Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of control unit; auma matic for actuators, make- auma, type # ac1.2, com no -13397289, no # 3117ma78352, phase - 3 ph, 400v, i.p -68, c ontrol - profius dp-v2 for mushrif reservoir complex phase-3, actuator with control unit for 300mm valve electric, make- auma, actuator type: sar7.6, actuator com no: 13123230, control unit typ e- ac01.2, control unit com no: 13123230
supply of torque switch with complete set, model no: 7z1, 6mm, used for electrical actuator, type : a series, model: a5d20delmsh, make : sc h ieel `
supply of positioner current to pneumatici/p model: vp200, suffix: am 11/jf3/g style: s3.01, supply: 1.4 to 4 ar input: 4 to 20 ma amient t emp: 60oc exds iic t6x sr.no. t1802678 231 make: yokogawa; input 4-20ma dc style;s1.02, supply;2.8kgf/sq.cm ex proof;exds ii+h2 s. no;f911 dc 138-537-xjvp200-a5 make;yokogawa, japan;cne/040/95 spr-021 des amended for p.req no.17231 dtd.24.12.02
supply of temp, t/c, weston p/n 01128tc022w, spec rev:w, ref s/n ca124556, ge p/n 362a1102p017 / 362a1102p022, exhaust t/c, k type with studs, used in gtg, temp, trans, laarge inc, 7-21187-24, cale, exhaust thermo couple gtg. ge p/n 361a2327p024. mli 0623
supply of pocket colorimeter for testing chlorine dioxied using dpd method, palintestchlorine dioxide compact meter;product code:pth046 and a caliration check kitndf check standard kit; product code ptc046 with a valid certificate, portale density/specific gravity meter. range 0.0000 to 2.0000 g/cm3;precision ±0.001 g/cm3; resolution 0.0001 g/cm3.with valid cali ration certificate.
fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; cleanthe tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to etransported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personneland will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opncontractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assistfor entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completion first one for site visit contact persons:mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 firstremove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635
supply of impact wrench; makita cordless; 1/2-inch, hammer drill; dewalt dw511 1/2 inch vsr, grinder;osch angle, professional, gws-8-, grinder;osch gco14-2 powerful 2300-watt
supply of conductor height meter with pro software the description similar to tru pulse 200x laser range finder - range: 1, 000 meter& 2, 000 me ter on reflective targets - inclination: +/- 90 degrees - accuracy: +/-4cm measurement modes: - distance: horizontal, vertical and s lope - inclination: degree and percentage height: - 3 shot routine - weight: 220 gm temp: -20 to +60 degree - dust & water protectio n: ip 54 - optics: 7x magnification - atarry: 3.0 volt aa type good for 37, 000 shots - communication: serial port - units: feet, y ards, meters & degrees - warranty: 1 year from the date of purchase - make: made from japan, europe or usa tansmission & distriution pro software for span, sag - data collector software solution such as span, sag - ap data collector - t&d pro software - qvga display screen with portrait view - pc: windows xp, vista & 7 operating system measurements: - 1. missing line & slope - 2. conductor clea rance - 3. sag profile - 4. conductor height - touch screen activated - record & store field data notes: caliration/test certificate to e provided warranty certificate to e provided demo and training to e provided.
supply of automated pressure calirator; model: adt761-m: range: -0.90 to 25 ar make: additel, digital handheld manometer gauge, part no. hm3500dlm310, range 0 to 17 ar, make huer,,
restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-101.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and the intricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales ofdamaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers and other grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes andreflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, plat forms to e restored andinstalled ack after the works.for site visit please contact mr. nosir @ 056-6093676, restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-201.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and theintricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales of damaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers andother grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes and reflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, platforms to e restored andinstalled ack after the works