Latest and live tenders published in united arab emirates. Click on any tender to view further details.
replace the damaged settled down interlock tiles, supply and fixing of new interlock tiles over the compacted road ase of thickness 20cm as per dewas approval, construction of rain water gutter of size 30cm x50cm with heavy duty gartings as per dewas approval, construction of soak pit for collecting rainwater of size 2m x 2mx5m with heavy-duty cover as per dewas approval, any other items of work not included in the aove items, ut requirement of which is included in specifications and site requirements, tenderer shall clearly descrie the item and quote with unit price
supply, fix and operate automatic steel sliding gate including associated civil works, underground power caling works etc at na jma pumping station, any other items of work not included in
al quoz installation of doule hand rail on the wall side welding of doule handrail on handrail side paint works with dark grey colo r# hudaia installation of doule hand rail on the wall side welding of doule handrail on handrail side paint works with dark grey col or# specifications as elow: profile of handrail 4 cm dia for other details refer attached picture
work includes the trouleshooting of the faulty hmi modular concentration monitor, mcm34 make: centec used for the cds 21 caronation system used in palm jumeirah ro plant. this may include the necessary programming and re-configuration of the hmi. ven dors are requested to carry out site survey to understand the complete site requirement conditions scope of works.
supply of station desal need to install ellow expansion joints on distillate inlet line of ls fs grp pipe, total 8 expansion joints sco pe of work:- grp lines dn 400 mm to e cut and re lamination after installing of expansion joints for more information, please c ontact: tamer gamal el di el sayed
refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no.#gas#concentration of gas#capacity of cylinder# 1#co#1200 ppm alance n2#10 liter# 2#no#650 ppm alance n2#10 lit er 3 co2 16 % alance n2 10 liter 4#so2#900 ppm alance n2 10 liter 5#nitrogen#99.999% purity 10 liter contact sujeet kumar mau, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no gas concentration of gas#capacity of cylinder 1 co 1200 ppm alance n2 10 liter 2no 650 ppm alance n2 10 lit er 3 co2 16 % alance n210 lite 4 so2 900 ppm alance n2 10 liter 5#nitrogen 99.999% purity 10 liter, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no. gas concentration of gas capacity of cylinder 1 co 1200 ppm alance n2 10 liter 2 no 650 ppm alance n2 10 lit er 3 co2 16 % alance n2 010 liter 4 so2 900 ppm alance n2 10 liter 5 nitrogen 99.999% purity 10 liter, refilling of standard caliration gas in 10ltr aluminum cylinder for cems analyzer. caliration gas and hydro test certificate to e p rovided. s. no.#gas#concentration of gas#capacity of cylinder# 1#co#1200 ppm alance n2#10 liter# 2#no#650 ppm alance n2#10 lit er# 3#co2#16 % alance n2#10 liter# 4#so2#900 ppm alance n2#10 liter# 5#nitrogen#99.999% purity#10 liter#
supply of d-oiler ng all valves inspection servicing and testing location : d-station whr and ngprs quantities: 12 inch all valve 03 nos 10 inch gloe valve # 02 nos 3 inch all valve 3 nos 2 inch control valve - 01 no contractor scope 1 servicin g/refurishment 2 replacement of soft seals/gaskets y the contractor. contractor to provide necessary spares 3 test certificate t o e provided after servicing 4 transport the valve from the dewa site to contractor workshop and delivery to the site. 5 the contr actor should visit the site efore quoting for the work. 6 work to e completed within 15 days warranty: one year contact person: a shokgiri satheesh moile: 0529174058/0504069988 email: ashokgiri.gunsai dewa.gov.ae satheeshkumar.ramadoss dewa.gov.ae
scope of work: application of high temperature paint and cleaning for diesel generator exhaust pipes. * 6 - scaffolding will e pro vided y dewa - paint: sigma zinc 158-75microns +sigma therm 540-50microns total dft 125 microns.30%as - site visit is mandatory ef ore summiting the offer - warranty: 5 years - cleaning must e carry efore the paining sand lasting to sa2.5 - service provider is required to provide all consumales needed for the jo - exhaust pipe temperature can reach up to 478 degrees celsius - drawing c an e provided upon request - for any questions and further details, please contact: husain adeen 0506856250 email: husain.irahim@de wa.gov.ae, scope of work: application of high temperature paint and cleaning for diesel generator exhaust pipes. * 4 - scaffolding will e pro vided y dewa - paint: sigma zinc 158-75microns +sigma therm 540-50microns total dft 125 microns.30%as - site visit is mandatory ef ore summiting the offer - warranty: 5 years - cleaning must e carry efore the paining sand lasting to sa2.5 - service provider is required to provide all consumales needed for the jo - exhaust pipe temperature can reach up to 478 degrees celsius - drawing c an e provided upon request - for any questions and further details, please contact: husain adeen 0506856250 email: husain.ira
transportation of cooling fan to and fro from site. 2. repair of cooling fan 6 months warranty. 3. performance checks during performance checks, parameters should match with name plate data especially the current. 4. test reports to e shar ed to dewa. contact person: adul asheer arapoyil
supply of uv ultra-violet grp coating for l1 desal 65. all contractors are requested please have a site inspection efore sumit them quotatio n