub Division (Package 90) The Following works are involved in this package 1. Special Repairs to Km 0/2-0/4, 7/5-7/8 of Tiruchengode - Ariyanur Road (SH 86A) 2. Special Repairs to Km 6/4-7/2 of Marungapuri-Beemarapatti-Suriya goundampalayam Road 3. Special Repairs to Km2/0-3/4 of Kailasampalayam-Kanakkampatti-Appiapatti Road 4. Special Repairs to Km1/6-2/0, 4/0-6/0 of Km 14/4 of Tiruchengode-Namakkal road to Velagoundampatti-Maniyanur road (via) Koothampoondi Road 5. Special Repairs to Km6/6-7/6 of Suriyagoundampalayam-Paruthipalli-Ramapuram Road 6. Special Repairs to Km1/2-1/6 of Km 19/10 of Rasipuram-Tiruchengode Road to Agaram Road"
180 Widening and Improvements to Government Roads including Construction of CD works, Retaining wall and Providing RCC centre median and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-34) The Following works are involved in this package 1) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/0-2/4, including Construction of Retaining Wall at Km.2/2 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0366) 2) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/4-2/8, including Construction of Retaining Wall at Km.2/6 & 2/8, Widening of Pipe Culvert at Km.2/8 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0367) 3) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/8-3/2, including Construction of Retaining Wall and Widening of Slab culvert at Km.2/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0370) 4) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/2-3/8, including Widening of Slab culvert at Km.3/6 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0368) 5) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/8-4/2, including Construction of Retaining Wall Km.4/2, Reconstruction of Box culvert at Km.3/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0369)"
TRN : 720206 |  Salem - Tamil Nadu
Contract Value : 7.49 Crore | Agency Name : Highway Department
Tender award for widening and improvements to government roads including construction of cd works, retaining wall and providing rcc centre median and up keeping for a period of 60 months in mettur (h) c&m sub division (package-34) the following works are involved in this package 1) widening from three lane to four lane and improvements of thermal power plant road at km.2/0-2/4, including construction of retaining wall at km.2/2 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0366) 2) widening from three lane to four lane and improvements of thermal power plant road at km.2/4-2/8, including construction of retaining wall at km.2/6 & 2/8, widening of pipe culvert at km.2/8 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0367) 3) widening from three lane to four lane and improvements of thermal power plant road at km.2/8-3/2, including construction of retaining wall and widening of slab culvert at km.2/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0370) 4) widening from three lane to four lane and improvements of thermal power plant road at km.3/2-3/8, including widening of slab culvert at km.3/6 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0368) 5) widening from three lane to four lane and improvements of thermal power plant road at km.3/8-4/2, including construction of retaining wall km.4/2, reconstruction of box culvert at km.3/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0369)"