Latest and live tenders published in all country. Click on any tender to view further details.

5861 Middle East Countries Tenders
GTN :14091667
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

technical and general specification of outsourcing work m station, jeel ali power station. name of the work: refilling / pressuriz ation / hydrotest / valve inspection & overhaul of fm200 cylinder & valve make: kidde at m stn, dewa, jeel ali; no. of cylinders - 302 kg fm200 fill # 1 nos. scope of work: 1#get ptw permit to work and lc line clearance documents from dewa. 2#sumit the ris k assessment form and method statement, to get a ptw, contractor has to sumit relevant risk assessment & tool ox talk form and metho d statement. 3#disconnect the cylinder with all the safety procedure & arrange for temporary alternative arrangement for activatio n of fm200 in engineering room. 4#transport the cylinder from the plant to your workshop for refilling fm200 302kg and n2 pressu rization up to the required pressure. 5#perform the leak test on the cylinder, if there is leak, contractor to e rectified. 6#valv e servicing & leakage testing to e done. 7#return the cylinder within 7 days with all safety procedure after refilling fm200 and n2 pressurization. 8#work procedures and transportation to e done as per civil defense and duai municipality rules and regulations. 9 #normalize the temporary arrangement made during removal and test the system in front of dewa representative. 10#work to e done y oem/representative. 11#sumit test certificate for the cylinder, valid for 5 years. 12#warranty of 1 year. 13#party required to vi sit site efore quotation. for contact mr. ahmed 04 8161633 or ahmed.auserriya@dewa.gov.ae / mr. vinu 04 8161598 or vinu.thottappill y@dewa.gov.ae, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu.meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa willsupply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note -tank will e given one y one after completion first one for site visit contact persons: mr. arad moile: 0504611635

5862 Middle East Countries Tenders
GTN :14091720
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

supply of fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn.contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assistfor entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completion first one for site visit contact persons:mr. arad moile: 0504611635

5863 Middle East Countries Tenders
GTN :14091728
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

rewinding and servicing of aux transformer cooling fan motor 0.25kw. motor name plate: make: toshia, type: ik, ratting: 0.25kw, vol tage: 380, current: 1.1, f: 50 hz, rpm: 710, poles: 8, rating: s1, ins.cl: f 1 rewind the motor. 2 replace de/nde earings. 3 mot or painting. 4 warranty shall e 6 months start from delivery date. 5 pick and drop the motor from japs l1 station dewa. for more detail contact mr. manikandan/mudassar 048024555, 0562721022.

5864 Middle East Countries Tenders
GTN :14091862
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

g station fuel tank trench cleaning work. oily water and sludge cleaning work location: g-station 1 main trench: 1.8 m x 75 m x 1.5 m oily water to e removed: 1.8 m x 75 m x 0.20 m 2 trench: 1.8 m x 9.0 m x 1.5 m oily water to e removed: 1.8 m x 9.0 m x 0.20 m 3 pumping station near la 1.5 m x 1.5 x 2.0 m. oily water to e removed 1.5 m x 1.5 x 1.0 m. contractor scope: e fore quote, do site visit and understand scope of work and take measurement for oily water. 1#transfer of usale oil from drain oil collecting tank/ interceptor to the heavy fuel oil tank. 2 pump out the waste oily & water mixture from the pits to the oil tan ker y using pneumatic transfer pump to hazardous waste container 3 degassing of drain oil collecting tank/interceptor 4 otain m an entry permit from third party. 5 removal of sludge from the pits 6contractor shall have valid permit form duai municipality to dispose of the waste oily water 7 contractor shall arrange all the required equipment like compressor; pneumatic pumps, hose, chemicals for desludging, cleaning and transferring oil and the waste. 8 the contractor shall sumit the method statement and risk assessment along with the work permit request dewa scope 1 dewa will supply water free of cost 2 dewa engineer i n charge will assist for entry permit to work etc. general terms and conditions: 1 the contractor should apply for work to permit in advance efore commencing the work. 2 along with the work to permit, the contractor should sumit the method statement, time and work schedule ar chart y indicating each activity & risk assessment. 3 entry pass for the workmen should e applied with visa, passp ort and laor card copies, for each in advance. persons whose names are not availale in the list will not e permitted inside the powe rhouse. 4 entry pass for the vehicle should e applied with copies of registration and for drivers with copies of their driving lice nse. 5 no ojection certificate from the su-contractor should e provided if the contractor hiring manpower. 6 the contractor includ ing group or personal insurance should provide all the safety gear for the manpower. 7 toolox talks should e given y the contractor efore the start of ever days# work y supervisor and the copy should e sumitted to dewa staff. 8 hot work permit should e applied i n advance if required in daily asis. 9 hot permit should e approved y the concerned dewa staff and should ensure the availaility of fire extinguishers efore the start of work. site contact person: arad a moile no: 0504611635 / 0408044632 e mail id: hausahea@dew a.gov.ae

5865 Middle East Countries Tenders
GTN :14091917
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

technical and general specification of outsourcing work m station, jeel ali power station title: insitu seat ring replacement of hr sg32 start up vent control valve; size: 12 in, make: cci qty: 01 no. duration: 04 days. a.#scope of work ·#moilize men/equipment within 02 days of advance notice. ·#get ptw permit to work and lc line clearance document from dewa. ·#the following documents to e sumitted to get ptw, o#method statement. o#risk assessment of the work. o#tool ox talk report. ·#ensure area is correctly secur ed and safe to work in all aspects. ·#conduct site survey and safety inspection to assess the working environment. ·#if the working environment safe, then proceed with the following steps. ·#mark the parts orientation efore dismantling. ·#decouple and remove the a ctuator. ·#disassemle the valve internals. ·#install inline oring machine and cut seat seal weld and pull out existing seat. ·#grind and clean the welded area to insert new seat. ·#install new seat ring & prepare for welding. ·#preheat the seat / ody welding area. heating arrangement & technician will e provided y dewa ·#weld the seat on the ody as per applicale wps y oem. welder will e pro vided y dewa ·#check / lue match the seat ring & plug contact area. ·#carry out lapping if required. ·#re assemly the valve, mount actuator, calirate and stroke test. ·#dewa engineer shall e consulted in case of any indication of damages. ·#replacement of spares shall e decided during the joint inspection. ·#all olts & nuts to e cleaned and luricated. ·#the flange olts are to etorque tighten ed. ·#hot tightening of the olts to e done after start up. ·#final inspection shall e done y dewa personnel. ·#cci service specialis t/engineer to e assigned for the jo. ·#02-03 skilled helpers will e assigned y dewa to carry out the jo. ·#cci service specialist/en gineer has to work complete the jo within the target time. ·#de-moilize men and equipment after completion of the jo. ·#inspection & maintenance report to e sumitted to dewa. inspection report with photos to e provided. ·#seat cutting machine and related tools is in contractors scope. ·#proper and tested tools to e used. ·#all lifting & power tools should e with valid test certificate. ·#the contractor shall visit the site and e fully familiar with the work scope efore sumitting the id. ·#dewa scope: o#spares# o#welder with welding machine o#scaffolding erection at site o#02-03 skilled helpers. .#warranty ·#the warranty period for the work shall e on e year from the date of completion of work certified y dewa. ·#in case of any damage/defect of the work carried out under this contr act within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect within s hort period without affecting the production of electricity and water. c.#general terms & conditions ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., efore he sumit his id. ·#the contractor shall ensure housekeeping on a daily asis and the contractor shall e responsile for allwaste materi al disposals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while working in a hazardous area. · #scaffolding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigging and transporting equipm ent should e arranged y the contractor. these equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#the work shall e executed under dewa sup ervision and as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site throughout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle re gistration. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department clearances to carry out the s cope of work under this contract. ·#the contractor upon receiving the work permit shall first ensure a safe working condition. ·#all the persons should wear all the required ppe while at work. ·#all material and tools rought in shall e declared at power station se curity gate and the list of these items shall e signed y dewa security. the copies of these documents shall e lodged with dewa engin eer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. · #service air, electricity and water for work at dewa site. it is the responsiility of the contractor to have his own arrangement in extending the electricity and water utility to his places of work including lighting. contact person rafael 0524537031/arvind 05539 05432

5866 Middle East Countries Tenders
GTN :14091903
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

technical and general specification of outsourcing work m station, jeel ali power station title: refurishment of gearox of hrsg lp steam miv utterfly valve size: 38 in. gearox manufacturer: samo. ind.co.ltd duration: 04 days a.#scope of work: ·#collect & tr ansport the gearox from dewa m station, jeel ali within a day of notice. ·#dismantle the gearox and inspect all components. ·#clean all components. ·#all defects to e rought to the notice of dewa. ·#all damaged parts like gears, earings, housing etc. to e replaced . ·#reassemle the gearox. ·#paint the gearox efore packing. ·#deliver and install the gearox at dewa m station. ·#final inspection f rom dewa personnel. ·#inspection/repair/ndt report with photos to e sumitted. material certificates to e sumitted in the report ·#the contractor shall visit the site to check the gearox and e fully familiar with the work scope efore sumitting the id. .#warranty ·#the warranty period for the work shall e one year from the date of completion of work certified y dewa. ·#in case of any damage/de fect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessar y repair work and rectify the defect within short period without affecting the production of electricity and water. c.#general term s & conditions ·#all transporting equipment should e arranged y the contractor. these equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should eprovided. · #entry permits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle reg istration. contact person rafael 0524537031/ 048161622 / arvind 0553905432 / 048161612, technical and general specification of outsourcing work m station, jael ali power station title: gearoxes farication for ng all va lves size 8x6 class 150 - 2 no. scope of work ø collect & transport the gearox as sample for gearox farication from dewa m stat ion, jeel ali within a day of notice communication of outage. ø disassemle sample gearox and remove parts inside the casing. ø tak e gearox casing and parts measurements for casting, machining and farication ø re-assemle sample gearox and return to dewa within 1 day after collection. ø casting, machining and farication of gearox as per sample. ø ndt for cracks checking for gearox. ø paint ing of gearox efore packing. ø packing the gearox and deliver at dewa m station. ø sumitting full farication report including mate rial certificates to dewa representative. ·#the contractor shall visit the site to check the gearox and e fully familiar with the w ork scope efore sumitting the id. ø warranty for one year. ø the party should complete the jo within 5 days. .#warranty ·#the w arranty period for the work shall e one year from the date of completion of work certified y dewa. ·#in case of any damage/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repai r work and rectify the defect within short period without affecting the production of electricity and water. c.#general terms & con ditions ·#all transporting equipment should e arranged y the contractor. these equipment should e duly tested and certified y the 3 rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registrati on,

5867 Middle East Countries Tenders
GTN :14091929
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

technical specification this enquiry is to supply and faricate gi frame supports for fixing of new lcd tv at l1 station ccr uilding . s##stn.#jo description#quantity of lcd frame supports # 1#l1 # ccr uilding #supply and faricate gi frame supports for fixing of n ew lcd tv#03# scope of work. 1.#removal of existing lcd tv and frames supports. 2.#supply and farication of new tv frame supports, materials shall e use 40x20x3 mm gi channel and 85x30x3 mm angle. 3.#complete frame painting 1st coat prime and final lack mat colo r. complete materials, consumales, for supply and faricate gi frame supports for fixing of new lcd tv shall e arranged y contractor . general condition ü#complete resources including manpower, materials, tools, tackles, etc. required shall e arranged ycontractor . ü#safety of the persons is the responsiility of successful contractor and should strictly follow dewa safety and environment regu lations. ü#the contractor shall have adequate and proven experience in the field. ü#contractor required to sumit risk and method s tatement prior to start the jo. ü#jo carry out shall have warranty for period of one year from date of jo completion. ü#loose dust, scrap waste, and other miscellaneous wastes generated during the execution work should e cleaned / cleared and disposed off on da ily asis, the work area should kept clean at close of each day. ü#the contractor shall visit the site and make himself fully famili ar with the work scope, plant access, facilities, complexities, etc., efore he sumithis offer. dewa will not accept any claim for extras eyond the order rates / prices during and after the execution of work ordered. ü#site visit can e made on any working day fro m sunday through thursday, etween 07:30 and 14:30 hrs. with prior appointment. contact person mr. dayanandan. 04 816 1603 / 050 598 6074.

5868 Middle East Countries Tenders
GTN :14092027
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

m-station desal required farication and supply of dn400 grp flanges for replacing the damaged flanges of lime stone filters in lendin g plant. work scope. 1 supply of dn 400 grp flanges. 2 removal existing damaged grp flange 3 farication & site installation of grp flange 4 field joint & lamination of newly installed grp flange. pressure rating pn 16 stiffness: 10000 n/m2 qty: 4 nos. no te: warranty to e provided for more details vinish.sanath@dewa.gov.ae / 048161608 senthilkumar.t@dewa.gov.ae / 048161629 4

5869 Middle East Countries Tenders
GTN :14092050
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  03 Sep, 2018

project description for repair and lamination of grp firefighting pipe underground size dn250 at e-station near chemical store sco pe of work: 1#repairing or replacing partially grp pipe of existing size-dn250 2#consumales, equipment and tools required for the jo shall e arranged y the contractor 3#risk assessment covering complete activities shall e display on site 4#responsile supervis or from the contractor shall conduct tool ox talk to their staff. note-dewa will provide water and electric supply required for the jo will e arranged y dewa.

5870 Middle East Countries Tenders
GTN :14092061
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  03 Sep, 2018

refurishment and repairing of c analyzer make: programma, model : tm1600. for execute please contact mr. ashif 04-3229804,

Get Bahrain Tenders, Cyprus Tenders, Egypt Tenders, Iran Tenders, Iraq Tenders, Israel Tenders, Jordan Tenders, Kuwait Tenders, Lebanon Tenders, Oman Tenders, Qatar Tenders, Saudi Arabia Tenders, Somalia Tenders, Syria Tenders, Turkey Tenders, United Arab Emirates Tenders, Yemen Tenders Tender Alert...

212022