Latest and live tenders published in all country. Click on any tender to view further details.
project involves civil works to the mantlet and bullet catcher of the firing range at dutson training area, including topsoil replacement, hydroseeding, provision of new fill and other remediation works.
scope of works of this project involves two tasks. the first task involves the internal refurbishment of the sanitary facilities in building g016 and the installation of a new demountable adjacent to building g016. the second task involves the installation of two eye wash facilities and the replacement of a staircase in q069.
works involve but are not limited to egress paths, remediation of handrails, doors, stairs and tactile indicators in eight buildings at gallipoli barracks.
scope of works of this project involves the upgrade to the officers mess and accommodation including the installation of reverse cycle air conditioning and refurbishing the kitchen. the refurbishment of airman accommodation blocks including replacement of external timberwork, carpet, kitchenettes and repaint internally. upgrades to the swimming pool filtration plant including repointing to cracking of stucco finish, internal works including the rectification of rising damp as well as the replacement of the filtration equipment and safety shower.
project involves the following tasks: 1. task 0183-a033-1: demolish buildings a033 and a047 and rebuild 1 new building; 2. task 0183-d018-1: demolish building d018; 3. task q-10827t: demolish building h026 and rebuild a new 150m2 structure; 4. task 183-h038-1: kitchen wall tile replacement; 5. task 0183-h057-1: building h057 entry upgrade and roof sheeting replacement; 6. task 0183j007-1: demolish building j007; 7. task 0183j008-1: demolish building j008; and 8. task 0183j009-1: demolish building j009.
project involves the supply and installation of concrete barricade fencing, boom gates and signage to the lancelin training area.
project involves the construction of a bunded area at the maygar barracks compound. the works include construction of a concrete hardstand complete with concrete barrier kerbs, new stormwater drainage infrastructure, installation of an oil separator to manage any fuel spills in the bunded area, installation of a canopy structure to minimise storm water inflow into the separator and lighting/power to the area.
architectural refurbishment works including external and internal works and services upgrades including electrical, mechanical, fire and hydraulic works to buildings d059, d183 and gh004 at holsworthy barracks and moorebank
scope of works of this project involves excavation and management of potentially contaminated waste materials, plumbing and drainage works, as well as environmental sampling and testing and updating of required documentation and records.
focus of this project is remediating footpaths, car parks and line marking around raaf base point cook and raaf williams laverton. the scope also includes remediating the rainwater drainage on a building and the stormwater drain on the airfield at raaf base point cook.