Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of semaphore indicator for merlin gerin c;make-entrlec;type-r40;100- 125v;35x35mm;dia-35mm, control relay;merlin gerin lcc;make-tecristol acok;type-1401871100;110v dc;4 c-o contacts;, cluster contact;ge ac mpact-plus;type-ms41w16;4p 50ka 1 sec;type #s#;frame size 1;400 to 1600, indicator; semaphore, type: q508, 300v cat iii, 110 v dc, sr.no: sk 1886430037, make siemens, pr no: 3s34000a., indicator; semaphore, type: q508, 300v cat iii, 110 v dc, sr.no: sk 1886430037, make siemens, pr no: 3s34000a.cuicle heater 230v ac; 90w; on 35c; off 65c; tropic proof; mounting on top-hat rail horizontal; with lead-out terminal; manuf.no.: 2 3090dk0; manuf. lm-therm;, alarm relay;mr11-2a;110vdc; make: ilfinger;11-92-72a; ka.508759
supply of cartridge; lack;305a;ce410a;laser jet pro 400 color, cartridge;yellow ;305a;ce412a;laser jet pro 400 color, cartridge;magenta ;305a;ce413a;laser jet pro 400 color, cartridge;cyan;305a;ce411a;laser jet pro 400 color, toner, cartridge, print, lack, q7570a, for hp laserjet m5035 printer
supply of lamp; fluorescent; 2 pin, 85 w; 240 v ac; 6 ft long, color: white day light, make: thorn or eqvt
supply of kit; drain valve kit; part no 2901 0749 00; for instrument air compressorph-1; model zt22-8.6; sl no s98505701/02/03; make; atla s copco; elgium, separator; water separator; ref 4025; part no 1613 5456 00; of connection parts for instrument air compressorph-1; model zt22-8.6 ; sl no s98505701/02/03; make; atlas copco; elgium, separator;water, ref. 3145; p/n:1619 7474 01; of phase - 1 instrument air compressor, model; zt22-8.6/50hz; sl. no. s 985057.01/02 /03 make : atlas copco, elgium.
inspection and maintenance of welding machines in power stationcomplexes.technical specificationlincoln machinesthis enquiry is to carry out periodical inspection and maintenance ofwelding machines for a period of one year, to ensure the reliaility andsafety the machines as listed elow. the work performance shall satisfythe local and international standards and regulations. upon completionof periodical inspection and maintenance of welding machine, contractorshall provide detailed inspection report for each individual we ldingmachine to concerned dewa engineertechnical details provided with this documents are very limitedinformation to understand the asic of the welding machines. thecontractor should visit the site and familiarize himself eforesumitting theoffer.scope of work.t he scope of work includes the following:1. periodical inspection and maintenance of welding machines shall ecarryout every 6 months twice in a year as per schedule fixed yconcerned dewa engineer. responsiility of the contractor against thiscontract is not limit ed to periodic maintenance of welding machines.ultimate responsiility is to ensure safe & troule free working ofwelding machine for one year. contractor is required rectify defects andtake up immediate repair and testing in consultation with responsiledewa enginee r whenever it is required.2. all the welding machine component shall e thoroughly inspected asper relevant standards to ensure the proper functioning of weldingmachines. upon completion of successful inspectionand maintenancedetailed inspection report should e f illed-in with relevantinformation, oservations/corrective actions required/carried out, etc., and sumitted to dewa duly signed with d ate and company seal of thecontractor.3. carryout repair/replacement of defective parts, adjustments requiredto welding machine com ponents, the defects that needcorrection/repair/adjustments y the contractor as part of thiscontract.4. all reakdown maintenance ca ll shall e attended within 24 hrs. ifrequired, shall e arranged on holidays. in case contractor failed toattend the reakdown within 24 hrs. the third party will e arranged ydewa to rectify the defect within short notice, an actual amount willincurred for defect re ctification will e ack charged tothecontractor. all the reakdown maintenance call is part of this contract.there will e no any addi tional amount will e compensated y dewa.5. all the engine operated welding machines, engine oil, air filter andengine filter shall e replaced with genuine parts as per aovescheduled, required luricant, filters shall arranged y contractor athis own cost.6. contra ctor is required to provide unit rate for each individualwelding machine as listed aove to carryout periodic maintenance twicein a y ear.7. complete consumales, spare parts, oil filter, air filter, engineoil, manpower, tools, etc. required for safe and timely exec ution of thejo shall e arranged y contractor. also safety of the people workingfor contract is his responsiility.general conditions. 1. complete resources includingmanpower, materials, tools, tackles, testing instruments etc. required for successful completion of the jois a part of this contract.2. safety of the persons working in ehalf is the responsiility ofsuccessful idder. contractor shou ld strictly follow dewa safety andenvironment regulations.3. the idder shall have adequate and proven experience in the field ofwel ding machines maintenance.4. contractor required to sumit risk and method statement prior tostart the jo.5. jo carry out shall hav e warranty for period of one year from dateof jo completion.6. no welding, flame heating or cutting, grinding etc. shall e carriedo ut without specific clearance from dewa though #hot work permits#.7. report duty in proper uniform printed legily with company logoandnormal ppe such as helmet, safety shoe, etc., inspection and maintenance of welding machines in power stationcomplexes.technical specificationlincoln machinesthis enquiry is to carry out periodical inspection and maintenance ofwelding machines for a period of one year, to ensure the reliaility andsafety the machines as listed elow. the work performance shall satisfythe local and international standards and regulations. upon completionof periodical inspection and maintenance of welding machine, contractorshall provide detailed inspection report for each individual we ldingmachine to concerned dewa engineertechnical details provided with this documents are very limitedinformation to understand the asic of the welding machines.thecontractor should visit the site and familiarize himself eforesumitting the offer.scope of work.t he scope of work includes the following:1. periodical inspection and maintenance of welding machines shall ecarryout every 6 months twice in a year as per schedule fixed yconcerned dewa engineer. responsiility of the contractor against thiscontract is not limit ed to periodic maintenance of welding machines.ultimate responsiility is to ensure safe & troule free working ofwelding machine for one year. contractor is required rectify defects andtake up immediate repair and testing in consultation with responsiledewa enginee r whenever it is required.2. all the welding machine component shall e thoroughly inspected asper relevant standards to ensure theproper functioning of weldingmachines. upon completion of successful inspection and maintenancedetailed inspection report should e f illed-in with relevantinformation, oservations/corrective actions required/carried out, etc., and sumitted to dewa duly signed with d ate and company seal of thecontractor.3. carryout repair/replacement of defective parts, adjustments requiredto welding machine com ponents, the defects that needcorrection/repair/adjustments y the contractor as part of thiscontract.4. all reakdown maintenance ca ll shall e attended within 24 hrs. ifrequired, shall e arranged on holidays. in case contractor failed toattend the reakdown within 24 hrs. the third party will e arranged ydewa to rectify the defect within short notice, an actual amount willincurred fordefect re ctification will e ack charged to thecontractor. all the reakdown maintenance call is part of this contract.there will e no any addi tional amount will e compensated y dewa.5. all the engine operated welding machines, engine oil, air filter andengine filter shall e replaced with genuine parts as per aovescheduled, required luricant, filters shall arranged y contractor athis own cost.6. contra ctor is required to provide unit rate for each individualwelding machine as listed aove to carryout periodic maintenance twicein a y ear.7. complete consumales, spare parts, oil filter, air filter, engineoil, manpower, tools, etc. required for safe and timely exec ution of thejo shall e arranged y contractor. also safety of the people workingfor contract is hisresponsiility.general conditions. 1. complete resources including manpower, materials, tools, tackles, testing instruments etc. required for successful completion of the jois a part of this contract.2. safety of the persons working in ehalf is the responsiility ofsuccessful idder. contractor shou ld strictly follow dewa safety andenvironment regulations.3. the idder shall have adequate and proven experience in the field ofwel ding machines maintenance.4. contractor required to sumit risk and method statement prior tostart the jo.5. jo carry out shall hav e warranty for period of one year from dateof jo completion.6. no welding, flame heating or cutting, grinding etc. shall e carriedo ut without specific clearance from dewa though #hot work permits#.7. reporresponsiility.general conditions. 1. complete resources including manpower, materials, tools, tackles, testing instruments etc. required for successful completion of the jois a part of this contract.2. safety of the persons working in ehalf is the responsiility ofsuccessful idder. contractor shou ld strictly follow dewa safety andenvironment regulations.3. the idder shall have adequate and proven experience in the field ofwel ding machines maintenance.4. contractor required to sumit risk and method statement prior tostart the jo.5. jo carry out shall hav e warranty for period of one year from dateof jo completion.6. no welding, flame heating or cutting, grinding etc. shall e carriedo ut without specific clearance from dewa though #hot work permits#.7. reporduty in proper uniform printed legily with company logo andnormal ppe such as helmet, safety shoe, etc., inspection and maintenance of welding machines in power stationcomplexes.technical specificationlincoln machinesthis enquiry is to carry out periodical inspection and maintenance ofwelding machines for a period of one year, to ensure the reliaility andsafety the machines as listed elow. the work performance shall satisfythe local and international standards and regulations. upon completionof periodical inspection and maintenance of welding machine, contractorshall provide detailed inspection report for each individual we ldingmachine to concerned dewa engineertechnical details provided with this documents are verylimitedinformation to understand the asic of the welding machines. thecontractor should visit the site and familiarize himself eforesumitting the offer.scope of work.t he scope of work includes the following:1. periodical inspection and maintenance of welding machines shall ecarryout every 6 months twice in a year as per schedule fixed yconcerned dewa engineer. responsiility of the contractor against thiscontract is not limit ed to periodic maintenance of welding machines.ultimate responsiility is to ensure safe & troule free working ofwelding machine for one year. contractor is required rectify defects andtake up immediate repair and testing in consultation with responsiledewa enginee r whenever it is required.2. all the welding machine component shall ethoroughly inspected asper relevant standards to ensure the proper functioning of weldingmachines. upon completion of successful inspection and maintenancedetailed inspection report should e f illed-in with relevantinformation, oservations/corrective actions required/carried out, etc., and sumitted to dewa duly signed with d ate and company seal of thecontractor.3. carryout repair/replacement of defective parts, adjustments requiredto welding machine com ponents, the defects that needcorrection/repair/adjustments y the contractor as part of thiscontract.4. all reakdown maintenance ca ll shall e attended within 24 hrs. ifrequired, shall e arranged on holidays. in case contractor failed toattend the reakdown within 24 hrs. the third party will e arrangedydewa to rectify the defect within short notice, an actual amount willincurred for defect re ctification will e ack charged to thecontractor. all the reakdown maintenance call is part of this contract.there will e no any addi tional amount will e compensated y dewa.5. all the engine operated welding machines, engine oil, air filter andengine filter shall e replaced with genuine parts as per aovescheduled, required luricant, filters shall arranged y contractor athis own cost.6. contra ctor is required to provide unit rate for each individualwelding machine as listed aove to carryout periodic maintenance twicein a y ear.7. complete consumales, spare parts, oil filter, air filter, engineoil, manpower, tools, etc. required for safe and timely exec ution of thejo shall e arranged ycontractor. also safety of the people workingfor contract is his responsiility.general conditions. 1. complete resources including manpower, materials, tools, tackles, testing instruments etc. required for successful completion of the jois a part of this contract.2. safety of the persons working in ehalf is the responsiility ofsuccessful idder. contractor shou ld strictly follow dewa safety andenvironment regulations.3. the idder shall have adequate and proven experience in the field ofwel ding machines maintenance.4. contractor required to sumit risk and method statement prior tostart the jo.5. jo carry out shall hav e warranty for period of one year from dateof jo completion.6. no welding, flame heating or cutting, grinding etc. shall e carriedout without specific clearance from dewa though #hot work permits#.7. report duty in proper uniform printed legily with company logo andnormal ppe such as helmet, safety shoe, etc
supply of pump: horizontal centrifugal pump, model: a23-40, moc: super duplex ss, application sea water, pump details: q 21.9m3/hr, h 180m, n 3666rpm, make: sulzer, origin: finlandc
supply of casing wear ring suction side p/n 1510, or m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal pump type, mu 125-250 vs .pompe gararino s.p.a, wear ring, monel k500 p/n 1521, for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal pump type, mu 12 5-250 vs .pompe gararino s.p.a, ring, split, retaining, material saf 2205 p/n 2531for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal p ump type, mu 125-250 vs .pompe gararino s.p.a, earing; ush material ronze p/n 3300.1 for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal pump typ e, mu 125-250 vs .pompe gararino s.p.a, earing; ush material ronze p/n 3300.2 for mevaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal pump typ e, mu 125-250 vs .pompe gararino s.p.a, nut;impeller self lock, material aisi 316 p/n 6581 for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifug al pump type, mu 125-250 vs .pompe gararino s.p.a, coulping; intermediate, material saf 2205 p/n for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal pu mp type, mu 125-250 vs .pompe gararino s.p.a, coupling;half, material caron steel p/n 7225 for m evaporator arometric sump pump kks 41-48gmj90ap010/020.vertical centrifugal p u mp type, mu 125-250 vs .pompe gararino s.p.a, seal;radial shaft, material nr p/n 4300.1 for m evaporator arometric sump pump kks41-48gmj90ap010/020.vertical centrifugal pump ty pe, mu 125-250 vs .pompe gararino s.p.
supply of 32 smart led tv for video displaying supporting hdmi & with us option to e installed in a us. electric hydraulic racket for lift ing the screen from the roof to e controlled y the driver. including installation of the aove.for more details contact elow:mona hus sain ahmed phone: 04-32-22081 # fax: mona.ahmed@dewa.gov.ae hamda hader in amer almuhairi phone: 04-32-22079 # fax: hamda.inamer@de wa.gov.ae
supply of valve manifolds;3 valve type:w3ca/w3da, part no:w3casa-n4td, make:schneider, quantity onnets: 3, manifold specifics: compact design # 3 valve manifold without vent port, inlet: female, material: 1.4401 / 1.4404 / 316 / 316l, onnet: ptfe, inlet - thread size: 1/2 npt, outlet - transmitter interface: din en 61518-a.
supply of insulation, monolitic ceramic fier pyrolog. temperature grade 1425. pyrolog dimension - 1000 x 600 x 152 mm. density - 160 kg/m3. f or whr transition duct from induct urner mmd k.