3142Widening, Improvements, Providing Interlocking Paver Block including footpath and Construction of Minor Bridge, Median works including upkeeping in Tambaram (H) C&M Sub Division Jurisdiction
A) Improvements of Ottiyambakkam Road at Km 0 / 0 -- 0 / 6 including Providing Interlocking Paver Block and Footpath including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- O -- 1896)
B) Improvements of Ottiyambakkam Road at Km 0 / 6 -- 1 / 150 including Providing Interlocking Paver Block and Footpath including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- O -- 1897)
C) idening from end to end and Improvements of Santhoshapuram Mambakkam Road Via Vengaivasal Road at Km 0 / 0 -- 0 / 6 including Footpath including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- O -- 1891)
D) idening from end to end and Improvements of Santhoshapuram Mambakkam Road Via Vengaivasal Road at Km 0 / 6 -- 1 / 2 including Footpath including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- O -- 1892)
E) onstruction of Minor Bridge at km 0/10 of Ottiambakkam Road in lieu of existing piped causeway ( 01 -- CRIDP -- 19 -- 20 -- O -- 1898).
TRN :
743038
|
Chennai - Tamil Nadu
Contract Value :
7.75 Crore |Agency Name :
Highway Department
3144TTPS Mech II AHP Unit II Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during forthcoming overhaul 2019 20
TRN :
711083
|
Chennai - Tamil Nadu
Contract Value :
1.76 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3145Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Bus Lay Bye, Pipe Culvert and up keeping the roads for a period of 60 months in Valapady C&M Sub Division (Package-13)
The Following works are involved in this package
1. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 33/0-34/0 and 37/0-38/0 (MD 1044) Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-M-1289)
2.Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 30/8-32/0 Including Construction of Pipe Culvert at km.30/10 (MD 1044) Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-M-1292)
3. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 32/0-33/0 (MD 1044) Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-M-1293)
4. Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 21/0-23/0 Including Construction of bus lay bye (MD 1044) Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-M-1301)
5. Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 26/300-28/8 Including Construction of bus lay bye (MD 1044) Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-M-1302)
6. Improvements to Riding Quality at km 34/0-37/0 of Ayothiyapattinam-Belur- Kilakkadu Road Including Upkeeping for a period of 60 Months (01-CRIDP-19-20-I-4488)
"
TRN :
720198
|
Salem - Tamil Nadu
Contract Value :
7.35 Crore |Agency Name :
Highway Department
3146TTPS Mech II AHP Unit II Plastering of refractory cement inside Unit II BAH and removal of ash slag and debris from BAH floor and trenches during forthcoming overhaul period 2019 20
TRN :
711084
|
Chennai - Tamil Nadu
Contract Value :
1.46 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3147Widening, Improvements, Improvements to Riding Quality to Government Roads Including Widening and Reconstruction of Culvert, Widening Pipe Culvert, Construction of Drain and up keeping the roads for a period of 60 months in Pappiredipatti (H) C&M Sub Division (Package 66 )
The Following works are involved in this package:
The Following works are involved in this package
1. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 0/0 - 1/0 Reconstruction of culvert at km 0/10 (i) , 0/10(ii)(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1357)
2. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 1/0 - 2/0 Widening of culvert at km 1/4 , 1/8 including Reconstruction of culvert at km 1/2(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1358)
3. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 2/0 - 2/4 and 2/8 - 3/0 (MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1359)
4.Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 3/0 - 4/0 including widening of pipe culvert and construction of Drain at km 3/8(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1361)
5. Improvements to Riding Quality at km 2/6 - 4/6 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4620)
6. Improvements to Riding Quality at km 4/6 - 6/0 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4621)
7. Improvements to Riding Quality at km 6/0 - 7/6 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4622)"
TRN :
718802
|
Salem - Tamil Nadu
Contract Value :
6.28 Crore |Agency Name :
Highway Department
3149Package 31 - Improvements and Construction of Drain and Culvert works including upkeeping in Tiruttani and Pallipet (H) C&M Sub Division Jurisdiction
A) Construction of Drain at Km 34/6 - 34/10 (L/S) of Chittoor - Triuttani road (SH 54) (01-CRIDP-19-20-S-0117)
B) Construction of Drain at Km 84/8 - 85/0 (L/S) of Chennai - Tiruttani - Renigunta road (SH 3) (01-CRIDP-19-20-S-0119)
C) Construction of Drain at Km 31/0 - 31/4 (L/S) of Chittoor - Triuttani road (SH 54) (01-CRIDP-19-20-S-0117) (01-CRIDP-19-20-S-0118) D) Construction of Drain at Km29/6 - 30/2(L/S) of Chittoor - Triuttani road (SH 54) (01-CRIDP-19-20-S-0121)
E) Improvements to Riding Quality at km 0/0 - 5/0 of Thalavedu - Poonimangadu road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3861)
F) Improvements to Riding Quality at km 5/0 - 6/0 and 9/4 - 11/145 of Thalavedu - Poonimangadu road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3842) G) Improvements to Riding Quality at km 0/0 - 2/8 of Ayyaneri road including upkeeping for a period of 60 months (01-CRIDP-19-20-S-3843)
H)Reconstruction of RCC Box Culvert at Km 0/10, 3/8 of Thalavedu - Poonimangadu road (01-CRIDP-19-20-0- 1989)
I)Improvements to Riding Quality at km 1/4 - 3/4 of Arunkulam road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3857) "
TRN :
676691
|
Chennai - Tamil Nadu
Contract Value :
5.47 Crore |Agency Name :
Highway Department