Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of station desal need to install ellow expansion joints on distillate inlet line of ls fs grp pipe, total 8 expansion joints sco pe of work:- grp lines dn 400 mm to e cut and re lamination after installing of expansion joints for more information, please c ontact: tamer gamal el di el sayed
refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no.#gas#concentration of gas#capacity of cylinder# 1#co#1200 ppm alance n2#10 liter# 2#no#650 ppm alance n2#10 lit er 3 co2 16 % alance n2 10 liter 4#so2#900 ppm alance n2 10 liter 5#nitrogen#99.999% purity 10 liter contact sujeet kumar mau, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no gas concentration of gas#capacity of cylinder 1 co 1200 ppm alance n2 10 liter 2no 650 ppm alance n2 10 lit er 3 co2 16 % alance n210 lite 4 so2 900 ppm alance n2 10 liter 5#nitrogen 99.999% purity 10 liter, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no. gas concentration of gas capacity of cylinder 1 co 1200 ppm alance n2 10 liter 2 no 650 ppm alance n2 10 lit er 3 co2 16 % alance n2 010 liter 4 so2 900 ppm alance n2 10 liter 5 nitrogen 99.999% purity 10 liter, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no.#gas#concentration of gas#capacity of cylinder# 1#co#1200 ppm alance n2#10 liter# 2#no#650 ppm alance n2#10 lit er# 3#co2#16 % alance n2#10 liter# 4#so2#900 ppm alance n2#10 liter# 5#nitrogen#99.999% purity#10 liter#
supply of d-oiler ng all valves inspection servicing and testing location : d-station whr and ngprs quantities: 12 inch all valve 03 nos 10 inch gloe valve # 02 nos 3 inch all valve 3 nos 2 inch control valve - 01 no contractor scope 1 servicin g/refurishment 2 replacement of soft seals/gaskets y the contractor. contractor to provide necessary spares 3 test certificate t o e provided after servicing 4 transport the valve from the dewa site to contractor workshop and delivery to the site. 5 the contr actor should visit the site efore quoting for the work. 6 work to e completed within 15 days warranty: one year contact person: a shokgiri satheesh moile: 0529174058/0504069988 email: ashokgiri.gunsai dewa.gov.ae satheeshkumar.ramadoss dewa.gov.ae
scope of work: application of high temperature paint and cleaning for diesel generator exhaust pipes. * 6 - scaffolding will e pro vided y dewa - paint: sigma zinc 158-75microns +sigma therm 540-50microns total dft 125 microns.30%as - site visit is mandatory ef ore summiting the offer - warranty: 5 years - cleaning must e carry efore the paining sand lasting to sa2.5 - service provider is required to provide all consumales needed for the jo - exhaust pipe temperature can reach up to 478 degrees celsius - drawing c an e provided upon request - for any questions and further details, please contact: husain adeen 0506856250 email: husain.irahim@de wa.gov.ae, scope of work: application of high temperature paint and cleaning for diesel generator exhaust pipes. * 4 - scaffolding will e pro vided y dewa - paint: sigma zinc 158-75microns +sigma therm 540-50microns total dft 125 microns.30%as - site visit is mandatory ef ore summiting the offer - warranty: 5 years - cleaning must e carry efore the paining sand lasting to sa2.5 - service provider is required to provide all consumales needed for the jo - exhaust pipe temperature can reach up to 478 degrees celsius - drawing c an e provided upon request - for any questions and further details, please contact: husain adeen 0506856250 email: husain.ira
transportation of cooling fan to and fro from site. 2. repair of cooling fan 6 months warranty. 3. performance checks during performance checks, parameters should match with name plate data especially the current. 4. test reports to e shar ed to dewa. contact person: adul asheer arapoyil
supply of uv ultra-violet grp coating for l1 desal 65. all contractors are requested please have a site inspection efore sumit them quotatio n
supply of uv ultra-violet grp coating for l-2 desal 92. all contractors are requested please have a site inspection efore sumit them quotati on
supply of uv ultra-violet grp coating for l-2 desal 93. all contractors are requested please have a site inspection efore sumit them quotati on
dewatering of sewarge tank at h station aweer, waste water disposal, 10, 000 gallon capacity. the trip should e on call asis as an d when required. contact person: sahim rashid
supply of uv ultra-violet grp coating for l-2 desal 94. all contractors are requested please have a site inspection efore sumit them quotati on