Latest and live tenders published in united arab emirates. Click on any tender to view further details.
to carry out replacement of dn-1800 ruer expansion joint project description: to carry out replacement of dn-1800 ruer expansion j oint y removing existing joint at e-stn sea water intake pump common discharge line scope of work: 1#dismantling existing ruer expansion joint y removing all flange olts 2#refixing of new ruer expansion ellow which is supplied y dewa 3#the entire fastener olts nuts and etc for fixing the ellow to e arranged y contractor. 4#all tools and tackles manpower for dismantling and refixing t he ellow shall e arrange y the contractor, a detail and method of jo shell e sumitted for dewa engineer for review efore actual comm encement of the jo 5#the contractor awarded with the jo shall follow the relevant procedure in comply with dewaregulations 6#cont ractor shall clean and remove complete waste generated during work on daily asis. 7#consumales, equipment and tools required for th e jo shall e arranged y the contractor 8#risk assessment covering complete activities shall e sumitted against the request for gate passes 9#responsile supervisor from the contractor shall conduct tool ox talk to their staff on daily asis. 10 lifting tool, tack les and electrical hand tools used for the jo shall e in good working condition note-dewa will provide scaffolding and crane, requi red for the jo with relevant safety standards. water and electric supply required for the jo will e arranged y dewa free of cost. m r. mehoo sahe / mohamed ahmed aljaziri engineers - moile 0504611674/0509444344 shalle contracted for more information and site visi t
technical and general specifications, outsourcing work l station phase ii, jeel ali name of work: ·#hrsg-82 flow grid top expan sion ellow replacement, qty-06 nos period of work: 10 days during shut down of hrsg-82 hrsg-81 will start from 06.10.2018 scope of work: ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, compl exities, safety measures etc., efore he sumit his id. ·#to get a ptw, hwp contractor has to sumit risk assessment forms and method statement prior to start the work. ·#check condition suitale to carry out work. conduct site survey and safety inspection to assess the working environment. ·#if working environment is safe proceed the following steps, ·#a safety meeting will e held toevaluate the risk involved in methods to e used. risk assessment and tool ox talk to e given to the employees. ·#moilize the laor, equipmen t, tools, etc. on 24 hrs. notice period. ·#removal of the old/damaged expansion ellow. ·#removal of the old insulation from inside of the pipe. ·#putting of new high temperature ceramic insulation inside the pipe from top of hrsg as well as from ottom of hrsg. ·#fixing of the new expansion ellow. ·#jointing of the expansion ellow with high temperature jointing iron ox. ·#final tighten of the expansion ellow. ·#housekeeping and disposal of waste from the jo to e done efore site clearance. ·#inspection and approval from dewa personnel. ·#de-moilization and site clearance ·#previous experience po # to e provided for the same type of jo fromdew a or any other well-known company. ·#work completion report, full repairing reports & warranty for 12 month to e sumitted to dewa. ·#drawing for the expansion ellow attached for your reference. dewa scope ·#insulation pins, insulation and cladding sheets if r equired. ·#nut for ellow fixing ·#high temperature ceramic insulation. ·#scaffolding if required. ·#air, water and electricity. contractor scope of material supply ·#required skilled manpower, tools and consumales ·#all personal protective equipment. ·#ri sk analysis and method of statement of the jo. ·#detailed report after completion of jo. ·#tested lifting equipment whichever requ ired for jo. ·#all tools & tackles and jointing iron ox. drawing:
supply of oily water, sea water and chemicals draining pits cleaning and disposal service jo, located at k-station disposal of 85, 000 gallons oily water y approved municipality contractor
installation of ss tues 220 meters approximate in wh-1a hydraulic system at e station from flow divider to cylinder including flexile hose assemly, pressure testing & flushing contractor#s scope:- 1.#jo will e executed at site only. 2.#removal of existing tu e, clamps and hose assemlies. 3.#welding of new clamps with all attachments on position. 4.#farication and installation of ss tues. 5.#connecting with hose assemlies. 6.#loop and pressure test the lines for any leakages 1.5 times of working pressure. 7.#flush th e tues to achieve nas class level 7. 8.#commission the system to the satisfaction of client. dewa scope:- 1.#line clearances, neces sary permits and co-ordination with other departments. such as instrument & electrical connections removal. 2.#allthe rel ated ss tues, hoses and other spares including hydraulic oil. 3.#crane & fork lifts. 4.#electrical power & air supply. 5. ndt 6 . scaffolding, installation of ss tues 220 meters approximate in wh-1 hydraulic system at e station from flow divider to cylinder including f lexile hose assemly, pressure testing & flushing contractor#s scope:- 1.#jo will e executed at site only. 2.#removal of existing tue, clamps and hose assemlies. 3.#welding of new clamps with all attachments on position. 4.#farication and installation of ss tues. 5 .#connecting with hose assemlies. 6.#loop and pressure test the lines for any leakages 1.5 times of working pressure. 7.#flush the tues to achieve nas class level 7.8.#commission the system to the satisfaction of client. dewa scope:- 1.#line clearances, necess ary permits and co-ordination with other departments. such as instrument & electrical connections removal. 2.#all the rela ted ss tues, hoses and other spares including hydraulic oil. 3.#crane & fork lifts. 4.#electrical power & air supply. 5. ndt 6. scaffolding, installation of ss tues 220 meters approximate in wh-1c hydraulic system at e station from flow divider to cylinder including flexile hose assemly, pressure testing & flushing contractor#s scope:- 1.#jo will e executed at site only. 2.#removal of existing tu e, clamps and hose assemlies. 3.#welding of new clamps with all attachments on position. 4.#farication and installation ofss tues. 5.#connecting with hose assemlies. 6.#loop and pressure test the lines for any leakages 1.5 times of working pressure. 7.#flush th e tues to achieve nas class level 7. 8.#commission the system to the satisfaction of client. dewa scope:- 1.#line clearances, neces sary permits and co-ordination with other departments. such as instrument & electrical connections removal. 2.#all the rel ated ss tues, hoses and other spares including hydraulic oil. 3.#crane & fork lifts. 4.#electrical power & air supply. 5. ndt 6 . scaffolding
supply of coil ignitor encapsulated with spark tip with 5m hofr cale, type: sa91- 1, ref: 4072, hazardous area rating: 11ct6, certificate no: sira 02atex5301x, input: 175 vdc, output: 8750 vdc, atex category: ex 112g, drawing.no: a3/ig/9600, make: igniters comustion enginee r ltd. lichfield, ws149ux, england
supply of tue; ss316; 6 mm x 1.0 mm thickness; 6m length, connector male 1/4 npt x 6mm o.d tue ss part no. m6msc1/4n make: parker, tee connector union male 6 mm metric tuing prkr p/n.etm6ssp/r. 14847, needle valve, process connection 1/4.p/n : 4a-u6lr-t-ss, parker
supply of suonder eacon, make:roshni sounder tyco part no 171.392.dimentions: 93dia ? 105d mm deep ase.color red, out voltage 9-24 vdc, t y pical current, sound out put 102d, horn/stroe 12/24v dc red, make: system sensor mexico, model: p2 rk, wall mounted 15, 15/75, 30, 75, 110 candela with weather proof ac k ox.
supply of valve, temperature control, size- 50 a, rating-150 l, tee configuration, flanged, valve type - gv, end connection - rf flanged ansi 1 6.5 150 class, service media - lue oil iso vg 46, serial numer-e66287-001, housing material - stainless steel, model no. - 2crj 1350 1-00-aa, set temperature - 57 deg. c, valve make-amot controls, england, temperature regulator valve for lue oil header, kks no. - * *ekh10aa006, main equipment-fuel gas compressor, seat, olted in, for temperature control valve, reference numer- 3, part numer- 9585l001, for valve make - amot controls, rating - 150 l, size - 50 a, service media - lue oil iso vg 46, serial numer - e66287-001, model no. - 2crj13501-00-aa, set tempera ture - 57 deg. c, temperature regulator valve for lue oil header, kks no. - **ekh10aa006, main equipment-fuel gas compressor, sleeve, for temperature control valve, reference numer- 4, part numer- 1182, for valve make - amot controls, rating - 150 l, s iz e - 50 a, service media - lue oil iso vg 46, serial numer - e66287-001, model no. - 2crj13501-00-aa, set temperature - 57 deg . c, temperature regulator valve for lue oil header, kks no. - **ekh10aa006, main equipment-fuel gas compressor, o-ring seal, for temperature control valve, reference numer- 7, part numer- 1183l002, for valve make - amot controls, rating - 15 0 l, size - 50 a, service media - lue oil iso vg 46, serial numer - e66287-001, model no. - 2crj13501-00-aa, set temperatur e - 5 7 deg. c, temperature regulator valve for lue oil header, kks no. - **ekh10aa006, main equipment-fuel gas compressor, element, assemly, standard, for temperature control valve, reference numer- 8, part numer- 1096x, code no.-01, forvalve make - a mot controls, size - 50 a, rating - 150 l, , service media - lue oil iso vg 46, serial numer - e66287-001, model no. - 2crj1 3501- 00-aa, set temperature - 57 deg. c, temperature regulator valve for lue oil header, kks no. - **ekh10aa006, main equipment-fue l ga s compressor, gasket, for temperature control valve, reference numer- 9, part numer- 1094, for valve make - amot controls, rating - 150 l, siz e - 50 a, service media - lue oil iso vg 46, serial numer - e66287-001, model no. - 2crj13501-00-aa, set temperature - 57 de g. c, temperature regulator valve for lue oil header, kks no. - **ekh10aa006, main equipment-fuel gas compressor.
supply of eye olt; m6, shoulder type machinery eye olt, forged steel-quenched and tempered, fatigue rated 1-1/2 times working load limit, as m e 30.26. to e supplied along with test certificate valid for one year.
supply of eri circulation pump, model: hp-1253, flow range: 16-41 m³/hr, part no: 50002-01, serial no: hp11304006, make: eri- usa