Latest and live tenders published in ireland. Click on any tender to view further details.
framework agreement for energy efficiency retrofitting works to laois county councils dwellings. installation of all or some of the following energy improvement works: cavity fill insulation, associated ventilation and lagging to pipes and water storage tanks in the attic. contractors should take note that most, if not all of the properties involved, will be occupied at the time the works will be carried out
river dargle flood defense scheme construction management service provider
framework agreement for energy efficiency retrofitting works to kerry county council dwellings. installation of all or some of the following energy improvement works: cavity fill insulation; attic insulation;associated ventilation and lagging to pipes and water storage tanks in the attic. contarctors should take note that most, if not all properties involved, will be occupied at the tim ethe works will be carried out
present a requirement exists for master fisherman services see section 4 – service specification. applicants deemed qualified will be placed on a panel that the marine institute will draw from over the next two years to provide such services
flow cytometric analysis is a vital tool for any laboratory working in the area of in vitro cell culture and microbiology. this flow cytometer will be used to characterise the properties and functions of numerous cell types. this will include the characterisation of primary cells derived from mesocolic mesentery and the characterisation of bacterial strains isolated from cystic fibrosis patients. through this work, the analyser will permit the generation and validation of diagnostic, predictive and prognostic biomarkers across all clinical specialities.
framework agreement for energy efficiency retrofitting works to dublin city council dwellings. installation of all or some of the following energy improvement works: cacity fill installation; attic insulation; associated ventilation and lagging to pipes and water storage tanks in the attic. contractors should take note that most, if not all of the properties involved, will be occupied at the time the works will be carried out.
installation of all or some of the following energy improvement works: cavity fill insulation; attic insulation; addressing issues around natural ventilation of habitable rooms/attics etc; lagging to pipes in attic and insulation of cold water and central heating tanks in the attic . works will take place in occupied dwellings in both urban and rural locations and may involve groups of dwellings. the scale of work will vary from contract to contract but will involve a combination of the works outlined above
supply & install av equipment in castleforbes house, mayor street, dublin 1
measured term contract is proposed in the mid-west region for a contractor to provide a fully integrated service, including mechanical and electrical services, primarily for office refurbishments, during the lifetime of the contract for government buildings in counties clare, limerick and tipperary. it is proposed that the contract will be operated on a framework basis
digital hub development agency require a service provider for all of its ict support needs including, but not limited to, the management of the campus network, service management, desktop support, management and maintenance of it equipment. the service provider may be required to provide relevant it consultancy advice or project management services to the dhda. this may include reviewing the current it strategy and working with the dhda to provide recommendations for associated implementation. the dhda also require the service provider to procure it equipment and related items as and when required. an outline of the digital hub ict requirements is listed within the request for tender document