Latest and live tenders published in australia. Click on any tender to view further details.
works are identified and specified by reference to the ghd design documents in the request documents. the major elements of the fit out include: a architecture i. construction of data processing equipment rooms ii. construction of console rooms with flooded floor plenum iii. construct training rooms iv. construct a video conference room v. construct meeting rooms vi. construct open plan office workspace vii. construct testing workstations area viii. demolition works as shows on the drawings ix. construct partitioning to suit zone 2 and zone 3 security areas, including supply and installation of new hardware and access controls, including the addition of structural silicon to the internal face of existing glazing b electrical i. supply and installation of exposed services and cable trays ii. decommission, demolition, disposal off site of the redundant electrical and communications services as identified iii. the supply, installation, testing, commissioning, maintenance and warranty of the electrical and communications services as identified c mechanical i. decommission, demolition, disposal off site of the redundant mechanical services as identified ii. the supply, installation, testing, commissioning, maintenance and warranty of the mechanical services as identified d fire i. carry out hydraulic calculation to determine the maximum flow and pressure requirement of the sprinkler system within the project refurbishment area. ii. allow to upgrade fire sprinkler pumps and reconnect the existing pipes to the upgraded fire sprinkler pumps. the pump duty shall be based on the above hydraulic calculation. iii. reroute the existing supply main to the roof and reconnect to the existing sprinkler main. iv. replace the ex air-compressor with a new one for the pre-action sprinkler system. v. alter existing sprinkler system as shown on the drawings. vi. provide metal guard to ceiling space and underfloor space sprinklers in jssf racks, jssf & sps consoles and asts room. vii. new sprinklers and pipes in gas bottle storage room. viii. supply and install new monitored isolating valves to enable zone isolation. ix. supply and install drain valve to underfloor sprinkler pipes. the fit out works exclude: a provision and installation of new data processing equipment b provision and installation of the consoles, workstations and furniture items c communications cabling between the equipment rooms and the consoles and the testing workstations.
interested industry partners are invited to attend an industry briefing for land1508 - the special operations capability enhancement and continuous modernisation project project greyfin. this briefing will provide an update on the project and opportunities for industry to engage.
airservices is seeking to identify and engage a contractor to manage and deploy an expansion of airservices current ads-b network 11 additional sites, including the provision of intial training, ongoing support, spares management and other services as set out in the statement of requirements sor.
works include the following:, estate base plan: update the existing ebp to reflect and articulate defence’s vision for raaf base point cook in the short and medium term 0 – 10, and long term to 2040, incorporating all known and planned unit relocations and capability;, works element one: upgrades and asset renewals to ensure safe, reliable and secure access to compliant ict, electricity, gas, water, sewerage, storm water and fuel networks;, works element two: preservation, maintenance, remediation and adaptive reuse of heritage assets buildings 33 and 87 and relocation of 21sqn to building 87;, works element three: construction of approximately 1km new fencing along the southern perimeter of the base to prevent unauthorised access and repair of damage to existing perimeter fence if required;, works element four: facilities to support current 21sqn hq capability, in the event that 21sqn hq cannot be relocated into the adaptively reused building 87 works element two;, works element five: redevelopment of the raaf museums customer entrance façade, construction of one sided shed for external aircraft exhibit to accommodate a c 130 and upgrade of existing services to ablutions in building 164; and, works element six: subject to government approval construction and refurbishment of facilities to support the potential relocation of training units, reserves, operational units, logistics units and defence schools to raaf base point cook, establishment of support facilities at raaf base point cook.
australia-singapore military training initiative asmti will see the delivery of enhanced military training areas in central and north queensland. under the asmti, singapore will invest approximately aud 2.25 billion for the commonwealth to acquire, design, develop and construct military training areas through expanding the existing shoalwater bay training area swbta and establishing a new training area near greenvale, in north queensland. the construction work at the new training area near greenvale is expected to be delivered in two phases, early and main works.
ervices include: embedded industry partner services, which will require the successful applicant to leverage its expertise, experience and resources to develop and deliver the directorates program of infrastructureprojects in collaboration with and on behalf of the directorate industry partner services; and subject to the contract and where this represents value for money for defence, project management and contract administration services pmca services, and, where required, to provide certain other services such as design services to support the development anddelivery of individual infrastructure projects together the services.
services include design and related services in respect of the following works: · new facilities to provide exhibition space, storage, maintenance, training and administrative functions; and · new services and in-ground infrastructure; to meet requirements for the display, maintenance and educational use of the combined heritage collections of the royal australian armoured corps and royal regiment of australian artillery.
services include design and related services in respect of the following works: est02014 anglesea barracks mid term refresh, upgrade and refurbishment of existing working accommodation and training facilities;, upgrade of existing services and in-ground infrastructure, including road, electrical, fire, potable water, sewer, gas and stormwater services; and, new working accommodation.
facilities included in the works, which the consultant will be required to construct include: one maintenance hangar for one aircraft; and a secondary p-8a squadron facilities collocated with the maintenance hangar to host up to four 4 deployed 92wg / p-8a sqn crews, based on crew rest cycles, and a permanent staff of seven; an operational zones including a sensitive compartmented information facility. pavement and airfield lighting works are excluded from this package of works
project includes the construction of a land based test site development and sustainment at 303-355 st kilda road, st kilda sa to support the introduction into service and sustainment of the hunter class frigate for the royal australian navy. the works include the following: i.the construction of a facility with two levels with approximately 14, 000 m2 in total area, comprising: a.reception, security office and administration open work areas, .auditorium and meeting rooms, receipt or dispatch area, mechanical, electrical and communication workshops; d.rooms with high security classification; e.open space work areas; f.communication and patch rooms; g.collaboration areas, breakout space and amenities; and h.ups, battery room, hv and lv switch rooms and plant areas. ii.the construction of new engineering services infrastructure including: a.site preparation and civil earthworks; b.roadworks including new access and intersection works on coleman road c.pavement treatments for new roads and carpark as well as heavy duty concrete and gravel hardstands; d.piped stormwater drainage network; including water treatment structures and detention basins; e.potable water supply and metering including connection to on-site fire water tanks and pumpset; f.trunk feed into fire tie-in pipes for building internal sprinklers and fire hydrants; g.gravity sewer drainage, on-site submersible sewage pump station, and sewer rising main; h.piped gas supply and metering including connection; fencing, gating and security of traffic access control measures; low voltage electrical cabling complete with associated pits and conduits to external facilities and area lighting .the access road off symes road and earthworks pad and gravel hardstand for a sapn hv substation switchyard, fencing and connection of high voltage electrical works from the facility to the sapn switchyard; fibre optic cabling complete with associated pits and conduits; and sa water off-site infrastructure works, including sa water submersible sewage pump station, rising main and network connection, to be performed by a hydraulics subcontractor that is accredited by sa water. the potential design by the contractor of limited aspects of the works such as post-tensioned concrete slabs, and selection of transformers, ups devices, pumps and valves.