Latest and live tenders published in all country. Click on any tender to view further details.
construction work for water projects; works for complete or part construction and civil engineering work
temporary protective work on the right bank of bangali river from km 76.180 to 76.480= 300.00m at bathuabari in upazila: dhunat, district: bogra under non-development revenue budget during the year 2013-2014
repair of earthen shank from meterage 510.00 to 555.00 = 45.00 meter of baniazan spur-2 at bre km 137.700 in upazila dhunat, district: bogra under non-development revenue budget during the year 2013-2014.
construction work for water projects; works for complete or part construction and civil engineering work
repair of rain-cut and ghogs of brahmaputra right embankment from km 98.200 to 116.340, km 124.015 to 126.000 and km 130.800 to 139.380 total 28.705 km in upazila sonatola, sariakandi and dhunat, district: bogra under non-development revenue budget during the year 2013-2014.
works for complete or part construction and civil engineering work; construction work;building construction work;engineering works and construction works;construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;construction work for water projects;construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;roof works and other special trade construction works
supplying, fitting & fixing of flap gates of sluices in polder no. 9, 10/12, 16, 18/19 & 23 under rehabilitation of bwdb infrastructures damaged by cyclone aila in coastal area south-western zone) project during the year 2012-13.
rehabilitation of protective work in cep polder 36/1 from km. 61.637 to 61.741 and km 62.225 to km 62.278 total = 0.157 km. in upazilla- mollahat, district- bagerhat in connection with the "flood damage rehabilitation 2007 works" under wmip during fy 2012-13 & 2013-14
re-sectioning of left irrigation canal from km. 0.940 to km 1.640 including construction of 1 no. box culvert over left irrigation canal at km 2.800 of bhully bundh irrigation scheme under water management improvement project during the year 2012-2013
construction of 1 no. p.c girder bridge at 14th km & 3 nos. r.c.c box culvert at different km of madaripur-agailjhara road, under madaripur road division during the year 2012-2013.