You have searched for tamil-nadu in Awarded Tender Result. Click on any tender to view further details.
3251Special Repairs to the Government Roads in Tirupur North (H), C&M Sub-Division. Package No.75 Road A :- Special repairs to Tirupur Ring road (via) Thirumurugan poondi, Nallur, 15 Velam palayam road at Km 0/0 -0/400
Road B :- Special repairs to Nallur Sennimalaipalayam road at km 2/0 -3/8
Road C :- Special repairs to the road from Km 7/4 of Avinashi Tirupur Palladam Pollachi Cochin (via) Meenkarai road to Avinashi goundam palayam at Km 0/0 - 1/6
Road D :- Special repairs to Senkalipalayam - Kattuvalasu road at km 0/0 -1/6
Road E :- Special repairs to Senkalipalayam - Vamalaigoundenputhur road at km 0/0 -1/6
Road F :- Special repairs to Umachivalasu - Senkalipalayam road at km 0/0 -2/0
Road G :- Special repairs to Umachivalasu - Senkalipalayam road at km 2/0 -3/6"
TRN :
676672
|
Tirupur - Tamil Nadu
Contract Value :
1.99 Crore |Agency Name :
Highway Department
3252TTPS – Mech.II – BM – Unit III - Fabrication and erection of structural platform suitable for the maintenance of Ash Level Indication Switches pertaining to instrumentation division inbetween I st & II nd row of Unit III ESP Hoppers
TRN :
715610
|
Chennai - Tamil Nadu
Contract Value :
2.15 Lacs |Agency Name :
Tamil Nadu Generation And Distribution Corporation Limited
3253Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 34) Road A :- Widening from Single lane to Intermediate lane and Improvements of Muthalipalayam - Manur road at km 0/0 - 1/8 including dip raising at Km 0/8 and Construction of Box culvert at Km 0/8 including upkeeping for a period of 60 months
Road B :- Widening from Single lane to Intermediate lane and Improvements of Muthalipalayam - Manur road at km 1/8 - 3/6 including construction of Slab culvert in Km 3/2 and Well protective wall in Km 3/4 including upkeeping for a period of 60 months
Road C :- Widening from Single lane to Intermediate lane and Improvements of Manur - Reddipalayam road at km 2/0 - 3/4 including widening the Pipe culvert in Km 2/4 and Construction of Box culvert at Km 2/6 in lieu of damaged pipe culvert including upkeeping for a period of 60 months.
Road D :- Widening from Single lane to Intermediate lane and Improvements of Manur - Reddipalayam road at km 0/0 - 2/0 including widening the pipe culvert in Km 0/2, 0/8, 0/10 and dip raising in Km 0/6, 0/8, 1/2, 1/4 & 1/6 including upkeeping for a period of 60 months
Road E :- Construction of Well protecting wall at km 1/2(R/S) of Sivagiri - Nathakadaiyur - Muthur road (MD 688)
Road F :- Improvements to Riding Quality at km 0/0 - 2/8 of Thangamman kovil Bye pass road (Using plastic waste) including upkeeping for a period of 60 months
Road G :- Providing of Center Median at km 1/2,1/4 & 1/8 of Tiruppur - Kangayam road in lieu of damaged RR masonry median (SH 172)
Road H :- Providing of Center Median at km 0/8 & 0/10 of Tiruppur - Kangayam road in lieu of damaged RR masonry median (SH 172)
Road I :- Construction of Well protecting wall at km 2/2(R/s) of Nallur - Chennimalaipalayam road
Road J :- Improvements to Riding Quality at km 2/0 - 4/4 and 4/713 - 6/0 of Vavipalayam - Uthukuli road (MD 1102) including upkeeping for a period of 60 months
Road K :- Widening the narrow Pipe Culvert at km 1/4 of Perumanallur - Koolipalayam road"
TRN :
704949
|
Tirupur - Tamil Nadu
Contract Value :
6.54 Crore |Agency Name :
Highway Department
3254Improvements to Riding Quality to Government Roads including Construction of CD Works and Retaining Wall and up keeping the roads for a period of 60 months in Attur C&M Sub Division (Package-11)
The Following works are involved in this package
1. Construction of Retaining wall at Km. 6/6,6/8 of Veeraganur - Nergunam Road -01-CRIDP-19-20-O-2600-01-CRIDP-19-20-O-2600
2.Improvements to Riding Quality at km 5/0 - 7/0 of Thalaivasal - Veeraganur Road (MD701) - 01-CRIDP-19-20-I-4482
3. Construction of Retaning wall at Km 7/8 and widening the culvert at Km.3/10, 4/6 of Thalaivasal - Veeraganur Road (MD701)-01-CRIDP-19-20-M-1311
4. Construction of Retaining wall at Km.6/10 of Veeraganur - Nergunam Road -01-CRIDP-19-20-O-2597
5. Improvements to Riding Quality at KM 5/0 -8/0 of Thalaivasal - Govindampalayam Road (MD848) -01-CRIDP-19-20-I-4474
6. Construction of Retaining wall at Km. 10/2 of Kattukottai -Sadasivapuram - Thedavur Road (MD841) -01-CRIDP-19-20-M-1312"
TRN :
719174
|
Salem - Tamil Nadu
Contract Value :
6.01 Crore |Agency Name :
Highway Department
3255Special Repairs to the Government Roads in Tirupur North (H), C&M Sub-Division. Package No.75 Road A :- Special repairs to Tirupur Ring road (via) Thirumurugan poondi, Nallur, 15 Velam palayam road at Km 0/0 -0/400
Road B :- Special repairs to Nallur Sennimalaipalayam road at km 2/0 -3/8
Road C :- Special repairs to the road from Km 7/4 of Avinashi Tirupur Palladam Pollachi Cochin (via) Meenkarai road to Avinashi goundam palayam at Km 0/0 - 1/6
Road D :- Special repairs to Senkalipalayam - Kattuvalasu road at km 0/0 -1/6
Road E :- Special repairs to Senkalipalayam - Vamalaigoundenputhur road at km 0/0 -1/6
Road F :- Special repairs to Umachivalasu - Senkalipalayam road at km 0/0 -2/0
Road G :- Special repairs to Umachivalasu - Senkalipalayam road at km 2/0 -3/6"
TRN :
704862
|
Tirupur - Tamil Nadu
Contract Value :
1.99 Crore |Agency Name :
Highway Department
3256Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 34) Road A :- Widening from Single lane to Intermediate lane and Improvements of Muthalipalayam - Manur road at km 0/0 - 1/8 including dip raising at Km 0/8 and Construction of Box culvert at Km 0/8 including upkeeping for a period of 60 months
Road B :- Widening from Single lane to Intermediate lane and Improvements of Muthalipalayam - Manur road at km 1/8 - 3/6 including construction of Slab culvert in Km 3/2 and Well protective wall in Km 3/4 including upkeeping for a period of 60 months
Road C :- Widening from Single lane to Intermediate lane and Improvements of Manur - Reddipalayam road at km 2/0 - 3/4 including widening the Pipe culvert in Km 2/4 and Construction of Box culvert at Km 2/6 in lieu of damaged pipe culvert including upkeeping for a period of 60 months.
Road D :- Widening from Single lane to Intermediate lane and Improvements of Manur - Reddipalayam road at km 0/0 - 2/0 including widening the pipe culvert in Km 0/2, 0/8, 0/10 and dip raising in Km 0/6, 0/8, 1/2, 1/4 & 1/6 including upkeeping for a period of 60 months
Road E :- Construction of Well protecting wall at km 1/2(R/S) of Sivagiri - Nathakadaiyur - Muthur road (MD 688)
Road F :- Improvements to Riding Quality at km 0/0 - 2/8 of Thangamman kovil Bye pass road (Using plastic waste) including upkeeping for a period of 60 months
Road G :- Providing of Center Median at km 1/2,1/4 & 1/8 of Tiruppur - Kangayam road in lieu of damaged RR masonry median (SH 172)
Road H :- Providing of Center Median at km 0/8 & 0/10 of Tiruppur - Kangayam road in lieu of damaged RR masonry median (SH 172)
Road I :- Construction of Well protecting wall at km 2/2(R/s) of Nallur - Chennimalaipalayam road
Road J :- Improvements to Riding Quality at km 2/0 - 4/4 and 4/713 - 6/0 of Vavipalayam - Uthukuli road (MD 1102) including upkeeping for a period of 60 months
Road K :- Widening the narrow Pipe Culvert at km 1/4 of Perumanallur - Koolipalayam road"
TRN :
676791
|
Tirupur - Tamil Nadu
Contract Value :
6.54 Crore |Agency Name :
Highway Department
3257Widening and Improvements, Construction of Drains, Widening of Culverts and including Up Keeping for a period of 60 Months on Government Roads in Tirupur South (Highways), C&M, Sub Division. Package No.35
A) Widening from End to End and Improvements of Avinashi- Tirupur-Palladam -Pollachi-Cochin (Via) Meenkarai Road at Km 14/8 - 15/4 (SH 19) including upkeeping for a period of 60 Months
B) Construction of Drain at Km 15/0 - 15/450 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin (Via) Meenkarai Road (SH 19)
C) Widening from End to End and Improvements of Tirupur - Ring road (Via) Thirumuruganpoondi, Nallur,15 Velamapalayam at Km 17/8 -18/6 including widening of Culvert at Km 17/10 (SH) including upkeeping for a period of 60 Months
D) Widening from End to End and Improvements of Tirupur - Ring road (Via) Thirumuruganpoondi, Nallur,15 Velamapalayam at Km 18/6 -19/2 including construction of Drain at Km 19/2 (SH) including upkeeping for a period of 60 Months
E) Widening from End to End and Improvements of Tirupur - Ring road (Via) Thirumuruganpoondi, Nallur,15 Velamapalayam at Km 19/8 - 20/6 (SH) including upkeeping for a period of 60 Months"
TRN :
705005
|
Tirupur - Tamil Nadu
Contract Value :
5.97 Crore |Agency Name :
Highway Department
3258Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works, and providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-28)
The Following works are involved in this package
1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 31/850 - 32/4 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0365
2.Widening from Two lane to Four lane at 32/4-32/8 and Improvements from km 32/6 - 32/8 of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0373
3.Improvements to Riding Quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4529
4.Improvements to Riding Quality at Km 7/2-9/0, 10/6-12/2 Thiruchengode - Sankari Road (via) Kolikkalnatham Road including upkeeping for a period of 60 months
01-CRIDP-19-20-I-4542
5.Improvements to Riding Quality at km 0/0 - 3/0 of Anchettipatti - Unjanoor Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4543
6. Improvements to Riding Quality at km 0/0-4/8 of Thottipalayam - Manjupalayam Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4552"
TRN :
719189
|
Salem - Tamil Nadu
Contract Value :
6.37 Crore |Agency Name :
Highway Department
3259Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works, and providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-28)
The Following works are involved in this package
1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 31/850 - 32/4 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0365
2.Widening from Two lane to Four lane at 32/4-32/8 and Improvements from km 32/6 - 32/8 of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0373
3.Improvements to Riding Quality at km 34/4 - 35/2, 35/4 - 36/2 and 38/4 - 40/8 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4529
4.Improvements to Riding Quality at Km 7/2-9/0, 10/6-12/2 Thiruchengode - Sankari Road (via) Kolikkalnatham Road including upkeeping for a period of 60 months
01-CRIDP-19-20-I-4542
5.Improvements to Riding Quality at km 0/0 - 3/0 of Anchettipatti - Unjanoor Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4543
6. Improvements to Riding Quality at km 0/0-4/8 of Thottipalayam - Manjupalayam Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4552"
TRN :
720185
|
Salem - Tamil Nadu
Contract Value :
6.37 Crore |Agency Name :
Highway Department