Latest and live tenders published in australia. Click on any tender to view further details.
scope consists of provision of cctv cameras across the base and causeway for base surveillance and provision of cctv cameras, long range audio device lrad and radar to cover seaward waters. the scope also includes upgrades to emergency radio network system, design and delivery of a radio repeater station, and supply and installation of a kiosk substation.
refurbishment works to approximately ten buildings including roof access system and roofing repair works, painting works, wall and ceiling works, investigative works and replacement and upgrade works at raaf townsville. scope also includes mechanical, electrical and security works as well as conversion of disused armoury into a new office and classroom.
requirement for this project is for a full building management systems bms upgrade at townsville raaf base.
refurbishment works including pit and lid replacement, carpet removal in comms room, replacement of doors and internal and external refurbishment works to building 45 at victoria barracks, sydney.
scope of works of this project involves refurbishment and remediation within the main warrnambool depot building, re-surfacing of the existing site carparks and roads and replacement of the depot’s perimeter fence.
project involves the internal refurbishment and refreshment of building 32 headquarters building including joinery, carpets, paint, blinds and a wall demolition. the works also include the external bird proofing of buildings 32, 54 and 64.
project involves the repairs to communication pit at the defence science and technology group area at edinburgh parks south australia. works require new security lid replacement, new concreted shells and conduit pipes.
project involves the supply, installation and commissioning of two thermal imaging cameras and one cctv camera, along with the associated equipment and services required for control and monitoring of the cameras. the cameras will be mounted on top of the existing fire tower. rectification of non-compliance issues on this tower are also included in the scope of works.
primary objective of the project is to achieve a safer, simplified and asured fuel network by addressing current and immediate deficiencies in the defence fuel supply chain, and risks and issues identified in the defence fuel network review.
primary objective of the project is to achieve a safer, simplified and asured fuel network by addressing current and immediate deficiencies in the defence fuel supply chain, and risks and issues identified in the defence fuel network review.