You have searched for salem-tamil-nadu- in Awarded Tender Result. Click on any tender to view further details.
181Widening, Improvements and Improvements to Riding Quality to Government Roads including Widening of RCC slab culvert, Reconstruction of Box Culvert, Providing Centre Median, Construction of Drain an Well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package47)
The Following works are involved in this package
1.Widening from Two lane to Three lane and Improvements of Mallikarai - Rasipuram - Tiruchengode - Erode Road at Km 71/3-72/0 including Construction of Storm water drain at Km 71/3-71/8 (SH 79) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0411
2.Construction of storm water Drain at Km 75/5-76/2 of Mallikarai - Rasipuram - Tiruchengode - Erode Road including Providing footpath at Km 75/5-76/2 (Arthanarieswarar Temple Girivalapathai) (SH79) 01-CRIDP-19-20-S-0443
3.Widening from Intermediate lane to Two lane and Improvements of Vaiyappamalai-Velagoundampatti road at Km 12/0-14/4 including Widening of RCC slab culvert at Km 12/8 and Reconstruction of Box culvert at Km 14/2(MD 857) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1327
4.Improvements of Athumedu-Munjanur-Kallupalayam Road at Km 4/0-5/660 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2648
5.Construction of Retaining wall at Km 4/0-5/0 of Authumedu - Munjanur - Kallupalayam Road 01-CRIDP-19-20-O-2684
6.Improvements to Riding Quality at Km 15/0-16/6 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4556
7. Improvements to Riding Quality at Km 16/6-17/2 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4557
8.Improvements to Riding Quality at Km 5/300-7/4 of Mudalaipattipudur-Kalnaickkanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4567
9.Improvements to Riding Quality at Km 7/4 - 8/2 of Mudalaipattipudur - Kalnaickanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4569
10.Improvements to Riding Quality at Km 0/0-2/0 of Kailasampalayam-Kanakkampatti-Appiapattti Road (Using plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4579
11.Providing Center Median at Km75.600, 76.000 to 76.400of Malliakarai - Rasipuram -Tiruchengodu - Erode road (SH 79) 01-CRIDP-19-20-S-0435
12.Construction Well protecting wall at Km11/4 of Tiruchengode - Namakkal Road (SH 94) 01-CRIDP-19-20-S-0430
13.Construction Well protecting wall at Km 0/2 of Serukalai cross Road 01-CRIDP-19-20-O-2660
14.Construction Well protecting wall at Km 0/2 of Km 17/4 of Tiruchengode-Namakkal road to Mavureddipatti road 01-CRIDP-19-20-O-2664
15.Construction Well protecting wall at Km 1/10 of Lathuvadi Union Road 01-CRIDP-19-20-O-2665
16.Construction Well protecting wall at Km 2/4 of Unjanai-Pokkampalayam Road 01-CRIDP-19-20-O-2667"
TRN :
718808
|
Salem - Tamil Nadu
Contract Value :
6.70 Crore |Agency Name :
Highway Department
182Special Repairs to Government Roads in Tiruchengodu (H) C&M Sub Division (Package 90)
The Following works are involved in this package
1. Special Repairs to Km 0/2-0/4, 7/5-7/8 of Tiruchengode - Ariyanur Road (SH 86A)
2. Special Repairs to Km 6/4-7/2 of Marungapuri-Beemarapatti-Suriya goundampalayam Road
3. Special Repairs to Km2/0-3/4 of Kailasampalayam-Kanakkampatti-Appiapatti Road
4. Special Repairs to Km1/6-2/0, 4/0-6/0 of Km 14/4 of Tiruchengode-Namakkal road to Velagoundampatti-Maniyanur road (via) Koothampoondi Road
5. Special Repairs to Km6/6-7/6 of Suriyagoundampalayam-Paruthipalli-Ramapuram Road
6. Special Repairs to Km1/2-1/6 of Km 19/10 of Rasipuram-Tiruchengode Road to Agaram Road"
TRN :
718792
|
Salem - Tamil Nadu
Contract Value :
1.06 Crore |Agency Name :
Highway Department
183Widening, Improvements and Improvements to Riding Quality to Government Roads including Curve widening, widening of slab culvert, construction of Drain and Retaining wall and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-46)
The Following works are involved in this package
1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 0/0 - 1/0 including Widening Slab Culvert at Km 0/6 (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1326)
2) Improvements of Attaiyampatti - Masakkalipatti road at km 9/2 - 11/6 including Widening the curve at 10/10, 11/2, Construction of Retaining wall (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1336)
3) Construction of Drain at km 0/2 of Alavaipatti road (01-CRIDP-19-20-O-2679)
4) Improvements of V C C road to Singalantha puram road (via) Patchal. at km 0/0 - 4/0 including Construction of Retaining Wall including upkeeping for a period of 60 months
(01-CRIDP-19-20-P-3672)
5) Improvements to Riding Quality at km 9/6 - 10/8 of Mettala-Mullukurichi-Periyakombai road (MD853) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4570)"
TRN :
718809
|
Salem - Tamil Nadu
Contract Value :
5.57 Crore |Agency Name :
Highway Department
184Special Repairs to Government Roads in Sendamangalam (H) C&M Sub Division (Package 88)
The Following works are involved in this package 1. Special Repairs to Km 26/0-27/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road
2. Special Repairs to Km 234/845 - 236/135 of VCC Road
3. Special Repairs to Km 6/585 - 7/250 of Namagiripettai - Ariyagoundampatti - Kalkurichipirivu road
4. Special Repairs to Km 8/0 - 9/0 of Velegoundampatty - Elur - Puduchatiram road
5. Special Repairs to Km 9/4 - 10/4 and 11/4 - 12/0 of Velegoundampatty - Elur -Puduchatiram road
6.Special Repairs to Km 0/0 - 1/8 of Kulivalavu - Othakadai road
TRN :
718793
|
Salem - Tamil Nadu
Contract Value :
1.78 Crore |Agency Name :
Highway Department
185Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Retaining wall, Widening of Slab Culvert and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-45)
The Following works are involved in this package
1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 1/0 - 2/0 including widening slab culvert at Km 1/4 and Construction of Retaining Wall (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1328)
2) Improvements of Attaiyampatti - Masakkalipatti road at km 6/6 - 9/2 including dip raising at Km 6/10, 7/2, 7/4, 7/6 (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1332)
3) Construction of Retaining wall at km 2/2 of Rasipuram - Attur road (MD402) (01-CRIDP-19-20-M-1356)
4) Improvements to Riding Quality at km 48/500 - 50/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road (SH95) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4554)
5) Improvements to Riding Quality at km 2/8 - 5/4 of Rasipuram Byepass road (MD) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4562)
6) Improvements to Riding Quality at km 2/0 - 3/0 of Rasipuram - Attur road (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4563)"
TRN :
718810
|
Salem - Tamil Nadu
Contract Value :
5.54 Crore |Agency Name :
Highway Department
186Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 87)
The Following works are involved in this package
1. Special Repairs to Km 63/4-65/2 & 70/0-71/2 of Trichy Namakkal Road
2.Special Repairs to Km 4/0-5/0 of Namakkal Thindamangalam Keerambur Road.
3. Special Repairs to Km 0/0-1/4 of Serukkalai Cross Road to Vaiyarampalayam Road
4. Special Repairs to Km 6/0-6/6 of Pulagoundampatti-Serukkalai Road "
TRN :
718794
|
Salem - Tamil Nadu
Contract Value :
1.45 Crore |Agency Name :
Highway Department
187Improvements and Improvements to Riding Quality to Government Roads including Construction of Box Culvert, Retaining wall, Drain and Providing Centere Medain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package52)
The Following works are involved in this package
1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 2/4-3/460 (SH22) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0420)
2. Construction of Box culvert at km 22/10 of Tiruchengode- Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1338)
3. Improvements to Riding Quality at km 33/0-34/700 of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH 198). Including upkeeping for a
period of 60 months (01-CRIDP-19-20-I-4560)
4. Providing Center median at km 52/6-53/0 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0431)
5. Improvements to Riding Quality at km 77/4-77/8 of Malliakarai-Rasipuram-Tiruchengode-Erode Road (SH 79). Including upkeeping for a period of 60 months
(01-CRIDP-19-20-I-4558)
6. Improvements to Riding Quality at Km 4/2-6/965 of Kailasampalayam-Appanaickanpalayam- Pappampalayam road. Including upkeeping for a period of 60 months
(01-CRIDP-19-20-I-4590)
7. Improvements to Riding Quality at Km 15/6-19/6 of Tiruchengode-Komarapalayam road (MD 726). Including upkeeping for a period of 60 months
(01-CRIDP-19-20-I-4568)
8. Improvements to Riding Quality at Km 2/8-3/2 and 6/4-7/2, of Molasi road Including upkeeping for a period of 60 months ( 01-CRIDP-19-20-I-4589)
9. Construction of Drain at km 78/0-78/4 (L/S) of Malliakarai - Rasipuram-Tiruchengode -Erode Road (SH 79) (01-CRIDP-19-20-S-0447)
10. Construction of Drain at km 4/4-4/8 (R/S) of Tiruchengode-Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1355)
11. Construction of Box culvert at km 2/4 of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street
(01-CRIDP-19-20-O-2653)
12. Construction of Retaining wall at Km 2/4 (L/S & R/S) of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil
Adhithiravidar street (01-CRIDP-19-20-O-2686)
13. Providing Center Median at km 48/8-49/2 & km 50/4 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0437)"
TRN :
718805
|
Salem - Tamil Nadu
Contract Value :
5.17 Crore |Agency Name :
Highway Department
188Widening, Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CC Pavements, Reconstruction of Box culvert and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-43)
The Following works are involved in this package
1. Improvements of Namakkal - Kananur road at km 6/0 - 7/0 (SH 161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0424)
2. Improvements of Kolli Hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(MD 181) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1334)
3. Improvements to Riding Quality at km 2/0 - 3/0 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4584)
4. Construction of Retaining wall at km 2/2 of Km 9/6 of Namakkal-Thuraiyur road to Km 2/4 of Thoosur-Valayapatti road (via) Palapatti. (01-CRIDP-19-20-0-2685)
5. Reconstruction of Box culvert at km 2/2 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including construction of retaining wall. (01-CRIDP-19-20-O-2652)
6. Strengthening of Pottireddipatti to Kollimalai Bottom (via) Kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2650)
7. Construction of Retaining wall at km 0/4-1/2 of Ramanatha puram pudur road. (01-CRIDP-19-20-O-2687)
8. Widening from Single lane to Intermediate lane and Improvements of Muthugapatti road at km 0/700 - 1/300, Improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-CRIDP-19-20-0-2646)
9. Construction of Drain at km 2/8 - 5/450 of Periyakovilur - Vellarikadu road (via) Asakkadu. (01-CRIDP-19-20-P-3679)"
TRN :
718803
|
Salem - Tamil Nadu
Contract Value :
6.83 Crore |Agency Name :
Highway Department
189Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining wall and widening of Pipe Culverts and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-27)
The Following works are involved in this package
1.Construction Drain at km 6/8 - 7/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) 01-CRIDP-19-20-S-0407
2.Improvements to Riding Quality at Km 2/2 - 4/0 of Kakapalayam - Attayampatty Road (MD133) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4533
3.Improvements to Riding Quality at Km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of Kakapalayam -Chinnappampatty road (MD-134) including upkeeping for a period of 60 months
01-CRIDP-19-20-I-4536
4.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 0/0 - 2/0 including Construction of Retaining wall at km 0/10 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2618
5.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 2/0 - 4/0 Including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2619
6.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 4/0 - 6/4 Including widening of pipe culverts at km 4/8 & 5/10 and Construction of Retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2620
7.Improvements to Riding Quality at km 4/6 - 6/6 of Katchupalli - Alagappampalayam - Elampillai road including upkeeping for a period of 60 months
01-CRIDP-19-20-I-4544
8.Construction of Retaining wall at Km 2/4 of Elampillai - Kadayampatti Road 01-CRIDP-19-20-O-2633"
TRN :
719190
|
Salem - Tamil Nadu
Contract Value :
6.42 Crore |Agency Name :
Highway Department
190Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36)
The Following works are involved in this package
1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320
2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534
3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538
4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616
5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669
6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN :
719199
|
Salem - Tamil Nadu
Contract Value :
6.04 Crore |Agency Name :
Highway Department