Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1381 Asian Countries Tenders
GTN :14132871
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; cleanthe tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to etransported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personneland will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opncontractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assistfor entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completion first one for site visit contact persons:mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 firstremove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635

1382 Asian Countries Tenders
GTN :14132884
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of impact wrench; makita cordless; 1/2-inch, hammer drill; dewalt dw511 1/2 inch vsr, grinder;osch angle, professional, gws-8-, grinder;osch gco14-2 powerful 2300-watt

1383 Asian Countries Tenders
GTN :14132906
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of conductor height meter with pro software the description similar to tru pulse 200x laser range finder - range: 1, 000 meter& 2, 000 me ter on reflective targets - inclination: +/- 90 degrees - accuracy: +/-4cm measurement modes: - distance: horizontal, vertical and s lope - inclination: degree and percentage height: - 3 shot routine - weight: 220 gm temp: -20 to +60 degree - dust & water protectio n: ip 54 - optics: 7x magnification - atarry: 3.0 volt aa type good for 37, 000 shots - communication: serial port - units: feet, y ards, meters & degrees - warranty: 1 year from the date of purchase - make: made from japan, europe or usa tansmission & distriution pro software for span, sag - data collector software solution such as span, sag - ap data collector - t&d pro software - qvga display screen with portrait view - pc: windows xp, vista & 7 operating system measurements: - 1. missing line & slope - 2. conductor clea rance - 3. sag profile - 4. conductor height - touch screen activated - record & store field data notes: caliration/test certificate to e provided warranty certificate to e provided demo and training to e provided.

1384 Asian Countries Tenders
GTN :14132927
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of automated pressure calirator; model: adt761-m: range: -0.90 to 25 ar make: additel, digital handheld manometer gauge, part no. hm3500dlm310, range 0 to 17 ar, make huer,,

1385 Asian Countries Tenders
GTN :14132951
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

dismantling existing fume hood cupoard and installation of laoratory fume hood cupoard, latec, fc120-sw. american/european standard. dimension outer - width 1240mm; depth 900mm; height 2400mm inner - width 1200mm; depth 720mm; height 730mm usale sash height work top: 19mm thick epoxy resin coated. depth of clear working space: 700 mm minimum front sash: 6mm thick toughened glass panel sliding up and down 2 nos of fluorescent light. 3 nos of 15a electrical sockets fume extraction fan

1386 Asian Countries Tenders
GTN :14132973
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of portale turidity meter - wtw 430 ir. attery operated and caliration with 0.02, 10.0, & 1000 ntu standards. equipment with recent cal iration certificate

1387 Asian Countries Tenders
GTN :14132995
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

01 no. purchase of heavy duty inding machine. -fellowes quasar e 500 electric com inding machine only. for more information please call mr. mohamed 04-3223073.

1388 Asian Countries Tenders
GTN :14136461
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  12 Sep, 2018

supply of valve, gate valve-class-1500, size-2-w ends, valve type-2-731xe, dwg no-p99211h/02, kks no-d1/d2/d3 had50aa406, make-intervalve, valve, gloe valve-class-1500, size-2-w ends, valve type-2-v714, dwg no-p99211h/308, kks no-51/52/53had50aa152, make-intervalve, valve -gate valve - size: 2 class:2500, connections: utt weld ends, schedule:160, type: 2-lv-w813c p/n:p99211h/205, valve -gate valve - size: 2 class:800, connections: utt weld ends, schedule:80, type: 2-lv-u713 p/n:p99211h/201, valve -piston check valve 2 class:150, connections: flanged ends rf150, type: 2-lv-p750 p/n:p99211h/219, valve -are stem gloe valve - size: 2 class:2500, connections: utt weld ends, schedule:160, type: 2-z811ce p/n:p99211h/306, valve -are stem gloe valve - size: 2 class:1500, connections: utt weld ends, schedule:80, type: 2-v711xe p/n:p99211h/310, valve -regulating gloe valve - size: 1class:2500 sp.ci, connections: utt weld ends, schedule:80, type: 1-z811ce p/n:p99211h/311, valve, gloe valve welded onnet, size 1, s/w end, class 1500, ody material c.s. a105, make: ks/jc middle east, for oiler high pressu re steam drain and vent system, valve, gloe valve welded onnet, size 1, s/w end, class 2500, ody material alloy steel a182 f22, make: ks/jc middle east, for oiler high pressure steam drain and vent system

1389 Asian Countries Tenders
GTN :14132039
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

supply of f . f . minimax fmz 4100 power supply unit, make: power innovation, usv1- se311, p/n: 835181, input: 230v ac/ 6a, out put: 28 vdc/9a, fire fighting system.contact mr. ahmed khalifa salim tel: 0505560233

1390 Asian Countries Tenders
GTN :14132054
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

trouleshooting and fixing the surge alarm prolem for 53fgc10, 53fgc15 & 54fgc15 fuel gas compressors y oem atlas copco#s control syste m service engineer for alaweer h3power station. oem is responsile for the complete jo without damaging the existing instruments a nd if any damage happens oem is sole responsile for rectify the damages immediately along with spare parts supply.

Get United Arab Emirates Tender Alert...

765216