Latest and live tenders published in all country. Click on any tender to view further details.
construction of 1 no. p.c girder bridge at 14th km & 3 nos. r.c.c box culvert at different km of madaripur-agailjhara road, under madaripur road division during the year 2012-2013.
rehabilitation of 4 nos. syphones one at km. 2.970 of right irrigation canal and the other three at km 0.258, km 4.110, km 4.420 of left irrigation canal including re-sectioning of cross bundh from km 0.30 to km 2.245 along with construction of 16 nos. outlet at different ch. of left & right irrigation canal of buri bundh irrigation scheme under water management improvement project during the year 2012-2013
construction work;site preparation work;building demolition and wrecking work and earthmoving work;test drilling and boring work;works for complete or part construction and civil engineering work;building construction work;engineering works and construction works;
re-sectioning of embankment along the left bank of jheenai river from km 5.200 to km 9.200 maizbari bridge to katakhali regulator) total 4.00 km along with re-excavation of katakhali khal & birtara kharapara khal total 3.060 km in c/w khatakhali khal scheme under water management improvement project wmip) during 2012- 2013 & 2013-14.
providing clay blanket from km 26.600 to km 27.500 = 0.900km, km 27.600 to km 27.800 = 0.200km, km 27.900 to km 28.150 = 0.250km & 28.200 to km 28.800 =0.600km total = 1.950 km; 20 nos road ramp located from km 19.000 to km 29.000 & temporary protection of embankment from km 21.395 to km 21.470 = 0.075 km under patuakhli wd. division, bwdb, kalapara, patuakhali under wmip-fdr, package no.: bwdb:fdr/patuakhali wd/w-20 a during the year 2012-2013 & 2013-2014.
re-sectioning of embankment from km 0.000 to 0.900, km 1.000 to 4.200, km 7.400 to 7.500, km 7.600 to 9.400 & km 9.500 to 13.000 including repair of 1 no. regulator at km 3.000 and 3 nos. outlets at km 0.420, km 0.450 & km 1.740 of rahmatpur fcdi scheme under water management improvement project during the year 2012-2013
providing pre and post contract professional design, project administration and qs services for al khor
providing post contract professional consultancy services for four 4) new health centres packages 4 & 5)
providing pre and post contract professional consultancy services for the construction of national health
providing of establishing data center p1 salwa) and p2 tower 3)