Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of drain;smart condensate, 14, voltage - 230v/50-60hz, bekomat 4030243, beko germany. air valve; bekomat solinoid part.no-4027850, beko valve bekomat 13, 13co, 14, 14co m5 230v/50-60hz, beko germa ny.
filter, seal gas element, make-balston, type- 200-35-bx, fuel gas comopressor. for details, contact:1. zamir alware - zamir.alware@d ewa.gov.ae or 0481403042. sumit mehta - sumit.mehta@dewa.gov.ae or 048140306 moisture separator dgs air line, balston uk, model : 2208 b -1b1 - dx, element no : 150 - 19 - dx, what man uk, max. pr essure rating 250 psig at 130 deg f 16 barg at 50 deg c, min 20 deg c, capacity 1.5 lit.
supply of valve; butterfly valve; with gear box; lug type; threded hole; rubber seat; size: 12 inch; dn 300; pn: 16; manufacturer: grinnell or equivalent, for k stn fire water system; k stn. contact person: james kumar / james.kumar@dewa.gov.ae / 04-80-25255 / +97152912651
supply of position limit switch, make: siemens, model: 3se5112-0ca001-1ac1, used in air intake system mext pressure transmitter, make: siemens, type: sitrans p ds iii, moder: 7mf4033-1ea00-2eb7-z, a01+y01+y15+y21+c11+c14, range: 0 to 16bar, with local display, fab.nr. n1fo159000071, vdc 10.5 --- 46vdc, output 4 -- 20 ma, used gt fuel oil system mext pressure transmitter, make: siemens, type: sitrans p ds iii, model: 7mf4033-1ga00-2eb7-z-a01-c11-c14-y01-y15-y21, range: 0 to 160 ba r, with local display, vdc 10.5 --- 46vdc, output 4 -- 20 ma, used gt fuel oil system mext dp transmitter, make: siemens, type: sitrans p ds iii, model: 7mf4433-1ga42-2ab7-z-a01-h03-y01-y15-y21-c11- c14, range: 0 to 5000mbar, with local display, vdc 10.5 --- 46vdc, output 4 -- 20 ma, used gt fuel oil system mext
supply of valve, pressure safety valve complete, size 25 mm, set pressure 24 bar, make : parker herl . model t21f, flanged connection . for am onia service.kks: 74/75/76/77qk06aa191/192.material certificate and valve test certificate to be submitted. valve, pressure safety valve complete, size: 40 mm, model t23v; set pressure: 20 make : parker herl, flanged connection, for a monia service; for suction separator; kks:70qk06/07aa191/192; material certificate and valve test certificate to be provided valve, pressure safety valve complete, size: 1/2 inch / 1 inch; model: t19f; set pressure 20 bar, flanged connection; parker h erl, for ammonia service; kks: 70qk08aa191/192 service kit, for pressure safety valve, 25 mm, set pressure 24 bar, make : parker herl, model t21f, flanged connection,
supply of valve top assemply, c0nsist of:liner, disc, drive shaft, lower shaft, returntion pin, bearing upper, bearing lower, & key, working pr e ssure 175psi, type/model:butterfly valve /series lc-8282 -3fp, with gear operated & position indicator, dn300;tapped lug body styl e, d rilled acc.to ansi b 16.5, 150 lbs., kks no: 50sga80aa617/618, manufacturer : mueller chattanooga, nominimax ref, no1-004943-522, page 6&7 of 25;mmd-k. contact person: james kumar / james.kumar@dewa.gov.ae /
technical specification for supply & installation of sewage tank in m station scope of work 1.#supply & installation of sewage tan k 5000 gallons. 2.#installation shall include the below activities. a.#backfilling of plot. b.#levelling of plot. c.#excavation fo r placing the tank. d.#building concrete enclosure for placing tank. e.#ventilation system for sewage tank. f.#manhole and covers. g .#required staircase for maintenance etc. 3.#contractor shall submit an official quotation with breakup prices for each activity. 4. #use of reputed brand quality material suitable for seashore site applications, which should be specified in offer. 5.#cleaning, cle aring and handing over of the site after job completion. 6.#job completion report with all related documents, material
site visit on wednesday at 10.00 am at r&d solar park.contact rawdha 050 8804448preliminaries the contractor is to note that qu antities have been measured to thenearest square or linear meter and he is to verify the quantitiesrequired to carry out the works in full. no claim for additional costswill be allowed at later stage of construction on the basis of incorrectquantities. note th e contractor is to allow for protecting the work as it proceedsallowing for regular cleaning, disposal, storage and transport ofmate rials to site. the site shall be kept safe and secure all the times.the contractor shall include here or in his rates for all necess aryplant, small tools, etc. for the execution of the works in full. note the bidder shall include 3d renders following the desig
scope of work for structure hand rails replacement work at e- station in jebel ali power station fabrication & replacement of exis ting structure hand rails due to external corrosion in waste heat boilers and auxiliary boilers, ph-i in e station. this is one to one replacement of existing hand rails with gi coated pipes including material, fabrication, surface preparation & painting and ins tallation. hand rail details are as follows# plain round hollow pipe with galvanized surface hand rail pipe size od:1.1/4inch or od :42.6mm, schedule 40 height of hand rail top from plateform:1200mm. center to center distance between 02 hand rail posts:1200mm. han d rails bolted with m16 gi bolts or welded with structures. distance between top & bottom hand rails:470mm. toe guard details
servicing/inspection of fire pump set at diwl 132kv substation sap order number :520607735 scope of work: diesel engine: 1. test run the diesel engine and check engine speed. 2. test fire pump performance and record the results. 3. service of diesel engine fuel injectors. 4. service and re-calibration of diesel engine fuel pump. 5. replace of fuel filters. 6. service of heat exchanger and d o pressure test. 7. flush engine water jacket for cleaning of close cooling loop. 8. replace of water coolant fluid. 9. drain engine lube oil and replace engine oil. 10. replace diesel engine lube oil filter. 11. replace engine upper head gasket if required. 12. replace engine air filter cleaner. 13. test run the diesel engine and re-adjust the engine speed. warranty: one year scope of work : fire pumps electric and diesel: 1. replace