Latest and live tenders published in united arab emirates. Click on any tender to view further details.
removal and re fixing of insulation and liner plate of whr hotspot rectification work # k station japs. period of work 04 days during unit shut down scope of work ·#moilize the laor, equipment, tools, etc. on 24 hrs. notice period ·#remove the liner plate i n the designated areas. ·#rethread the plate-fixing stud m12. ·#remove the existing insulation and clean the casing surface. ·#int imate dewa personnel in case of any anormalities / damages found in the oiler casing plate. ·#install the new insulation lankets. ·# contractor shall rectify any anormalities / deformation found in the liner plate. ·#in case of complete damage of the liner plate, d ewa will supply new liner plate and contractor shall faricate and fix the plate according to site conditions. ·#fixthe liner plate and ensure that flue gas will not enter to oiler casing. ·#fix the nut and washers ack and tack weld the nuts with stud. ·#housekeep the area and dispose scrap insulation as per dewa instruction. ·#jo completion acceptance is sujected to dewa personnel inspection and verification. ·#sumit work completion report with clear photos. dewa scope 1.#scaffolding 2.#electricity 3.#water 4.#insulatio n 5.#liner plate 4ft x 8ft 6.#m12 stud & nut additional requirements from contractor ·#after work completion, dewa will do the th ermographic inspection. contractor shall rectify any further hotspots oserved in the same area. ·#the contractor shall rectify any a normalities / damages of oiler casing due to hotspot oserved in a period of one yearfrom the date of jo completion. warranty ·#the minimum warranty period for the work shall e of one year from the date of completion of work accepted y dewa. ·#in case of any damag e/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the nece ssary repair work and rectify the defect within short period without affecting the production of electricity and water. general ter ms & conditions ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensurehousekeeping on a daily asis and the contractor shall e responsile for all waste material dispo sals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e followed at work site during the exe cution of the work. the contractor#s engineer should e familiar with safety regulations while working in a hazardous area. ·#scaffol ding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigging and transporting equipment shou ld e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certific ates should e produced on demand. qualified rigger, mechanics should e provided. ·#the work shall e executed under dewa supervisionand as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site throughout the period of work. ·#entry p ermits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the l ist, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registratio n. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department clearances to carry out the scope of w ork under this contract. ·#the contractor upon receiving the work permit shall first ensure a safe working condition. ·#all the pers ons should wear all the required ppe while at work. ·#all material and tools rought in shall e declared at powerstation security ga te and the list of these items shall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-ch arge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to have his own arrangement in extendin g the electricity and water utility to his places of work including lighting.
supply of valve, gate valve-class-1500, size-2-w ends, valve type-2-731xe, dwg no-p99211h/02, kks no-d1/d2/d3 had50aa406, make-intervalve, valve, gloe valve-class-1500, size-2-w ends, valve type-2-v714, dwg no-p99211h/308, kks no-51/52/53had50aa152, make-intervalve, valve -gate valve - size: 2 class:2500, connections: utt weld ends, schedule:160, type: 2-lv-w813c p/n:p99211h/205, valve -gate valve - size: 2 class:800, connections: utt weld ends, schedule:80, type: 2-lv-u713 p/n:p99211h/201, valve -piston check valve 2 class:150, connections: flanged ends rf150, type: 2-lv-p750 p/n:p99211h/219, valve -are stem gloe valve - size: 2 class:2500, connections: utt weld ends, schedule:160, type: 2-z811ce p/n:p99211h/306, valve -are stem gloe valve - size: 2 class:1500, connections: utt weld ends, schedule:80, type: 2-v711xe p/n:p99211h/310, valve -regulating gloe valve - size: 1class:2500 sp.ci, connections: utt weld ends, schedule:80, type: 1-z811ce p/n:p99211h/311, valve, gloe valve welded onnet, size 1, s/w end, class 1500, ody material c.s. a105, make: ks/jc middle east, for oiler high pressu re steam drain and vent system, valve, gloe valve welded onnet, size 1, s/w end, class 2500, ody material alloy steel a182 f22, make: ks/jc middle east, for oiler high pressure steam drain and vent system.
supply of bitumen ;cold applied flexile bitumen coating protection and waterproofing. this comes in 4gallon cans & 200lit. drums. its availal e in the market in different names like flexcoat, teakcoat etc.
supply of copper cale; hp lc sfp+ 10ge 0.5m, make hp, p/n 487649-21
supply of tp ethernet patch cale; 6du1164-0ts62-0aa3; ; standard 1:1; 42; cat. 6; halogenfree; patch cale 3m - 2 x rj45 hirose tm21 plug sh ielded; make: siemens
supply of element, strainer, ss 304 perforated sheet # 4 mm hole dia. x 1.6 mm thick, ss 304 wire mesh # 30 mesh; 500 microns; inside, for y-t ype 8 inch strainer assemly, procedyne.
supply of unit; control main, with actuator unit, make : iffi, model no: wgr#1600dw-010r/16000-155, for cw/049/04, unit; control main, with actuator unit, make : iffi, model no: wgr#200dw-010r/2000-65, for cw/049/04
supply of control unit; auma matic for actuators, make- auma, type # ac1.2, com no -13397289, no # 3117ma78352, phase - 3 ph, 400v, i.p -68, c ontrol - profius dp-v2 for mushrif reservoir complex phase-3, actuator with control unit for 300mm valve electric, make- auma, actuator type: sar7.6, actuator com no: 13123230, control unit typ e- ac01.2, control unit com no: 13123230.
supply of encloser;grp, type -for water quality analyzer unit with out instruments, makegrp industries ltd. size-750x750x750. drawing no - grpi en s757575.
supply of eddy current displacement proe make: epro model no.: pr6423/000-000, dual channel shaft viration xmr. make: epro model no.: mms 3110/010-000 .