2632Widening, Improvements, Improvements to Riding Quality to Government Roads including Reconstruction and Widening of Culvert and up keeping the roads for a period of 60 months in Palacode (H) C&M Sub Division (Package 57)
The Following works are involved in this package
1.Widening from Intermediate lane to Two lane and Improvements of Morappur - Marandahalli road at km 46/4 - 48/4 (MD 271) including upkeeping for a period of 60 months. (Job Code : 01-CRIDP-19-20-M-1363)
2.Widening from Single lane to Intermediate lane and Improvements of Begarahalli road to National Highways -7 at joining at KM121/6 at km13/4 - 16/4 (including extra length 130m) including up keeping for a period of 60 months. (Job Code : 01-CRIDP-19-20-O-2693)
3.Widening from Single lane to Intermediate lane and Improvements of Begarahalli road to National Highways -7 at joining at KM 121/6 at km 9/700 - 11/6 and 12/6 - 13/4 and including Reconstruction of culvert at KM 11/6 and widening of culvert at KM 10/10 including up keeping for a period of 60 months. (Job Code : 01-CRIDP-19-20-O-2694)
4.Improvements to Riding Quality at km 0/8 - 3/0, 3/4 - 3/6, 3/8 - 4/4 and 4/8 - 6/0 of Somanahalli - Papparapatti road including upkeeping for a period of 60 months. (Job Code : 01-CRIDP-19-20-I-4629)
.
TRN :
750489
|
Salem - Tamil Nadu
Contract Value :
5.64 Crore |Agency Name :
Highway Department
2633Widening, Improvements, Improvements to Riding Quality to Government Roads Reconstruction of Box Culvert and Retaining Wall and up keeping the roads for a period of 60 months in Harur (H) C&M Sub Division (Package 64)
The Following works are involved in this package
1. Improvements to Riding Quality at km 0/0 - 2/4 of Harur - Achalvadi - Pethathampatti X road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4619)
2. Widening from Single lane to Intermediate lane and Improvements of Morappur - Kallavi road at km 4/0 - 5/0 and Reconstruction of box culvert at km 4/6,6/4 and reconstruction of retaining wall at km 4/6 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-3683)
3. Widening from Single lane to Intermediate lane and Improvements of Hanumantheertham - Poyyapatti road at km 0/0 - 2/4 and including reconstruction of box culvert at Km 0/2(i),(ii), 0/4, 2/2 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-3680)
4.Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 1/8 - 3/8 including Reconstruction of Box culvert at Km 2/4, 2/8 and 3/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2705)
5. Improvements to Riding Quality at km 0/0 - 1/2 of Kallavi - Samandahalli road to Peramandapatti (Via) Veranakuppam road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4618)
6. Improvements of Valai Thottam - Dhottampatti road at km 0/0 - 2/900 including reconstruction of box culvert at Km 0/2, 1/10, 2/6, 2/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2706)
.
TRN :
750491
|
Salem - Tamil Nadu
Contract Value :
5.64 Crore |Agency Name :
Highway Department
2634Construction of Retaining wall, Drain, Protective wall, Widening of slab culvert, Widening of pipe culvert to Government Highways roads in Kothagiri (H) C&M Sub Division Jurisdiction – Package No. 65
A) Construction of Retaining wall at km 34/10 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road (SH 15)
B) Construction of Retaining wall at km 36/8 & 36/10 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road (SH 15)
C) Construction of Retaining wall at km 37/4 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road (SH 15)
D) Providing of Drain at km 42/0 - 43/0 of Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road (SH 15)
E) Widening of RCC slab culvert at km 30/2 & 30/4 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road Including Protective wall (SH 15)
F) Widening of RCC slab culvert at km 33/10 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road and Protective Wall at Km 33/10, 34/2 (SH 15)
G) Widening of RCC slab culvert at km 35/10 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road Including Protective Wall (SH 15)
H) Widening of RCC slab culvert at km 40/2 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road ,Protective Wall at Km 40/2,Widening 1 row Pipe Culvert at Km 40/4 and Providing CC Drain at Km 40/0 - 41/0 (SH 15)
I) Widening of Pipe Culvert at km 41/4 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road ,Protective Wall at Km 41/4 and CC Drain at Km 41/0 - 42/0 (SH 15)"
TRN :
717413
|
Coimbatore - Tamil Nadu
Contract Value :
5.34 Crore |Agency Name :
Highway Department
2635Additional construction of housing truss structure for establishing the pilot industrial water soluble fertilizer production unit to the Department of Soil Science and Agricultural Chemistry, AC and RI, Killikulam,Tuticorin District.
TRN :
676606
|
Tuticorin - Tamil Nadu
Contract Value :
49.75 Lacs |Agency Name :
Tamil Nadu Agricultural University.
2637Widening, Strengthening, Improvements to Riding Quality including Paver block and Construction of Drain Reconstruction of Box culvert, Construction of Retaining wall, including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvarur (H), C&M Subdivision
Road A 01-CRIDP-19-20-S-0303 Widening from End to End and CC Pavement of Mayiladuthurai - Thiruthuraipoondi Road at Km. 39/140 - 39/6 including Paver Block and Construction of Drain (SH 23) including upkeeping for a period of 60 months
Road B 01-CRIDP-19-20-S-0304 Widening from End to End and CC Pavement of Mayiladuthurai - Thiruthuraipoondi Road at Km. 39/6 - 39/920 including Paver Block and Construction of Drain (SH 23) including upkeeping for a period of 60 months
Road C 01-CRIDP-19-20-O-2523 Widening from End to End and CC Pavement of Road Branching at Km.39/2 of Mayiladuthurai - Thiruthuraipoondi and joins at Km.0/6 of Tiruvarur - Kodavasal - Valangaiman road at Km. 0/0 - 0/2 including Paver Block including upkeeping for a period of 60 months
Road D 01-CRIDP-19-20-O-2530 Strengthening of Andipalayam - Kakkalani road at Km. 0/0 - 2/0 including Reconstruction of Box Culvert at Km.0/2, 0/4, 1/6, 1/8 and Construction of Retaining wall at Km.1/6, 1/8 including upkeeping for a period of 60 months
Road E 01-CRIDP-19-20-I-4434 Improvements to Riding Quality at km.39/920 - 41/6 of Mayiladuthurai - Thiruthuraipoondi Road (SH 23) including upkeeping for a period of 60 months
Road F 01-CRIDP-19-20-I-4435 Improvements to Riding Quality at Km. 0/0 - 1/4 and 3/8 - 4/6 of Tiruvarur - Mannargudi - Muthupet road (SH 202) including upkeeping for a period of 60 months
Road G 01-CRIDP-19-20-I-4444 Improvements to Riding Quality at Km. 0/0 - 0/6 of Bhramin Burning Ghat to Vijayapuram Regulator road (MD 59) including upkeeping for a period of 60 months
Road H 01-CRIDP-19-20-S-0305 Strengthening of Tiruvarur - Mannargudi - Muthupet road at Km. 10/6 - 12/4 (SH 202) including upkeeping for a period of 60 months
Road I 01-CRIDP-19-20-S-0306 Strengthening of Mayiladuthurai - Thiruthuraipoondi Road at Km. 53/0 - 53/2 and 53/8 - 54/0 (SH 23) including upkeeping for a period of 60 months.
TRN :
744750
|
Trichy - Tamil Nadu
Contract Value :
6.52 Crore |Agency Name :
Highway Department
2638Widening, Strengthening, Improvements, Improvements to Riding Quality and Construction of Drain, Reconstruction of box culvert including up keeping for a period of 60 months in Govt. Roads in respect of Trichy (H), C&M Subdivision
Road A, 01-CRIDP-19-20-S-0256, Strengthening of Chinthamani Byepass Road at km 0/750 - 1/4 (SHU 11) including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-S-0252, Widening from End to End and Improvements of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) at km 316/6 - 317/0 including construction of Drain(SHU 9) including upkeeping for a period of 60 months
Road C, 01-CRIDP-19-20-I-4240, Improvements to Riding Quality at km 320/360 - 320/6 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-I-4242, Improvements to Riding Quality at km 320/6 - 320/8 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road E, 01-CRIDP-19-20-I-4241, Improvements to Riding Quality at km 321/6 - 322/0 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road F, 01-CRIDP-19-20-O-2326, Reconstruction of RCC Box culvert at km 0/2 of Palaiyurmedu -Palancauvery Road
Road G, 01-CRIDP-19-20-I-4274, Improvements to Riding Quality at km 0/050 - 1/8 of Palaiyurmedu -Palancauvery Road including upkeeping for a period of 60 months
Road H, 01-CRIDP-19-20-I-4277, Improvements to Riding Quality at km 0/0 - 2/0 of S.Pudukkottai -Perugamani Road (Via)Harizen colony including upkeeping for a period of 60 months
Road I, 01-CRIDP-19-20-I-4279, Improvements to Riding Quality at km 0/0 - 2/210 of Caneyard -Poiyamani Road (Via) S.Pudukottai Road including upkeeping for a period of 60 months
Road J, 01-CRIDP-19-20-I-4301, Improvements to Riding Quality at km 28/0 - 30/6 of Old Mangammal Road including upkeeping for a period of 60 months"
TRN :
717405
|
Trichy - Tamil Nadu
Contract Value :
5.61 Crore |Agency Name :
Highway Department