3201Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 33) Road A :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 5/8 - 6/100 and 6/550 - 7/0, Improvements at km 6/100 - 6/550 (SH 169) including upkeeping for a period of 60 months
Road B :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 7/0 - 8/0 incuding Construction of Box Culvert at Km 7/2 (SH 169) including upkeeping for a period of 60 months
Road C :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 8/0 - 8/6, Improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding Construction of Box Culvert at Km 8/2 (SH 169) including upkeeping for a period of 60 months
Road D :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 4/2 - 4/700 (SH 169) including upkeeping for a period of 60 months
Road E :- Widening from Single lane to Intermediate lane and Improvements of Tirupur - Vijayamangalam road at Km 4/8 of Parapalayam at km 0/0 - 1/0, Improvements at km 1/0 - 2/2 including construction of retaining wall at Km 1/6,1/8 & 1/10 and Construction of RCC Drain at Km 0/2 including upkeeping for a period of 60 months
Road F :- Improvements to Riding Quality at km 5/2 - 6/0 of Tiruppur - Vijayamangalam road (SH 19 A) including upkeeping for a period of 60 months
Road G :- Improvements to Riding Quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of Tiruppur - Vijayamangalam road (SH 19 A)including upkeeping for a period of 60 months"
TRN :
676793
|
Tirupur - Tamil Nadu
Contract Value :
6.98 Crore |Agency Name :
Highway Department
3202Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD Works, Drain and up keeping the roads for a period of 60 months in Valappady C&M Sub Division (Package-12)
The Following works are involved in this package
1. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 5/0 - 6/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1287)
2. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 7/6 - 8/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1288)
3. Improvements to Riding Quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/2(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4469)
4. Improvements to Riding Quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/10 (i) and (ii)(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4470)
5. Improvements to Riding Quality at km 0/0-1/0 of Pagadupattu-Moongilpattu Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4511)
6. Strengthening of Palaniapuri to Road from km 32/8 of Salem-Ulundurpet road (via) Thalavaipatty, Thennampillaiyur, Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2587)
7. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 51/0 - 52/4 Including Construction of Drain at km.51/0-51/8 (MD 1044) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1291)"
TRN :
720200
|
Salem - Tamil Nadu
Contract Value :
7.00 Crore |Agency Name :
Highway Department
3203Widening and Improvements, Improvements, Improvements to Riding Quality, Reconstruction of Box Culverts and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub Division. Package No.44
A) Improvements of Kamanaickenpalayam - Annur road at Km 13/2 - 14/8 (SH 165) including upkeeping for a period of 60 months
B) Reconstruction of Box culvert Three cell of size 3m x 3m at km 13/4 of Kamanaickenpalayam - Annur road (SH 165)
C) Widening from Single Lane to intermediate Lane and Rebuilding of Palladam - Dharapuram road at Km 8/8 of Kamanaickenpalayam - Annaur road at Km 4/0 - 4/4 including Reconstruction of Box Culvert in lieu of Existing damaged Pipe Culvert at Km 4/2 including upkeeping for a period of 60 months
D) Improvements to Riding Quality at Km 7/0 - 7/960 and Km 8/236 - 9/0 of Venkittapuram - Kalipalayam road including upkeeping for a period of 60 months
E) Improvements to Riding Quality at Km 17/0 -19/8 of Kattampatty - Koduvai road (MD155) including upkeeping for a period of 60 months
F) Improvements to Riding Quality at Km 25/4 -28/8 of Kattampatty - Koduvai road (MD155) including upkeeping for a period of 60 months
G) Improvements to Riding Quality at Km 0/2 - 3/0 of Panapalayam - Pethampalayam road including upkeeping for a period of 60 months
H) Improvements to Riding Quality at Km 3/0 - 3/8 of Panapalayam- Pethampalayam road including upkeeping for a period of 60 months
I) Improvements to Riding Quality at Km 0/0 - 3/0 of Karukkampalayam - Sengathurai road (Via) Sendevipalayam - Kumarapalayam including upkeeping for a period of 60 months"
TRN :
704983
|
Tirupur - Tamil Nadu
Contract Value :
6.19 Crore |Agency Name :
Highway Department
3204Widening and Improvements, Improvements, Improvements to Riding Quality, Junction improvements, Providing Centre median Construction of Box Culverts, Reconstruction of culverts Construction of Retaining Walls, Widening RCC, slab culverts, Construction of Drain and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.59 Road A :- Widening from Three lane to Four lane and Improvements of Pollachi- Dharapuram- Karur road at km 18/0-18/6 including Junction Improvements, providing Center median (SH21) including up keeping for a period of 60 months.
Road B :- Improvements of Pollachi - Dharapuram - Karur road at km 18/6 - 19/0 including Junction improvement, Providing Center Median and Construction of Drain. (SH 21) including up keeping for a period of 60 months.
Road C :- Construction of Box culvert at km 9/2 of Udumalpet - Thirumoorthy salai (MD 512)
Road D :- Widening from Single lane to Intermediate lane and Rebuilding of Periyapatti - Negamam road (via) Ammapatti at km 9/500 - 10/0 and including Reconstruction of culvert in lieu of damaged Culvert at km 9/10 including up keeping for a period of 60 months.
Road E :- Improvements to Riding Quality at km 0/4 - 0/8 of The road branching at Km 19/0 of Udumalpet-Senjerihills road to Chikkanuthu including up keeping for a period of 60 months.
Road F :- Improvements to Riding Quality at km 2/0 - 4/0 of Poolankinar - Kongalnagaram road including up keeping for a period of 60 months.
Road G :- Improvements to Riding Quality at km 2/0 - 3/0 of Kongalnagaram - Ramachandrapuram road including up keeping for a period of 60 months.
Road H :- Construction of Retaining wall at km 4/2-6/0 of Anthiyur - Kongalnagaram road
Road I :- Widening of RCC Slab culvert across PAP canal at km 1/8 of Kongalnagaram - Ramachandrapuram road
Road J :- Construction of Box culvert at km 4/6 of km 8/8 of Udumalpet-Senjeri hills road to Kottamangalam road and Construction of Retaining wall
Road K :- Construction of Box culvert at km 5/2 of Periyapatti - Negamam road (via) Amanthakadavu and including Retaining wall"
TRN :
716240
|
Tirupur - Tamil Nadu
Contract Value :
5.85 Crore |Agency Name :
Highway Department
3205Widening and Improvements, Improvements, Improvements to Riding Quality, Reconstruction of Box Culverts and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub Division. Package No.44
A) Improvements of Kamanaickenpalayam - Annur road at Km 13/2 - 14/8 (SH 165) including upkeeping for a period of 60 months
B) Reconstruction of Box culvert Three cell of size 3m x 3m at km 13/4 of Kamanaickenpalayam - Annur road (SH 165)
C) Widening from Single Lane to intermediate Lane and Rebuilding of Palladam - Dharapuram road at Km 8/8 of Kamanaickenpalayam - Annaur road at Km 4/0 - 4/4 including Reconstruction of Box Culvert in lieu of Existing damaged Pipe Culvert at Km 4/2 including upkeeping for a period of 60 months
D) Improvements to Riding Quality at Km 7/0 - 7/960 and Km 8/236 - 9/0 of Venkittapuram - Kalipalayam road including upkeeping for a period of 60 months
E) Improvements to Riding Quality at Km 17/0 -19/8 of Kattampatty - Koduvai road (MD155) including upkeeping for a period of 60 months
F) Improvements to Riding Quality at Km 25/4 -28/8 of Kattampatty - Koduvai road (MD155) including upkeeping for a period of 60 months
G) Improvements to Riding Quality at Km 0/2 - 3/0 of Panapalayam - Pethampalayam road including upkeeping for a period of 60 months
H) Improvements to Riding Quality at Km 3/0 - 3/8 of Panapalayam- Pethampalayam road including upkeeping for a period of 60 months
I) Improvements to Riding Quality at Km 0/0 - 3/0 of Karukkampalayam - Sengathurai road (Via) Sendevipalayam - Kumarapalayam including upkeeping for a period of 60 months"
TRN :
676837
|
Tirupur - Tamil Nadu
Contract Value :
6.19 Crore |Agency Name :
Highway Department
3207Widening and Improvements, Improvements to Riding Quality, Reconstruction of Box Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub Division. Package No.46
A) Widening from Two lane to Three lane and Improvements of Palladam - Cochin Frontier road at Km 2/0 - 3/0 (SH 163) including upkeeping for a period of 60 months
B) Widening from Two lane to Three lane and Improvements of Palladam - Cochin Frontier road at Km 3/0 - 3/350 and 3/650 - 4/0 (SH 163) including upkeeping for a period of 60 months
C) Widening from Two lane to Three lane and Rebuilding of Palladam - Cochin Frontier road at Km 3/350 - 3/650 including construction of retaining wall at Km 3/350 - 3/650 (SH 163) including upkeeping for a period of 60 months
D) Reconstruction of Box culvert Single cell of size 1m x 1m at Km 0/8 and 1/10 of Karanampettai- Rasagoundempalayam road
E) Improvements to Riding Quality at Km 0/0 - 1/8 of Karanampettai - Rasagoudempalayam road including upkeeping for a period of 60 months
F) Improvements to Riding Quality at Km 1/8 -3/0 of Karanampettai- Rasagoudempalayam road including upkeeping for a period of 60 months
G) Improvements to Riding Quality at Km 3/0 - 4/190 of Karanampettai- Rasagoudempalayam road including upkeeping for a period of 60 months
H) Improvements to Riding Quality at Km 4/6 - 7/0 of Kallipalayam - Vavipalayam road including upkeeping for a period of 60 months
I) Improvements to Riding Quality at km 0/0 - 2/0 of Valaiyapalayam road Km 7/6 of road from Palladam - Dharapuram road to Km 2/2 of Pongalur road to Valayapalayam road including upkeeping for a period of 60 months"
TRN :
704979
|
Tirupur - Tamil Nadu
Contract Value :
6.16 Crore |Agency Name :
Highway Department
3208Widening and Improvements, Improvements, Improvements to Riding Quality, widening of Pipe culverts Construction of Protective walls, Construction of Retaining Walls, Widening the curve and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.58 Road A :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 37/0 - 38/0 (SH 84 A) including upkeeping for a period of 60 months
Road B :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 54/2 - 54/8 including Construction of Retaining wall at km 54/4 (SH 84 A) including upkeeping for a period of 60 months
Road C :- Widening the Curve at km 54/8 - 55/6 of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai including Construction of Protective wall at km 54/10, 55/2 and widening of pipe culvert at km 54/10, 55/4 (SH 84 A)
Road D :- Improvements of Vellakovil - Veppampalayam - Noyyal road at km 2/4 - 3/0 and 4/2 - 7/0 including upkeeping for a period of 60 months
Road E :- Construction Retaining wall at km 17/4 of Mullipuram - Bhagavathipalayam - Silambagoundanvalasu road
Road F :- Improvements to Riding Quality at km 0/0 - 1/650 of Muthur - Vellakovil road to Periyakangayampalayam road including upkeeping for a period of 60 months
Road G :- Improvements to Riding Quality at km 0/0 - 2/2 of Rangapayaankaadu - Salaithottampudur road including branch road up to pudhupalayam including upkeeping for a period of 60 months"
TRN :
716241
|
Tirupur - Tamil Nadu
Contract Value :
6.03 Crore |Agency Name :
Highway Department
3209Widening and Improvements, Improvements to Riding Quality, Reconstruction of Box Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub Division. Package No.46
A) Widening from Two lane to Three lane and Improvements of Palladam - Cochin Frontier road at Km 2/0 - 3/0 (SH 163) including upkeeping for a period of 60 months
B) Widening from Two lane to Three lane and Improvements of Palladam - Cochin Frontier road at Km 3/0 - 3/350 and 3/650 - 4/0 (SH 163) including upkeeping for a period of 60 months
C) Widening from Two lane to Three lane and Rebuilding of Palladam - Cochin Frontier road at Km 3/350 - 3/650 including construction of retaining wall at Km 3/350 - 3/650 (SH 163) including upkeeping for a period of 60 months
D) Reconstruction of Box culvert Single cell of size 1m x 1m at Km 0/8 and 1/10 of Karanampettai- Rasagoundempalayam road
E) Improvements to Riding Quality at Km 0/0 - 1/8 of Karanampettai - Rasagoudempalayam road including upkeeping for a period of 60 months
F) Improvements to Riding Quality at Km 1/8 -3/0 of Karanampettai- Rasagoudempalayam road including upkeeping for a period of 60 months
G) Improvements to Riding Quality at Km 3/0 - 4/190 of Karanampettai- Rasagoudempalayam road including upkeeping for a period of 60 months
H) Improvements to Riding Quality at Km 4/6 - 7/0 of Kallipalayam - Vavipalayam road including upkeeping for a period of 60 months
I) Improvements to Riding Quality at km 0/0 - 2/0 of Valaiyapalayam road Km 7/6 of road from Palladam - Dharapuram road to Km 2/2 of Pongalur road to Valayapalayam road including upkeeping for a period of 60 months"
TRN :
676833
|
Tirupur - Tamil Nadu
Contract Value :
6.16 Crore |Agency Name :
Highway Department
3210Providing Cantilever Gantry Boards, Providing Over Head Gantry Boards, Providing Metal crash barriers and including road furniture works on State Highways, Major District roads and Other District roads in Dharapuram (Highways) C&M, Division (Package No 68) Road A :- Providing Cantilever Gantry board at km 36/300 of Udumalpet - Dharapuram road (SH 97) including road furniture.
Road B :- Providing Cantilever Gantry board at km 57/10, 58/2, 91/2, 91/4 of Pollachi - Dharapuram - Karur road (SH 21) including road furniture.
Road C :- Providing Over Head Gantry board at km 77/4 of Pollachi - Dharapuram - Karur road (SH 21) including road furniture.
Road D :- Providing Cantilever Gantry board at km 31/8, 32/650 of Palani - Dharapuram road (via) Alangium (SH 153) including road furniture.
Road E :- Providing Over Head Gantry board at km 52/6 of Pollachi - Dharapuram - Karur road (SH 21) including road furniture.
Road F :- Providing Over Head Gantry board at km 0/2 of Dharapuram Bye pass road (Phase -II) Upputhuraipalayam to Madukampalayam pirivu (SH 172) including road furniture.
Road G :- Providing Over Head Gantry board at km 0/2, 12/0 of Udumalpet - Palladam road (SH 87) including road furniture.
Road H :- Providing Over Head Gantry board at km 18/6 of Pollachi - Dharapuram - Karur road (SH 21) including road furniture.
Road I :- Providing Cantilever Gantry board at km 25/10 of Pollachi - Dharapuram - Karur road (SH 21) including road furniture.
Road J :- Providing Cantilever Gantry board at km 15/4L, 15/6R of Udumalpet - Dharapuram road (SH 97) including road furniture.
Road K :- Providing Over Head Gantry board at km 18/10 of Kangayam - Kodumudi road (SH 189) including road furniture.
Road L :- Providing Metal crash barrier at km 18/0-25/0 of Udumalpet - Senjeri hills road (MD 511)
Road M :- Providing Over Head Gantry board at km 1/6 of Dharapuram - Pollachi road (MD96) including road furniture.
Road N :- Providing Cantilever Gantry board at km 0/8 of Dharapuram - Poolavadi road (MD 884) including road furniture.
Road O :- Providing Over Head Gantry board at km 0/2, 7/0, 10/2, 15/4 of Udumalpet - Chinnar road (MD509) including road furniture.
Road P :- Providing Cantilever Gantry board at km 9/8, 17/2, 20/0 of Udumalpet Senjiri hills road (MD 511) including road furniture.
Road Q :- Providing Cantilever Gantry board at km 18/0, 21/2, 32/2 of Anaimalai - Poolankinar road (MD 22) including road furniture.
Road R :- Providing Cantilever Gantry board at km 11/2 of Udumalpet - Thirumoorthy salai (MD 512) including road furniture.
Road S :- Providing Cantilever Gantry board at km 0/2 of Udumalpet - Komaralingam road (MD 510) including road furniture.
Road T :- Providing Cantilever Gantry board at km 2/8 of Dhali - Komaralingam road (MD 94) including road furniture.
Road U :- Providing Over Head Gantry board at km 0/2 of Udumalpet - Chinnar road - Amaravathi nagar road km 15/6 (MD 167) including road furniture.
Road V :- Providing Metal crash barrier at km 5/6-6/10 of Modakkupatti - Thirumoorthi Nagar road
Road W :- Providing Metal crash barrier at km 30/2 of Erisanampatti - Dhali road "
TRN :
732965
|
Tirupur - Tamil Nadu
Contract Value :
2.66 Crore |Agency Name :
Highway Department