Latest and live tenders published in bhutan. Click on any tender to view further details.
providing and laying hand packed stone filling or soling with stones
providing and laying cement concrete 1:3:6, 20mm aggregates, excl.the cost of centering and shuttering formwork).
providing and laying rrm with hard stone in foundation and plinth in cm 1:4
filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc.
providing and laying second class brick work 250mm) in superstructure above plinth level upto floor two level - in cement mortar 1:4
providing and laying half brick wall 125mm) in cm 1:3 in superstructure for partition walls applo or kps)
providing and laying in position reinforced cement concrete works m20 in plinth and skirting courses, fillets, columns, pillars, posts and struts upto floor two level excl. the cost of centering and shuttering and reinforcement. footing-column.beams.lintel beam.roofprop
providing and fixing centering and shuttering formwork) incl. strutting, propping etc. and removal of formwork. footing
providing & laying dry earth bedding, including consolidating each deposited layer by watering, ramming and dressing, in layers of <200mm. under flooring, part i
providing & laying 40mm thick marble chips flooring top layer 6mm thick with white, black or black and white marble chips of nominal size 1.5-3mm in proportion 1:2 cement: chips), on 34mm thick concrete base in cement concrete 1:2:4, 12.5mm aggregate cement and marble powder mix shall be of the ratio 3 part of cement to 1 part of marble powder), in white cement