Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1591 Middle East Countries Tenders
GTN :14107384
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

supply of hydrotesting for toxic gas cylinders, hydrotesting for non-toxic gas cylinders

1592 Middle East Countries Tenders
GTN :14107454
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

testing and caliration of gas chromatograph instrument, make: ech elektrochemie, model: gc2, serial no: 90130380. caliration and cert ification should e traceale and accredited as per iso/iec 17025 specification. caliration certificate to e valid for two year. conta ct mr. haroonrashid kamal tel: 0553088995

1593 Middle East Countries Tenders
GTN :14107471
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

fabrication, supply and installation of silencer with suction filter for auxialiary oiler fda fans in e station phase #i 1.drawing wil l e provided for reference and estimation. 2.site visit & actual measurements to e taken y vendor . 3.material procurement and faric ation of strainer and silencer. 4.silencer with strainer to e sand lasted and painted as elow. where ever possile it should e sand l asted to sa 2-1/2 external surfaces primer coating 50 #, intermediate coating 125 #, final coat 60 #, paint ral 5005 internal surfac es heat resistant aluminum paint. 5.. removal of existing silencer with strainer from the fd fan. 6.fixing of silencer with strainer in the fd fan. 7.gaskets will e provided y dewa. 8.hardware like olts and nuts should e arranged y vendor. 9.scaffolding, moilecra ne, forklift, power, water and compressed air will e arranged y dewa. 10.onsite welding and gas cutting if any required to e arrange d y vendor. contact mr. deivasihamani perumal tel: 04-80-44541

1594 Middle East Countries Tenders
GTN :14107474
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  05 Sep, 2018

supply of seat for dn300 ace utterfly valve. material: epdm food grade, p/n.3, dwg no. j1093, manufacturer: ace valve co., ltd. korea. for l - 2 lending plant, seat for dn80 ace utterfly valve, material: epdm food grade, p.n. 3, dwg no. j1068, manufacturer: ace valve co. ltd. korea. for l- 2 lending plant, seat for dn150 ace utterfly valve, material: epdm food grade, p.n. 3, dwg no. j1084, manufacturer: ace valve co. ltd. korea. for l-2 lending plant

1595 Middle East Countries Tenders
GTN :14107487
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

technical and general specification of outsourcing work m station, jeel ali power station title: dismantling, servicing, overhauling, installation and pressure testing of lock 20 & 30 dfo system plate type heat exchanger. no of phe: 04 nos. duration: 06-08 daysf or more clarification you may contact arvind prakash- +971553905432 a.#scope of work: ·#moilize men/equipment. ·#sumit the followi ng documents and get ptw permit to work and lc line clearance document from dewa. o#method statement o#risk assessment of the wo rk o#tool ox talk report. ·#conduct site survey and safety inspection to assess the working environment. ·#ensure area is correctly secured and safe to work on in all respects. ·#ensure positive line isolation and proper depressurizing of the lineefore start of w ork. ·#if the working environment safe, then proceed with the following steps. ·#dismantle the heat exchanger connections, foundatio n olts and install lind flanges on pipe connections. ·#remove the heat exchanger. dewa will supply crane ·#transport the phe from dewa jeel ali, m station to contractor workshop. ·#dismantle the heat exchanger using special tools. ·#carryout inspection on all pl ates 237 no#s. dewa representative will witness. ·#generate report on existing plate conditions. ·#carry chemical and hydro jet cleaning of all plates 237 no#s. ·#conduct crack detection of individual plates to identify leaks if any using light ray test meth od. excessive corrosion may have caused minute pinholes or cracks that are notvisile to naked eye. ·#if total quantity of damaged p lates are within 10% of installed quantity then it has to e removed / replaced dewa will advise after inspection dewa will supply the plates if required ·#if total quantity of damaged plates are more than 10% then it has to e replaced dewa will supply the pla tes. ·#replace the gaskets dewa will supply the gaskets. ·#carryout service and paint on end frames and accessories. ·#carryout s ervicing of nut & olts and tie rods. ·#assemle the plates according to plate placement pattern. ·#prepare and carry out hydro pressu re test on oth sides of the unit dewa representative will witness. ·#deliver the phe to dewa jeel ali, m station ·#assemle the phe, all accessories & pipe connections ·#sumit report on the activities carried out with all details & photos. ·#sumit the report of performance analysis. ·#handover and demoilize. ·#efore sumitting the id, the contractor shall visit the site and e fully familiar w ith the work scope, plant access, facilities, complexities, safety measures etc. .#warranty ·#the warranty period for the work sha ll e one year from the date of completion of work certified y dewa. ·#in case of any damage/defect of the work carried out under thi s contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect w ithin short period without affecting the production of electricity and water. c.#general terms & conditions ·#the contractor shallensure housekeeping on a daily asis and the contractor shall e responsile for all waste material disposals to designated places. ·# all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contr actor#s engineer should e familiar with safety regulations while working in a hazardous area. ·#scaffolding if required shall e arra nged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigging and transporting equipment should e arranged y the contracto r. these equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on de mand. qualified rigger, mechanics should e provided. ·#the work shall e executed under dewa supervision and as perquality/schedule requirement. ·#contractor#s supervisor shall e availale at site throughout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the list, will not e allowed to e nter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registration. ·#dewa will arrange neces sary ptw / lc / hwp from operation, chemical la / fire department clearances to carry out the scope of work under this contract. ·#t he contractor upon receiving the work permit shall first ensure a safe working condition. ·#all the persons should wear all the requ ired ppe while at work. ·#all material and tools rought in shall e declared at powerstation security gate and the list of these ite ms shall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-charge on daily asis. this doc ument will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water f or work at dewa site. it is the responsiility of the contractor to have his own arrangement in extending the electricity and water utility to his places of work including lighting.

1596 Middle East Countries Tenders
GTN :14107492
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  05 Sep, 2018

supply of hioki humidity logger lr5001, hioki temperature logger lr5011, hioki communication adapter lr5091

1597 Middle East Countries Tenders
GTN :14092027
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  02 Sep, 2018

m-station desal required farication and supply of dn400 grp flanges for replacing the damaged flanges of lime stone filters in lendin g plant. work scope. 1 supply of dn 400 grp flanges. 2 removal existing damaged grp flange 3 farication & site installation of grp flange 4 field joint & lamination of newly installed grp flange. pressure rating pn 16 stiffness: 10000 n/m2 qty: 4 nos. no te: warranty to e provided for more details vinish.sanath@dewa.gov.ae / 048161608 senthilkumar.t@dewa.gov.ae / 048161629 4

1598 Middle East Countries Tenders
GTN :14092050
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  03 Sep, 2018

project description for repair and lamination of grp firefighting pipe underground size dn250 at e-station near chemical store sco pe of work: 1#repairing or replacing partially grp pipe of existing size-dn250 2#consumales, equipment and tools required for the jo shall e arranged y the contractor 3#risk assessment covering complete activities shall e display on site 4#responsile supervis or from the contractor shall conduct tool ox talk to their staff. note-dewa will provide water and electric supply required for the jo will e arranged y dewa.

1599 Middle East Countries Tenders
GTN :14092061
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  03 Sep, 2018

refurishment and repairing of c analyzer make: programma, model : tm1600. for execute please contact mr. ashif 04-3229804,

1600 Middle East Countries Tenders
GTN :14092076
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  03 Sep, 2018

expansion replacement work at e-station in #jeel ali power station technical specification and general terms & conditions title: hr sg#4 pre-heater expansion joint replacement work replacement of faric expansion joints to e done as per existing installed sizes & lengths including all attachments in ph-iii, oiler hrsg-5 at e station as per attached scope of work. existing expansion joints# d etails are as follows. 1. faric expansion joint size-width:260mm;length:5500mm; 2. olster size-width:200mm, length:5000mm, 140mm cer amic wool 3. olt & nut size:m12x60, 100nos. in each joint 4. numer of faric expansion joints to e replaced:14nos. duration: 14days / oiler scope of work: moilize men and equipment. tool ox talk for the work to e conducted and copy to e sumitted prior start of work. risk analysis for work to e carried out and report to e sumitted prior to start of work. method statements to e sumitted prior t o start of work. removal of expansion joint flange connection all the removed olt and nuts shall e cleaned and luricated remove fari c out layer. remove inner olster cleaning of expansion joints ellow connection duct. weld the support holding hook with casing for i nner olster fix the inner olster fix the faric layer and joining y welding heat sealing all the olts nut to e torque tightened. al l the required tools and tackles for the installation shall e rought y supplier dewa will not provide any tools and tackles and manp ower. housekeeping of the site and proper waste disposal as per dewa safety rule. work completion report shall e sumittedwith detai led description and photos. work period # 4 days warranty # one year technical specification and general terms & conditions the c ontractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety m easures etc., efore he sumit his id. the contractor shall sumit the schedule of work the period efore commencement of the work and shall e approved y dewa. dewa anticipates maximum 3 days all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while working in a hazardous area. all tools required for the contract shall e arranged y thecontractor. all rigging and transporting equipment should e arranged y the contractor. these rigging tools should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. contractor#s supervisor shall e availale at site throughout the period of work. the work carried out y the contractor shall carry a warranty for one year and the contractor shall attend any defects come out of ad workman ship etc free of charge within this period. the contractor should apply for the permit to work well in advance and this request sha ll e followed with method statement, risk assessment as attachments. hot work permit should apply on daily asis. entry permits for t he workmen should e applied withpassport copies having valid visa. persons, whose names are not availale in the list will not e all owed to enter the power house. entry permits for the vehicle should e applied with copies of police vehicle registration. all the w orkmen should wear the uniform, safety shoes and helmet while at work. toolox talks should e given to the workmen y their supervisor efore start of work. all material and tools rought in shall e declared at power station security gate and the list of these items s hall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-charge on daily asis. this docum ent will e the asis for the clearance gate pass to take them out on completion of the jo.in #jeel ali power station technical specification and general terms & conditions title: hr sg#4 pre-heater expansion joint replacement work replacement of faric expansion joints to e done as per existing installed sizes & lengths including all attachments in ph-iii, oiler hrsg-5 at e station as per attached scope of work. existing expansion joints# d etails are as follows. 1. faric expansion joint size-width:360mm;length:22000mm; 2. olster size-width:300mm, length:22000mm, 140mm c eramic wool 3. olt & nut size:m16x60, 700nos. 4. numer of faric expansion joints to e replaced:1no. duration: 14days / oiler scope of work: moilize men and equipment. tool ox talk for the work to e conducted and copy to e sumitted prior start of work. risk analy sis for work to e carried out and reportto e sumitted prior to start of work. method statements to e sumitted prior to start of wor k. removal of expansion joint flange connection all the removed olt and nuts shall e cleaned and luricated remove faric out layer. r emove inner olster cleaning of expansion joints ellow connection duct. weld the support holding hook with casing for inner olster fi x the inner olster fix the faric layer and joining y welding heat sealing all the olts nut to e torque tightened. all the required tools and tackles for the installation shall e rought y supplier dewa will not provide any tools and tackles and manpower. housekee ping of the site and proper waste disposal as per dewa safety rule. work completion report shall e sumitted with detailed description and photos. work period # 4 days warranty # one year technical specification and general terms & conditions the contractor shal l visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., efore he sumit his id. the contractor shall sumit the schedule of work the period efore commencement of the work and shall e approv ed y dewa. dewa anticipates maximum 3 days all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while working in a hazardous area. all tools required for the contract shall e arranged y the contractor. all rigging and transporting equipmentshould e arran ged y the contractor. these rigging tools should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. contractor#s supervisor shall e availale at site throughout the period of work. the work carried out y the contractor shall carry a warranty for one year and the contractor shall attend any defects come out of ad workmanship etc free of charge within this period. the contractor should apply for the permit to work well in advance and this request shall e followed with method statement, risk assessment as attachments. hot work permit should apply on daily asis. entry permits for the workmen sho uld e applied with passport copies having valid visa. persons, whose names are notavailale in the list will not e allowed to enter the power house. entry permits for the vehicle should e applied with copies of police vehicle registration. all the workmen should wear the uniform, safety shoes and helmet while at work. toolox talks should e given to the workmen y their supervisor efore start o f work. all material and tools rought in shall e declared at power station security gate and the list of these items shall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo.

Get United Arab Emirates Tender Alert...

036647