Latest and live tenders published in united arab emirates. Click on any tender to view further details.
1. the duration of this contract will e for two 02 years, startseptemer 2019 till july 2021, from actual commencement date and ag reedterms, conditions & payment shall e valid firm and inding on him forentire duration of contract.2. contractor has to quote pric e for trip per day per us as and whenrequired, and contractor has to quote for per extra hour if tripexceeding 8 hours. trip timing will e from 6:00am to 6:00pm any 8hours.3. payment to contractor shall e made on monthly asis for numer oftrips made in a month w ith authorized signature from dewa end userevidence.4. dewa representative shall inform contractor for arrangement ofus/trip one day in advance as and when required and contractor has toensure timely provision of us according to requirement of dewaacademy.5. to ensure timely pick & drop of students, a #format# shall emaintained in each us and date & timings of pick & drop shall erecorded in same, and to e signed y designated staff of dewa.6. in case of failure to comply with timings, dewa shall have right todeduct 50 % of trip amount from monthly invoice of contractor.7. the quoted prices shall e deemed to e all driver, fuel, salik, parking fees, vat etc. inclusive.8. the contractor shall provide same year models or one year old modeluses only. vehicles must e clean, tidy and roadworthy for duration ofcontract.9. ensuring full insurance coverage for vehicle, all passengers anddriver.10. the drivers s hall not indulge in any sort of argument with studentsut shall report matter/dispute, if any, to dewa academy#sconcernedauthorities .11. in case of any reakdown to vehicle/us, immediate roadsideassistance will e provided y contractor.12. dewa academy shall have the right to terminate contract if thecontractor fails to rectify any failure or reach of its contractualoligations even after issue of two consecutive warnings from dewaacademy.13. this contract shall e construed and in all respects e governed ylaws and regulati ons of emirate of duai, and to extent that the sameare applicale therein, laws and regulations of united ara emiratesand shall e s uject to jurisdiction of courts in duai.14. strict compliance of rta rules & regulations meant for studenttransportation. in case o f any amiguities/lapses in this regard, contractor shall e fullyresponsile without causing any inconvenienceor cost whatsoever to de wa academy.15. all vehicle/us must have cctv camera installed and they will e inproper working condition.16. all vehicle/us must h ave gps # tracking route system installed anddewa representative will have privilege as well as authority to monitoreach vehicle/us location, at all times.
conservation award armani hotel /on 2rd may 2019 event capture & edit: -#photographer -#videographer with equipment -#crane equipm ent and live feed -#video edit post event - 90 secs upto 2 versions sounds, lights & av: -#sound system powered speakers # qsc k1 0 8 rcf powered su yamaha ls 9 digital mixer 1 podium mic # mx 418 dc 18# 2 shure ulxd lighting system fresnel 2k clay paky spot mh 700 clay paky sharpy on floor led pro wash 360 mh led city color pre function sound & light truss # goal post & t columns -#led p ixel indoor -#proccessor & connectors -#analogway # ascender -#automation for led screens for more information please contact mrs, r eem alsat reem.alsat@dewa.gov or mahra.amiri@dewa.gov.ae thank you
complete overhauling of ooster pump for jeel ali haa dp pump. pump details: makedrakos polemis, model: asn-ev250-510 capacity: 9 50 m3/hr head: 60m rpm: 1450 please contact mr. noor uddin 052-9172523 for further clarification. technical specif ications 1.0#introduction duai electricity & water authority dewa owns and operates potale water ooster pumping stations at vari ous locations of duai. these ooster pumping stations along with their accessories are maintained regularly and taken out of service in a planned sequence mostly in winter to carry out the preventive maintenance, inspections & overhauling etc. 2.0#scope of work t he scope of work mandatory & optional for the overhaul of ooster pumps and their accessories of ooster pumping station. a#the contractor has to take the pump assemly from dewa site to their workshop & vice versa. dewa shall not provide any transport to shift t he same. for loading & unloading contractor can use dewa overhead crane availale at pumping stations in coordination with the dewa representatives. #mechanical seal replacement, coupling ush renewal & gland packing renewal, earing replacement as required. c#ove rhauling of pump see annexure i-mandatory & ii-optional d#painting of pump externally e#rectification of the pump for any compla int rose after installation. f#if any part is found defective, the contractor has to repair/replace the same. availale spare shall e supplied y dewa. if any spare is not availale with dewa the contractor has to arrange the same. additional cost of spareto e sumi tted to dewa for approval efore placing the order. 3.0#prior to sumission of quotation, the following shall e determined carefully: a#the contractor shall visit the site and make himself fully familiar with the work scope, plant access facilities, complexities, etc., efore sumitting the quotation. #dewa will not accept any claim for extras eyond the order rates / prices during and after t he execution of work ordered. c#the contractor will e provided with the equipment shutdown program in coordination with operation & maintenance department of water division. d# the contractor should sumit the time schedule /ar chart indicating each activity. e#on completion of the work, the inspection checklist of qualityprocedures, wherever applicale should e filled in and sumitted. f #site supervision, co-ordination of field activities, supply of required technicians, tools, equipments, tackles etc. required for execution of the contract works shall e suitaly considered. 4.0#take over on completion of all work within the scope of the contra ct, for acceptance of the maintenance work, contractor shall notify dewa in writing. a certificate of completion will e issued y dew a on final inspection only when the contract work is deemed to have een taken over y dewa after necessary condition monitoring check s wherever & whenever required. 5.0#warranty a#all the work carried out shall carry a warranty for 8000 hours of operation or 1 y ear whichever is earlier. #the guaranteewill take effect from the date of takeover y dewa of the jo carried out y the contractor. c#when a defect is noticed during the period of warranty, the contractor must rectify the defect within a reasonale amount of tim e fixed y dewa with no claim or compensation. 6.0#documents: # on satisfactory completion of the work & handing over, the contract or should sumit the following to dewa. ## a#inspection report. #overhaul report. c#jo completion repor t for jos other than routine inspection & overhauls d##as-fitted# ill of materials for consumption of spares e#requisition for p lanning of spares y dewa ased on current condition of the equipment for which maintenance work was taken up. annexure # i detail sc ope of work mandatory for overhaul theooster pump of pumping station sl.no#activity#remarks# 01#dismantling of the pump#dismant ling of the pump as per dewa engineer#s instruction# ##pump shall e removed as per sequence with skilled workmanship & care.# 02#o verhauling of pump#the contractor shall dismantle the complete rotating assemly at their workshop and record all findings in a track sheet with photographs of deteriorated components.# ##the contractor has to check for shaft straightness and identify worn-out area s if any. reconditioning of the shaft shall e carried out in compliance with the latest standards & procedures.# ##the contractor ha s to check the impeller thoroughly for any reconditioning required. # ##earing condition to e checked & replace the earings if required. # ##mechanical seal / gland sleeve condition to e checked & to e replaced if required.# ##wear rings dimensions to e checked fo r clearance & to e replaced if required.# ##if any part is found defective, the contractor has to repair/replace the same. availale spare shall e supplied y dewa. if any spare is not availale with dewa the contractor has to arrange the same. additional cost of spa re to e sumitted to dewa for approval efore placing the order.# ##pump casing shall e cleaned & inspected for any damages. if requir ed damage surface to e required y sandlasting & coating with food grade epoxy.# 03#assemly of the equipment#assemly of the equipment to e carried out as per standard procedure & maintain the fit & clearance as per manual. # ##dynamically alance therotor assemly a s per iso1940/1 alance quality grade g 2.5/g1.0 wherever possile or check the alancing of the individual items.# ##prepare the recor d for the activities carried out.# ##deviation to the set #values# shall e decided y dewa. # annexure # ii detail scope for machinin g works optional sl.no#activity#remarks# 01#impeller machining works#impeller grit lasting & ndt to find out any cracks exist# ## impeller skimming on oth sides of wear ring areas & fix new ring and secure# 02#shaft machining works#shaft chrome plating on earing seating areas & machining# ##shaft chrome plating on mechanical seal seating areas & machining# ##shaft worn out place metal reuild ing & machining# ##shaft end straightening up to 4thou maximum end# 03#earinghousing machining works#de earing housing ore machin ing & resleeving # ##nde earing housing ore machining & resleeving # 04#mechanical seal face#machining and repairing of pump top and ottom casings halves on mechanical seal face# 05#pump casings#skimming and grooving of oth suction and discharge flanges on pump ca sing# 06#consumale accessories & fittings#manufacturing of mechanical seal cooling pipe-fittings, shaft lock nut, lock washer and re taining ring, dowell pins, earing spacer, holding down olts and earing housing gaskets etc. supply of all types of o-rings.# 7.0#ma chining works: all the machining works shall e carried out in compliance with the latest standards & procedures. prior approval shal l e taken from dewa engineer, eforecarrying out any kind of machining works
complete overhauling of ooster pump for haa ph-i, pump. pump details: make-aversa, model-nds-v-300-250-460. please contact mr. noor uddin 052-9172523 technical specifications 1.0#introduction duai electricity & water authority dewa owns and operates potale water ooster pumping stations at various locations of duai. these ooster pumping stations along with their accessories are maintaine d regularly and taken out of service in a planned sequence mostly in winter to carry out the preventive maintenance, inspections & o verhauling etc. 2.0#scope of work the scope of work mandatory & optional for the overhaul of ooster pumps and their accessories of ooster pumping station. a#the contractor has to take the pump assemly from dewa site to their workshop & vice
complete overhauling of ooster pump for najma pumping station ph-i. pump details: make-goulds, model-3410, size-12*14-15, capacity-1 136.5 m3/hr. rpm-1500. please contact mr. noor uddin 052-9172523 for further clarifications. technical specifications 1.0#introdu ction duai electricity & water authority dewa owns and operates potale water ooster pumping stations at various locations of duai . these ooster pumping stations along with their accessories are maintained regularly and taken out of service in a planned sequence mostly in winter to carry out the preventive maintenance, inspections & overhauling etc. 2.0#scope of work the scope of work man datory & optional for the overhaul of ooster pumps and their accessories of ooster pumping station
internal & external coating of ooster pump casing for nad al shea ps. pump details: mfr: clyde weir pump, flow rate: 526 l/sec; haed : 66 m; type: sdk 400/600; rev/min: 980 rpm. please contact mr. noor 052-91725232 for further clarifications specification for i nternal coating of pumps/ valves general these pumps & valves are used in water ooster pumping stations. the fluid handled y these pumps is potale water of maximum temperature up to 50 0c. normally the water is clean ut some time it is noticed to have sand and solids in stream from pipeline. these pumps are in operation since commissioning of the station. scope of work collection & t ransportation the contractor shall collect the pump casing through suitale pickup/crane mounted truck from ems workshop at aweer
testing of 3 nos 15000/1 amps cts of gtg # 72, generator circuit reaker.
caliration of dvrs trimle 5800contact waheed janju tel: 04-398-7106/0558762809
external tank filtration system for ge fr9e machine # idder should ring the external lue oil filtration skid, which can clean the f rame 9e tank of capacity 15000 liter of ep2 oil regal premium gst ep32. # external filtration skid should e equipped with online p article counter /online nas value measurement device. # acceptance criterial is nas 7 value for ge frame 9e gas turine. # external f iltration skid should e equipped with all size of consumale filters from 40 microns to 5 microns filter to reach the desired nas val ue for oil. # filter should e under idder scope. # the connecting point of skid should e at least 11/2 inch or aove for high flow tr ansfer to skid which will reduce the flushing time terms and condition # complete resources including manpower,
supply of caliration of dvrs sokia