You have searched for tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

3301 Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939) B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934) C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
3302 Widening, Improvements and Improvements to Riding Quality to Government Roads including Curve widening, widening of slab culvert, construction of Drain and Retaining wall and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-46) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 0/0 - 1/0 including Widening Slab Culvert at Km 0/6 (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1326) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 9/2 - 11/6 including Widening the curve at 10/10, 11/2, Construction of Retaining wall (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1336) 3) Construction of Drain at km 0/2 of Alavaipatti road (01-CRIDP-19-20-O-2679) 4) Improvements of V C C road to Singalantha puram road (via) Patchal. at km 0/0 - 4/0 including Construction of Retaining Wall including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3672) 5) Improvements to Riding Quality at km 9/6 - 10/8 of Mettala-Mullukurichi-Periyakombai road (MD853) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4570)"
3303 Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778) B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042) C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065) D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066) E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
3304 Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Retaining wall, Widening of Slab Culvert and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-45) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 1/0 - 2/0 including widening slab culvert at Km 1/4 and Construction of Retaining Wall (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1328) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 6/6 - 9/2 including dip raising at Km 6/10, 7/2, 7/4, 7/6 (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1332) 3) Construction of Retaining wall at km 2/2 of Rasipuram - Attur road (MD402) (01-CRIDP-19-20-M-1356) 4) Improvements to Riding Quality at km 48/500 - 50/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road (SH95) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4554) 5) Improvements to Riding Quality at km 2/8 - 5/4 of Rasipuram Byepass road (MD) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4562) 6) Improvements to Riding Quality at km 2/0 - 3/0 of Rasipuram - Attur road (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4563)"
3305 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Peravurani & Pattukottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2431, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 0/8, Retaining wall at km 0/6 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2432, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 6/0 - 7/6 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 6/6, Retaining wall at km 6/6 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-I-4398, Improvements to Riding Quality at km 4/4 - 6/6 of Palayam - Palamunthi road including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-I-4400, Improvements to Riding Quality at km 0/0 - 1/8 of Vettikkadu - Santhankadu road including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4401, Improvements to Riding Quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of Muthupettai - Mimisal Road including upkeeping for a period of 60 months Road F, 01-CRIDP-19-20-O-2448, Reconstruction of RCC slab culvert across CMP canal at km 1/6 of Kalagam - Karambakkadu road including upkeeping for a period of 60 months Road G, 01-CRIDP-19-20-O-2449, Reconstruction of RCC slab culvert across CMP canal at km 12/2 of Kattaiankadu - Ukkadai - Kollukkadu road including upkeeping for a period of 60 months Road H, 01-CRIDP-19-20-O-2489-, Construction of Retaining wall at km 2/8 of Peravurani - Marungappallam road "
TRN : 704962 |  Trichy - Tamil Nadu
Contract Value : 5.52 Crore | Agency Name : Highway Department
Tender award for widening, improvements, improvements to riding quality, reconstruction of slab culvert, construction of retaining wall including up keeping for a period of 60 months in govt. roads in respect of peravurani & pattukottai (h), c&m subdivision. road a, 01-cridp-19-20-o-2431, improvements of kattaiankadu - ukkadai - kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 0/8, retaining wall at km 0/6 including upkeeping for a period of 60 months road b, 01-cridp-19-20-o-2432, improvements of kattaiankadu - ukkadai - kollukkadu road at km 6/0 - 7/6 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 6/6, retaining wall at km 6/6 including upkeeping for a period of 60 months road c, 01-cridp-19-20-i-4398, improvements to riding quality at km 4/4 - 6/6 of palayam - palamunthi road including upkeeping for a period of 60 months road d, 01-cridp-19-20-i-4400, improvements to riding quality at km 0/0 - 1/8 of vettikkadu - santhankadu road including upkeeping for a period of 60 months road e, 01-cridp-19-20-i-4401, improvements to riding quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of muthupettai - mimisal road including upkeeping for a period of 60 months road f, 01-cridp-19-20-o-2448, reconstruction of rcc slab culvert across cmp canal at km 1/6 of kalagam - karambakkadu road including upkeeping for a period of 60 months road g, 01-cridp-19-20-o-2449, reconstruction of rcc slab culvert across cmp canal at km 12/2 of kattaiankadu - ukkadai - kollukkadu road including upkeeping for a period of 60 months road h, 01-cridp-19-20-o-2489-, construction of retaining wall at km 2/8 of peravurani - marungappallam road "
3306 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 719199 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
3307 Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939) B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934) C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
3308 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 719200 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
3309 Widening, Strengthening, Improvements, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pattukkottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2425-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 4/0-6/0 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2426-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 6/0-7/0 including construction of Retaining wall at Km 6/2,6/4 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2397-,Widening from Single lane to Intermediate lane and Strengthening of Nattusalai-Thuvaranguruchi road at km 0/0-2/0 including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2440-, Improvements of Vadiyakkadu-Kalyanaodai road at km 4/0-7/4 including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-O-2441-, Improvements of Kumbakonam - Mannarkudy - Adirampattinam road KM 50/4 to Thirumakkottai road at km0/0 -2/0 including upkeeping for a period of 60 months "
3310 Widening and Improvements to Government Roads including Construction of CD works, Retaining wall and Providing RCC centre median and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-34) The Following works are involved in this package 1) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/0-2/4, including Construction of Retaining Wall at Km.2/2 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0366) 2) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/4-2/8, including Construction of Retaining Wall at Km.2/6 & 2/8, Widening of Pipe Culvert at Km.2/8 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0367) 3) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/8-3/2, including Construction of Retaining Wall and Widening of Slab culvert at Km.2/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0370) 4) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/2-3/8, including Widening of Slab culvert at Km.3/6 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0368) 5) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/8-4/2, including Construction of Retaining Wall Km.4/2, Reconstruction of Box culvert at Km.3/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0369)"
TRN : 719203 |  Salem - Tamil Nadu
Contract Value : 7.49 Crore | Agency Name : Highway Department
Tender award for widening and improvements to government roads including construction of cd works, retaining wall and providing rcc centre median and up keeping for a period of 60 months in mettur (h) c&m sub division (package-34) the following works are involved in this package 1) widening from three lane to four lane and improvements of thermal power plant road at km.2/0-2/4, including construction of retaining wall at km.2/2 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0366) 2) widening from three lane to four lane and improvements of thermal power plant road at km.2/4-2/8, including construction of retaining wall at km.2/6 & 2/8, widening of pipe culvert at km.2/8 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0367) 3) widening from three lane to four lane and improvements of thermal power plant road at km.2/8-3/2, including construction of retaining wall and widening of slab culvert at km.2/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0370) 4) widening from three lane to four lane and improvements of thermal power plant road at km.3/2-3/8, including widening of slab culvert at km.3/6 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0368) 5) widening from three lane to four lane and improvements of thermal power plant road at km.3/8-4/2, including construction of retaining wall km.4/2, reconstruction of box culvert at km.3/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0369)"

Get Tamil Nadu Awarded Tender Alert...

557744

Advertisment
Advertisment