Latest and live tenders published in united arab emirates. Click on any tender to view further details.
additional support for vent condenser inlet-line near group condenser suction point dn 400 with saddle clamp support should e with h-eam, saddle clamp with hot dip galvanized 1nos each unit from desal 61 to 65
repairing, replacement, test, commissioning, existing defective equipment, supply, installation, test, commissioning of dosing pumps two lph 5 ar, supply, installation, test, commissioning of mmf for gwtp required media to fill existing 36x72 filter, internal distriution arr angement, supply, installation, test, commissioning of acf for gwtp required media to fill existing 36x72 filter, internal distriution arr angement, supply, installation, test, commissioning of mmf for stp required media to fill existing 36x72 filter, internal distriution arra ngement, supply, installation, test, commissioning of acf for stp required media to fill existing 36x72 filter, internal distriution arra ngement, supply, installation, test, commissioning of pipes for stp filters frontal piping arrangement, supply, installation, test, commissioning of required interconnecting pipes, fitting and valves pvc and upvc, supply, installation, test, commissioning of gi cale tray 450mm x 50mm x 1.5mm x3ml
supply of universal cale stripper for large difficult cale insulation ø >45mm ref.no. av6240 ams maxi, rand - inter cale. or equivalent
supply of universal cale stripper for primary insulation ø 15- 52mm ref.no. 17230 ims ii, rand - inter cale. or equivalent
supply of stainless steel heavy-duty open/close type shoe rack 3/4 compartments open type sixe 90h*60w*40d sample picture attached
m-station desal required refurishment of dn #250 utterfly control valve - shock dosing control valve. qty: 1 no. work scope 1 collection & delivery of material from m-station desal 2 repairing / refurishment of valve. including painting of valve 3 hydro test to e done. 4 warranty for the jo to e provided for more details vinish.sanath@dewa.gov.ae / 048161608 senthilkumar.t@dewa.g ov.ae / 048161629
scope of work for tank 3e ff line replacement 1.0#scope of work 1.#supply & installation of firefighting gi seamless pipes & fit tings for the fuel oil day tank 2.#removal of existing damaged pipes and fitting from the tank 3e 3.#removal of old pipe & fittings, installation, coating and testing of gi seamless pipes, fittings and nozzles for water spray cooling system and foam suppression sy stem # firefighting system 4.#pressure testing, painting, supports if required for the installed system 5.#attery limit is from the tanks top nozzles until the existing isolation/deluge valve connection piping. 6.#supply of men, machine, tools, equipment and consu males 7.#includes moilization, demoilization, transport, food and accommodation 8.#take field measurements prior topreparation of f arication where possile, to ensure proper fitting of the work. 9.#prior to start of work, carefully inspect the other neary installa tions to prevent damages. 10.#preassemle items in the farication yard to the greatest extent possile 11.#touchup lemished or unprote cted surfaces with primer. 12.#proper storage of materials to ensure protection against damage. 13.#immediately after erection, clea n field weld joints and olted connections. 14.#in the event of discrepancies, immediately notify dewa engineer. 15.#do not proceed w ith farication or installation in areas of discrepancies until all such discrepancies have een fully resolved. 16.#work force handli ng; work supervision, safety of the plant and staff. 17.#after completion of work
sumersile pump with electrically operated with single phase head of flow 25m, with all required accessories. a delivery pipe of 5 0lm with camlock coupling need to include.make: any european
supply of reallusion | all-in-one full-ody mocap animation solution
supply of reallusion |3d videocompositing