Latest and live tenders published in bangladesh. Click on any tender to view further details.
supply of split up of begumganj 11 kv o/h feeder from narinda 132/33/11 kv substation under nocs swamibagh division.
vertical extension of 7th floor to 19th floor of the 20- storied nccom center at police headquarters fulbaria sub-head supply installation testing and commissioning of hvac system 600 ton central ac from 10th to 19th floor with all associated works.
constuction of 72.00m long rcc girder bridge on sujauddin kheyghat - rodpara bazar road at ch.400m road id504284033 upazila
construction of additional class room of panchgaon gps under pedp-4 upazila
printing & installation of vinyl & reflective safety sticker installation of steel sheet frame & associated civil works as per ohsas guideline at the substations under
construction of 02 storied 07 nos rcc wash block having 4 storied foundation for mt & boys and ft & girls including all associated construction sanitary plumbing & electrical works under primary education development program-4 pedp-4 at different upazilla in during fy-2020-2021.
repair and maintenance of dyke including removal of silt from bed of canal i secondary irrigation canal-7 sic-7 in between from km 0.00 to km 0.900 total 0.900 km ii secondary irrigation canal-8 sic-8 in between from km 0.00 to km 0.700 total 0.700 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
repair and maintenance of dyke including removal of silt from bed of canal i secondary irrigation canal-5 sic-5 in between from km 0.00 to km 2.500 total 1.00 km ii secondary irrigation canal-6 sic-6 in between from km 0.00 to km 1.250 total 0.900 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
repair and maintenance of dyke including removal of silt from bed of canal i secondary irrigation canal-3 sic-3 in between from km 0.00 to km 0.900 total 0.900 km ii secondary irrigation canal-4 sic-4 in between from km 0.00 to km 0.700 total 0.700 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.
repair and maintenance of dyke including removal of silt from bed of canal i secondary irrigation canal-1 sic-1 in between from km 0.00 to km 0.700 total 0.700 km ii secondary irrigation canal-2sic-2 in between from km 0.00 to km 1.200 total 1.200 km in connection with nnip block-a/1 under repair & maintenance budget of o&m division-1 during the fy 2020-21.