2642Widening, Strengthening, Improvements to Riding Quality including Paver block and Construction of Drain Reconstruction of Box culvert, Construction of Retaining wall, including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvarur (H), C&M Subdivision
Road A 01-CRIDP-19-20-S-0303 Widening from End to End and CC Pavement of Mayiladuthurai - Thiruthuraipoondi Road at Km. 39/140 - 39/6 including Paver Block and Construction of Drain (SH 23) including upkeeping for a period of 60 months
Road B 01-CRIDP-19-20-S-0304 Widening from End to End and CC Pavement of Mayiladuthurai - Thiruthuraipoondi Road at Km. 39/6 - 39/920 including Paver Block and Construction of Drain (SH 23) including upkeeping for a period of 60 months
Road C 01-CRIDP-19-20-O-2523 Widening from End to End and CC Pavement of Road Branching at Km.39/2 of Mayiladuthurai - Thiruthuraipoondi and joins at Km.0/6 of Tiruvarur - Kodavasal - Valangaiman road at Km. 0/0 - 0/2 including Paver Block including upkeeping for a period of 60 months
Road D 01-CRIDP-19-20-O-2530 Strengthening of Andipalayam - Kakkalani road at Km. 0/0 - 2/0 including Reconstruction of Box Culvert at Km.0/2, 0/4, 1/6, 1/8 and Construction of Retaining wall at Km.1/6, 1/8 including upkeeping for a period of 60 months
Road E 01-CRIDP-19-20-I-4434 Improvements to Riding Quality at km.39/920 - 41/6 of Mayiladuthurai - Thiruthuraipoondi Road (SH 23) including upkeeping for a period of 60 months
Road F 01-CRIDP-19-20-I-4435 Improvements to Riding Quality at Km. 0/0 - 1/4 and 3/8 - 4/6 of Tiruvarur - Mannargudi - Muthupet road (SH 202) including upkeeping for a period of 60 months
Road G 01-CRIDP-19-20-I-4444 Improvements to Riding Quality at Km. 0/0 - 0/6 of Bhramin Burning Ghat to Vijayapuram Regulator road (MD 59) including upkeeping for a period of 60 months
Road H 01-CRIDP-19-20-S-0305 Strengthening of Tiruvarur - Mannargudi - Muthupet road at Km. 10/6 - 12/4 (SH 202) including upkeeping for a period of 60 months
Road I 01-CRIDP-19-20-S-0306 Strengthening of Mayiladuthurai - Thiruthuraipoondi Road at Km. 53/0 - 53/2 and 53/8 - 54/0 (SH 23) including upkeeping for a period of 60 months.
TRN :
744750
|
Trichy - Tamil Nadu
Contract Value :
6.52 Crore |Agency Name :
Highway Department
2643Widening, Strengthening, Improvements, Improvements to Riding Quality and Construction of Drain, Reconstruction of box culvert including up keeping for a period of 60 months in Govt. Roads in respect of Trichy (H), C&M Subdivision
Road A, 01-CRIDP-19-20-S-0256, Strengthening of Chinthamani Byepass Road at km 0/750 - 1/4 (SHU 11) including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-S-0252, Widening from End to End and Improvements of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) at km 316/6 - 317/0 including construction of Drain(SHU 9) including upkeeping for a period of 60 months
Road C, 01-CRIDP-19-20-I-4240, Improvements to Riding Quality at km 320/360 - 320/6 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-I-4242, Improvements to Riding Quality at km 320/6 - 320/8 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road E, 01-CRIDP-19-20-I-4241, Improvements to Riding Quality at km 321/6 - 322/0 of Chennai - Tirchy - Dindugal Road (Abandoned NH 45) (Srirangam - Trichy Byepass Road) (SHU 9) including upkeeping for a period of 60 months
Road F, 01-CRIDP-19-20-O-2326, Reconstruction of RCC Box culvert at km 0/2 of Palaiyurmedu -Palancauvery Road
Road G, 01-CRIDP-19-20-I-4274, Improvements to Riding Quality at km 0/050 - 1/8 of Palaiyurmedu -Palancauvery Road including upkeeping for a period of 60 months
Road H, 01-CRIDP-19-20-I-4277, Improvements to Riding Quality at km 0/0 - 2/0 of S.Pudukkottai -Perugamani Road (Via)Harizen colony including upkeeping for a period of 60 months
Road I, 01-CRIDP-19-20-I-4279, Improvements to Riding Quality at km 0/0 - 2/210 of Caneyard -Poiyamani Road (Via) S.Pudukottai Road including upkeeping for a period of 60 months
Road J, 01-CRIDP-19-20-I-4301, Improvements to Riding Quality at km 28/0 - 30/6 of Old Mangammal Road including upkeeping for a period of 60 months"
TRN :
717405
|
Trichy - Tamil Nadu
Contract Value :
5.61 Crore |Agency Name :
Highway Department
2647Improvements to riding quality, Widening of pipe culvert, Constrution of protective wall and Up Keeping for a period of 60 months to Government Highways roads in Kothagiri (H) C&M Sub Division Jurisdiction – Package No. 64
A) Improvements to Riding Quality at km 10/2 - 13/8 of Coonoor Kattabettu road (MD 1073) includuing upkeeping for a period of 60 month
B) Improvements to Riding Quality at Km 0/0 - 1/8 of Dhimbatty road upkeeping for a period of 60 month
C) Improvements to Riding Quality at Km 0/0 - 2/4 of Getticombai Battakorai road upkeeping for a period of 60 month
D) Improvements to Riding Quality at Km 6/0 - 9/0 of Marvala Road upkeeping for a period of 60 month
F) Widening of Pipe Culvert at km 36/6 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road Including Protective Wall (SH 15) upkeeping for a period of 60 month"
TRN :
717407
|
Coimbatore - Tamil Nadu
Contract Value :
5.11 Crore |Agency Name :
Highway Department
2649Upgradation of three Panchayat Union Roads / Panchayat Roads as Other District Roads in Virudhunagar (H) NABARD and Rural Roads Sub Division (Package 15)
TRN :
713053
|
Tirunelvelli - Tamil Nadu
Contract Value :
5.84 Crore |Agency Name :
Highway Department