Latest and live tenders published in all country. Click on any tender to view further details.
testing and caliration of sf6 gas filling machine. dilo 87727 # aenhausen type: 120r21 caliration and certification should e traceal e and valid for 1 year.
testing and caliration of sf6 gas filling machine. dilo 87727 # aenhausen type: 143r01. caliration and certification should e tracea le and valid for 1 year.
uv gel coating of grp pipeline at k station phase 1 lending plant. systems included distillate system limestone recharging syst em sea water system chemical / naocl system actual area / volume of jo shall e assessed through site visit. procedure grp products, which are exposed outside for a long period, would ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat which is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the line completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grind er, remove the top coat, which is faded. clean the grinding dust and ensure that no patches of old surface exists. also, note
supply of channel; ms; 50x25x; 6; mtr
uv gel coating of grp pipeline at k station desal 44 systems included vacuum system sea water / rine system acid cleaning system distillate system actual area / volume of jo shall e assessed through site visit. procedure grp products, which are exposed outsi de for a long period, would ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat w hich is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the l ine completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grinder, remove the top coat, which is faded. clean the grinding dust and ensure that no patches of old surface exists. also, note that inside hand - lay-up
refurishment of sea water system grp pipes/fittings/spools: procedure grp products, which are exposed outside for a long period, wo uld ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat which is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the line completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grinder, remove the top coat, which is faded. clean th e grinding dust and ensure that no patches of old surface exists. also, note that inside hand - lay-up lamination might have faded. this surface also need to e removed and re - coated. do not grind inside pipe liner. site working conditions site
refurishment of k-station desal 43 grp pipes/fittings/spools for the following systems: #- vacuum system. #- sea water system. #- di stillate system. #- acid cleaning system. procedure: grp products, which are exposed outside for a long period, would ecome dirty a nd outer surface might have faded. to make these products as fresh material, the top coat which is faded, should e removed and re-co ated with polyester resin. cleaning and removal of top coat: after de pressuring the line completely clean the dirty outer surfac e using cloth or compressed air. then using the emery disc grinder, remove the top coat, which is faded. clean the grinding dust and ensure that no patches of old surface exists. also, note that inside hand - lay-up lamination might have faded. this surface
supply of cover sealing with pin for guillotine damper top cover of hrsg, nem document numer cne/122/04/--04-g-m-05002, nem oiler serial no 2 1002-01/02/03/04, l station phase ii jeel ali power plant
supply of chain lock;5 ton capacity test certificate
chain lock, hook suspension manually operated chain lock, capacity-1ton, h.o.l-4mtr, load chain 6mm dia with test certificate