Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of pc lenovo desktop m710q tiny ase model 10t8cto1ww component description cpu type intel core i7 adapter adapter for tiny vesa mount vesa mount tiny speakers internal speaker tiny first graphic dongle dp to hdmi package pkg tiny w/odd ww except c thermal thermal k it 35w tiny pulications pulication - araic/english mouse us calliope mouse lack m.2 storage card 512g solidstate drive m.2 pcie opal keyoard us trdtnl k k 470 ara us card us 3.0 card platform tiny 360 first optical drive slim dvd ramo 9.0mm no os memory 8g ddr4 26 66 sodimm processor intel core i7-8700t processor 12m cache, 2.40ghz warranty 3 year on-site preload language no operating system country uae preload os no operating system preload type standard image graphic card integrated graphic cardethernet integrated ethe rnet k type us traditional k k power adapter tiny 135w adapter, monitor 24 inch lenovo screen
supply of attery operated crimping tool; intercale ap130-c2; with spare attery, carrying case and hexagonal dies ranging from 16sq.mm to 300 s q.mm copper & aluminum sets.
supply of earth clamp tester make: fluke model: 1630
new ivr recording prompts per line for contact center ivr enhancement project with emirati araic voice and ritish english voice f or contact center ivr enhancement project, cisco ata 192 multiplatform analog telephone adapter for contact center direct hotlines and fax, plantronics encorepro hw710 headsets for contact center agents.for more details contact:krishnaraj muduvadath phone: 04-32-22084 # moile: 971555506312krishnaraj.muduvadath@dewa.g ov.ae
supply of filter, reathing filter, type-lu n/hc2 gg 20 w 1.0/-310, material no. 0318 813, p/n. 3, make: hydac, for diverter damper hydraulic s ystem
supply of generator set autostart 700 series controller; model: as3/e23o, make: murphy; part no: 76-70-0025; 230v; 50hz; keyswitch selectale o perating mode: auto, test/manual, lamp test, off/reset; with 7 fault/status led indicators: mains fail, start fail, overspeed, low o il pressure, high engine temperature, charge fail, plant fail; operating voltage: 18 # 32v dc; made in u.s.a.
technical and general specification of outsourcing work m station, jeel ali power station. name of the work: refilling / pressuriz ation / hydrotest / valve inspection & overhaul of fm200 cylinder & valve make: kidde at m stn, dewa, jeel ali; no. of cylinders - 302 kg fm200 fill # 1 nos. scope of work: 1#get ptw permit to work and lc line clearance documents from dewa. 2#sumit the ris k assessment form and method statement, to get a ptw, contractor has to sumit relevant risk assessment & tool ox talk form and metho d statement. 3#disconnect the cylinder with all the safety procedure & arrange for temporary alternative arrangement for activatio n of fm200 in engineering room. 4#transport the cylinder from the plant to your workshop for refilling fm200 302kg and n2 pressu rization up to the required pressure. 5#perform the leak test on the cylinder, if there is leak, contractor to e rectified. 6#valv e servicing & leakage testing to e done. 7#return the cylinder within 7 days with all safety procedure after refilling fm200 and n2 pressurization. 8#work procedures and transportation to e done as per civil defense and duai municipality rules and regulations. 9 #normalize the temporary arrangement made during removal and test the system in front of dewa representative. 10#work to e done y oem/representative. 11#sumit test certificate for the cylinder, valid for 5 years. 12#warranty of 1 year. 13#party required to vi sit site efore quotation. for contact mr. ahmed 04 8161633 or ahmed.auserriya@dewa.gov.ae / mr. vinu 04 8161598 or vinu.thottappill y@dewa.gov.ae, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu.meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa willsupply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note -tank will e given one y one after completion first one for site visit contact persons: mr. arad moile: 0504611635
supply of fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn.contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assistfor entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completion first one for site visit contact persons:mr. arad moile: 0504611635
rewinding and servicing of aux transformer cooling fan motor 0.25kw. motor name plate: make: toshia, type: ik, ratting: 0.25kw, vol tage: 380, current: 1.1, f: 50 hz, rpm: 710, poles: 8, rating: s1, ins.cl: f 1 rewind the motor. 2 replace de/nde earings. 3 mot or painting. 4 warranty shall e 6 months start from delivery date. 5 pick and drop the motor from japs l1 station dewa. for more detail contact mr. manikandan/mudassar 048024555, 0562721022.
g station fuel tank trench cleaning work. oily water and sludge cleaning work location: g-station 1 main trench: 1.8 m x 75 m x 1.5 m oily water to e removed: 1.8 m x 75 m x 0.20 m 2 trench: 1.8 m x 9.0 m x 1.5 m oily water to e removed: 1.8 m x 9.0 m x 0.20 m 3 pumping station near la 1.5 m x 1.5 x 2.0 m. oily water to e removed 1.5 m x 1.5 x 1.0 m. contractor scope: e fore quote, do site visit and understand scope of work and take measurement for oily water. 1#transfer of usale oil from drain oil collecting tank/ interceptor to the heavy fuel oil tank. 2 pump out the waste oily & water mixture from the pits to the oil tan ker y using pneumatic transfer pump to hazardous waste container 3 degassing of drain oil collecting tank/interceptor 4 otain m an entry permit from third party. 5 removal of sludge from the pits 6contractor shall have valid permit form duai municipality to dispose of the waste oily water 7 contractor shall arrange all the required equipment like compressor; pneumatic pumps, hose, chemicals for desludging, cleaning and transferring oil and the waste. 8 the contractor shall sumit the method statement and risk assessment along with the work permit request dewa scope 1 dewa will supply water free of cost 2 dewa engineer i n charge will assist for entry permit to work etc. general terms and conditions: 1 the contractor should apply for work to permit in advance efore commencing the work. 2 along with the work to permit, the contractor should sumit the method statement, time and work schedule ar chart y indicating each activity & risk assessment. 3 entry pass for the workmen should e applied with visa, passp ort and laor card copies, for each in advance. persons whose names are not availale in the list will not e permitted inside the powe rhouse. 4 entry pass for the vehicle should e applied with copies of registration and for drivers with copies of their driving lice nse. 5 no ojection certificate from the su-contractor should e provided if the contractor hiring manpower. 6 the contractor includ ing group or personal insurance should provide all the safety gear for the manpower. 7 toolox talks should e given y the contractor efore the start of ever days# work y supervisor and the copy should e sumitted to dewa staff. 8 hot work permit should e applied i n advance if required in daily asis. 9 hot permit should e approved y the concerned dewa staff and should ensure the availaility of fire extinguishers efore the start of work. site contact person: arad a moile no: 0504611635 / 0408044632 e mail id: hausahea@dew a.gov.ae