Latest and live tenders published in ireland. Click on any tender to view further details.
proposed development consists of a new flood protection system, approximately 1.0km in length located on the southern campshires of the river liffey. the flood protection will extend from butt bridge to samuel beckett bridge and beyond and returns across sir john rogerson’s quay just east of the new pedestrian crossing at cardiff lane. the scheme will provide flood protection from extreme high tides to a level of 3.7m above malin head datum. the protection will, for the most part, consist of a new flood wall which will be approximately 800 to 900mm high, and have a number of openings to allow access to the campshires, pedestrian bridges and walkways
suitability assessment questionaire -consultancy services to assess, advise and enhance hospital processes and practices at beaumont hospital
develop, co-ordinate and deliver a project to address the following: 1. facilitate and assist 1 no. traveller household who were normally resident at mohill halting site, and who are currently effectively homeless, to identify a sustainable accommodation solution that is deliverable by the relevant statutory and voluntary organisations within a reasonable timeframe. 2. facilitate, assist and support 5 no. traveller households (inclusive of the household at no. 1 above) who were formerly resident at mohill halting site in their transition to standard accommodation in terms of the sustainability of their tenancies and their integration into their new local communities, to include identification and delivery of necessary pre and post transition support plan, as appropriate, in consultation with leitrim county council housing department. the extent of the work required with individual households will vary and will be determined on the basis of a detailed assessment of their tenancy support requirements by the successful tenderer, to be submitted to, and agreed by, leitrim county council housing department. 3. provide assistance in relation to accessing supports where gaps are identified in relation to 5. no. traveller households formerly resident at mohill halting site. 4. support for communities within those local authority/private estates in which traveller families are being housed to promote dialogue between the traveller and settled communities as well as agencies, and to further encourage integration through this means, to include delivery of mediation and conflict resolution support as required. this project is supported by the european union’s peace iii programme managed for the special eu programmes body by leitrim county council on behalf of the county leitrim peace iii partnership.
an chéim invites tenders from independent suitable qualified it managed service providers to provide it maintenance & support
provision of human resources (hr) consultancy services to the campus manager to assist him develop a fully functioning cross-campus hr department. this will include development of key hr policies and procedures relating to employee engagement, discipline, grievance and other matters
supply of financial information systems
catering contractor will be require to provide a comprehensive catering service during the normal operating hours at dkit when students and staff are in attendance e.g. early september to late june and a reduced facility (to include lunches) is required from 10.00am – 4.30 pm during holiday periods.
refurbishment of a single-storey former treatment centre to new progression and enterprise centre for u-casadh ltd
services of consulting engineers in connection with the provision of consultancy services in relation to forthcoming works as a result of damage to public infrastructure following the severe weather in january and early february 2014 and for improvements in coastal protection. gcc proposes to establish and operate a framework agreement for the provision of these consultancy services which will ensure the availability of a number of suitably qualified service providers who are capable of providing services in relation to projects, of varying sizes and degrees of complexity, for all of the service requirements. the contracting authority has decided that the best way of fulfilling its requirements is through the award of a framework agreement (“fa”). due to the nature of the environment and the varying coastal damage caused as a result of the storms, there will be varying size and types of works. it is intended that works will be grouped in packages and issued to short-listed candidates on the frame- work on the basis of the selection criteria listed under a separate heading below. anticipated duration of the framework agreement will be for one year from date of award of the framework agreement with option to extend for a further two years
design, supply & installation of a proposed playground and playspace at lott lane, kilcoole, co. wicklow. the works shall include all associated civil engineering works including excavation & earthworks, fencing & gates, equipment, etc.