3163TTPS Mech II AHP Unit II Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during forthcoming overhaul 2019 20
TRN :
689490
|
Tuticorin - Tamil Nadu
Contract Value :
1.76 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3164TTPS Mech II AHP Unit II Plastering of refractory cement inside Unit II BAH and removal of ash slag and debris from BAH floor and trenches during forthcoming overhaul period 2019 20
TRN :
689492
|
Tuticorin - Tamil Nadu
Contract Value :
1.46 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3167TTPS MechII TM I Unit II Overhaul 2019 20 Inspection overhauling and commissioning of Butterfly valve actuators for manual operation in condenser system
TRN :
689497
|
Tuticorin - Tamil Nadu
Contract Value :
1.08 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3168TTPS MechII TM I Unit II Overhaul 2019 20 Inspection overhauling and commissioning of Butterfly valve actuators for manual operation in condenser system
TRN :
689501
|
Tuticorin - Tamil Nadu
Contract Value :
1.08 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3170Package 32 Improvements, Strengthening and Rebuilding works and Construction of Drain and culvert works including upkeeping in Gummidipoondi (H) C&M Sub Division Jurisdiction
A) Construction of drain at km 0/0 - 0/2 of Kavarapettai – Sathiyavedu Road (SH – 52) (Job Code :- 01-CRIDP-19-20-S-0128)
B) Improvements to Riding Quality at Km.0/0-2/1 & Km.2/4-3/0 of G.N.T. Road to Kannambakkam ( via ) Edur including upkeeping for a period of 60 months. (Job Code :- 01-CRIDP-19-20-I-3835)
C) Improvements to Riding Quality at km 0/2 - 1/8 of K.S. Road – Thervoy Road including upkeeping for a period of 60 months. (Job Code :- 01-CRIDP-19-20-I-3863) D) Rebuilding of Km 9/2 G.M. Road – Sanaputhur Road at Km 0/0 - 3/0 including Reconstruction of box culvert at Km. 0/2,1/2 & 2/8 including upkeeping for a period of 60 months. (Job Code :- 01-CRIDP-19-20-O-1970)
E) Rebuilding of K.B.P. Road - Pudupalayam Road at km 0/0 - 0/300 including construction of storm water drain at km.0/0-0/300 including upkeeping for a period of 60 months. (Job Code :- 01-CRIDP-19-20-O-1978)
F) Strengthening of K.B.P. Road - Pudupalayam Road at km 0/300 - 2/0 including reconstruction of box culvert at km.1/6 including upkeeping for a period of 60 months.(Job Code :- 01-CRIDP-19-20-O-1979) "
TRN :
676682
|
Chennai - Tamil Nadu
Contract Value :
5.72 Crore |Agency Name :
Highway Department