2366Improvements and Improvements to Riding Quality, Reconstruction of Box culvert including up keeping for a period of 60 months in Govt. Roads in respect of Pudukkottai and Aranthangi (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-I-4359, Improvements to Riding Quality at km 0/0 - 4/0 of Adhanakkottai - Alangudi road including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-I-4338, Improvements to Riding Quality at km 2/6 - 5/0 of Pudukkottai - Embal road (MD663) including upkeeping for a period of 60 months
Road C, 01-CRIDP-19-20-O-2369, Improvements of Km 0/4 of Mattangal - Naduppatti road to Veeradipatti road at km 1/0 - 3/6 including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-I-4330 Improvements to Riding Quality at km 43/4 - 44/6 and 50/0 - 51/2 of Thirukkattuppalli - Sengipatti - Pattukkottai road (SH99) including upkeeping for a period of 60 months
Road E, 01-CRIDP-19-20-I-4328, Improvements to Riding Quality at km 23/2 - 26/0 of Thirukkattuppalli - Sengipatti - Pattukkottai road (SH99) including upkeeping for a period of 60 months
Road F, 01-CRIDP-19-20-I-4357, Improvements to Riding Quality at km 2/0 - 5/2 of Mookudi - Aliyanilai road including upkeeping for a period of 60 months.
Road G, 01-CRIDP-19-20-0-2385, Reconstruction of Box culvert at km 0/2 of T.S.P road to Ambukoil road
Road H, 01-CRIDP-19-20-S-0290, Reconstruction of Box culvert at km 45/6 of Thiruchirapalli - Ramanathapuram Road (Abandoned NH 210 Stretches in Pudukottai) (SH)
Road I, 01-CRIDP-19-20-S-0292, Reconstruction of Box culvert at km 96/10 of Musiri - Kulithalai - Pudukottai - Alangudi - Peravoorani - Sethubhava chatram Road (SH71).
TRN :
744746
|
Trichy - Tamil Nadu
Contract Value :
5.12 Crore |Agency Name :
Highway Department
2367Strengthening, Improvements, Improvements to Riding Quality to Government Roads and up keeping the roads for a period of 60 months in Pappiredipatti (H) C&M Sub Division (Package 68)
The Following works are involved in this package:
The Following works are involved in this package
1. Strengthening of Mallapuram - Mookanur road at km 8/2 - 9/0 (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1375)
2. Strengthening of Mallapuram - Mookanur road at km 9/0 - 10/0 (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1376)
3. Improvements of Mallapuram - Mookanur road at km 10/0 - 11/0 and 12/0 - 12/300 (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1368)
4. Strengthening of Mallapuram - Mookanur road at km 11/0 - 12/0 (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1370)
5. Improvements to Riding Quality at km 13/0 - 16/0 of Mallapuram - Mookanur road (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4601)
6. Improvements to Riding Quality at km 16/0 - 18/6 of Mallapuram - Mookanur road (MD 237) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4602)"
TRN :
733477
|
Salem - Tamil Nadu
Contract Value :
5.93 Crore |Agency Name :
Highway Department