filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m
providing & laying in position plain cement concrete 1:3:6, 20mm aggregates, excluding the cost of centering and shuttering in foundation, plinth, under floors, etc.
providing & laying damp proofing course with cement concrete 1:2:4, 12.5mm aggregate - 40 thick under exterior walls .
providing & laying moisture barrier using plastic sheeting underlay - 50 micro-metre under rooms in ground floor
providing and laying hand packed stone filling or soling with selected hard stones
providing & laying random rubble masonry with hard stone in cement mortar 1:4 … for all height
providing & laying second class brick work -250mm thk. full brick) in cm 1:4 for superstructure at all floor levels but excluding the rabsey component at 2nd floor level …
providing & laying second - class half -brick masonry 125mm) in foundation and super-structure all floor level in cement mortar 1:4 ...
providing & laying r.c.c 1:1.5:3, 20mm aggregate excluding the cost of formwork and reinforcement upto plinth level … foundation, footings, bases of columns etc. and mass concrete
providing & laying r.c.c 1:1.5:3, 20mm aggregate in beams, lintels, bands, plain window sills, staircase, curved surfaces, upto five floor level excluding the cost of formwork and reinforcement at all floor level