Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of wire; gi pvc coated 3mm
supply of tape; teflon thread sealant military grade thick 0.003 milsp;spec t-27730a mcmaster p/n. 6802k33 size w.1/2 43 ft roll temp 400 di g. 500 dig.f;p/r. 15677
supply of clapet check valve, size- dn 100, rating # 150, design-api-594, type-wafer, material ody/disc/seat #ss316l / ss316l / epdm, make : sw v alve corp korea, kks-60gem10aa004, 05, 06, for l1 desal co2 compressor
supply of steam duct, p/n htgd380463r0001, dwg pos. 3, order pos. 18, for alance line of hp/lp turine, model: hdc200-as-ne33, dwg. no. ggmv 8 00006v0004, of stg :-10/20/30, m/c. no.: gmt10702 / 703 / 707, type :dke1-1n33, manufactured y alstom
supply of hex socket screw m12-tx25 st-ga, dwg pos. 4, order pos. 4, for alance line of hp/lp turine, model: hdc200-as-ne33, dwg. no. ggmv8 0 0006v0004, of stg :-10/20/30, m/c. no.: gmt10702 / 703 / 707, type :dke1-1n33, manufactured y alstom
supply of all valves, jc, size-2 inch, api-6d300, 720mop;6d-0197 ; fig3530; ce0062, ody-cf8; trim; ht-65
scope of work for tank 3e ff line replacement 1.0#scope of work 1.#supply & installation of firefighting gi seamless pipes & fit tings for the fuel oil day tank 2.#removal of existing damaged pipes and fitting from the tank 3e 3.#removal of old pipe & fittings, installation, coating and testing of gi seamless pipes, fittings and nozzles for water spray cooling system and foam suppression sy stem # firefighting system 4.#pressure testing, painting, supports if required for the installed system 5.#attery limit is from the tanks top nozzles until the existing isolation/deluge valve connection piping. 6.#supply of men, machine, tools, equipment and consu males 7.#includes moilization, demoilization, transport, food and accommodation 8.#take field measurements prior topreparation of f arication where possile, to ensure proper fitting of the work. 9.#prior to start of work, carefully inspect the other neary installa tions to prevent damages. 10.#preassemle items in the farication yard to the greatest extent possile 11.#touchup lemished or unprote cted surfaces with primer. 12.#proper storage of materials to ensure protection against damage. 13.#immediately after erection, clea n field weld joints and olted connections. 14.#in the event of discrepancies, immediately notify dewa engineer. 15.#do not proceed w ith farication or installation in areas of discrepancies until all such discrepancies have een fully resolved. 16.#work force handli ng; work supervision, safety of the plant and staff. 17.#after completion of work
sumersile pump with electrically operated with single phase head of flow 25m, with all required accessories. a delivery pipe of 5 0lm with camlock coupling need to include.make: any european
supply of reallusion | all-in-one full-ody mocap animation solution
supply of reallusion |3d videocompositing