Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1381 Middle East Countries Tenders
GTN :14132076
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

supply of faricate the ruer ushing with mounting ss washer at oth sides of ushing and supply of suitale olt and nut as per the sample. 2-for olt, size m10 and 100mm length, material ss, grade 316. 3-for washer, size m10, material ss, grade 316 and dia 50mm. 4-for more det ail see the attached picture of ruer ushing. 5-pls do site visit to inspect the sample efore you quote for the said jo. 6-the vendo r shall provide 1year warranty. 7-deliver the material to dewa, japs, l1-station, emd -dept., jaelali, dua

1382 Middle East Countries Tenders
GTN :14132095
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

overhauling of atlas copco compressor element, model: ga22 for n2 generation unit in l2 station. scope of works includes: 1.#transp ortation of materials from & to the site. 2.#dismantling & inspection of the internals of the element. 3.#replacement of all integra l earings in the gearox and the compressor service stage. 4.#re-sealing of the rear earing housing, with the correct sealant. 5.#rep lacement of the main shaft seal and seal surface ush. 6.#replacement of all required gasket and o rings. 7.#reset the internal eleme nt clearances and ensure the correct gear ox clearances. 8.#alancing and assemling of rotors. 9.#required 1 year/8000 hrs warranty f or the element.contact mr. adulrahman yousef alshamsi tel: 04-81-40675 /0529222252

1383 Middle East Countries Tenders
GTN :14132104
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of high speed steel drill it set; made from high grade steel; metric ; 25 pc / set; size: 1mm - to 13 mm with 0.5 increments ; al l housed in a roust steel case . make: aeg / master craft / prseto or equivalent, electricians hole saw kits. hardened, heat resistant, and positive high speed steel teeth are welded to a durale alloy acking an d cap. size: 7/8 22mm, 1-1/ 8 29mm, 1-3/8 35mm, 1-3/4 44mm, 2 51mm, 2-1/2 64mm, 3 76mm, 3-5/8 92mm, 4 -1/8 105mm, 4-1/2 114mm, 4-3/4 121mm; two arors: a1, a2; one aror adaptor: a12; one ejector spring: a7; and case.

1384 Middle East Countries Tenders
GTN :14132129
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

l1 desal main gantry crane 40t cross travel gearox-overhauling work. vendor scope of work includes - dismantling of gear ox, insp ection and repairing. replacement of earings, oil level view glass, oil tank reather, all oil seal inside the gearox with new ones. all greasing nipples of cross travel also to e replaced with new one re assemling of gear ox to the crane. full painting of gear ox ody as per dewa standards. functional test after successful installation of gearox aove jo to e completed within 10 days from confi rmation dewa scope of work includes - scaffolding support, crane supportl, 1 desal main gantry crane 40t hoist gearox gearox-overhauling work. vendor scope of work includes - dismantling of gear ox, insp ection and repairing. replacement ofearings, oil level view glass, oil tank reather, all oil seal inside the gearox with new ones. all greasing nipples of hoist gearox also to e replaced with new one re assemling of gear ox to the crane. full painting of gear ox ody as per dewa standards. functional test after successful installation of gearox aove jo to e completed within 10 days from conf irmation dewa scope of work includes - scaffolding support, crane support.

1385 Middle East Countries Tenders
GTN :14132132
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of seat ring for wafer type lever operated utterfly valve, p no 3, size: dn 150 6, class: 150, ansi150, ody: a351cf3m, disc: a351cf 3 m, seat: epdm, kks no. 80ghc31/32/41/42/aa003, 81/2/3/4ghc53aa001 drw no cne/122/04-u-31-m-d-904044/27, make sejin, o ring for wafer type lever operated utterfly valve, p no 6, size: dn 150 6, class: 150, ansi150, ody: a351cf3m, disc: a351cf 3 m, seat: epdm, kks no. 80ghc31/32/41/42/aa003, 81/2/3/4ghc53aa001 drw no cne/122/04-u-31-m-d-904044/27, make sejin, packing for wafer type lever operated utterfly valve, p no 7, size: dn 150 6, class: 150, ansi150, ody: a351cf3m, disc: a351cf3 m, seat: epdm, kks no. 80ghc31/32/41/42/aa003, 81/2/3/4ghc53aa001 drw no cne/122/04-u-31-m-d-904044/27, make sejin, seat ring for wafer type gear operated, utterfly valve, size: dn 200 8, class: 150, ody: a351cf3m, disc: a351cf3m, seat: epdm, dr g. cne/122/04-u-31-m-d-90404 5/27 rev. d, kks no. 80ghc31/32/41/42 aa001, 80ghc51/52aa003, make sejinmmd-l2, valve utterfly, gear, dn150 class150, wafer-16.5, m/s sejin make.mmd-l

1386 Middle East Countries Tenders
GTN :14132145
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

supply of stored energy motor operator;for a tmax t6n 630 reaker; moe;a make, 110...125 vac/dc; 1sda060397r1;

1387 Middle East Countries Tenders
GTN :14132169
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

maintenance of hoist rake and vfd failure analysis of 90/25 t eot crane in gas turine hall at l station phase- 1 station, jeel ali. technical s pecification 1.0#introduction duai electricity & water authority dewa owns & operates power and desalination plants at its power station complex in jeel ali. generation division of dewa operates and provides maintenance, repair and overhaul services for power generation and water production plants in dewa. safety, availaility, reliaility and cost have always een the most important priorit ies in dewa.# dewa wish to conduct detailed analysis on eot crane 90/25t through a contractor experienced in the field having requi red resources to identify the root cause of frequent main hoist rake and vfd failure, and also to identify the presentcrane design standard classification and suitaility for power plant requirements. 2.0 list of the crane 2.1 technical details of crane #m ake###:#konecranes #type###:#sm09/2f/39 # dgc #year of manufacture #:#2003 #serial no.##: #h 0420694 / 81532 #capacity ##: #90/25t #hol ###:#24.7 #span ###:#22 meters #dewa code##:#gtl-cr-900/001 # 3.0#scope of work crane inspection and identification. 3.1#p hysical verification of the complete crane including hoists components, trolley wheels, motors and gears, rakes, hook locks, wire ro pes, vfds, electrical components, girder welding mpi test, girder deflection test, gear drive motors, cale rollers, limit switches a nd fasteners etc. shall e thoroughly inspected. the test including third party inspection/ proof load test. the list of the tests recommended for this shall e included with the offer sumitted. the wear and tear found shall e compared with standard permissile limit s for the size and capacity of the crane. 3.2#all tests, welding mpi test, proof load test shall e arranged y contractor. scaffoldi ng/ man lifter, if any required to reach each component of the crane shall e arranged y contractor. 3.3#operating data/history of c rane required for the purpose of calculating dwp design working period will e provided y dewa. contractor after working class iden tification shall calculate the dwp using special software availale for the purpose, referring to international/local standard. 3.4# the report sumitted shall suggest the following: - a.#dwp design working period of equipment. .#therepair/replacements/modificat ion require to prevent rakes and vfd failure. c.#identify the present crane design standard classification and suitaility for power plant application. d.#root cause of hoist rakes and vfd failure reports to e sumit. e.#upon completion of survey detailed presentati on to e given y crane inspector on findings/recommendations. 4.0#permission to work at site 4.1#efore commencement of his work in the plant, the contractor should apply for ptw permit to work in the prescried form, otainale from dewa engineer concerned. only a fter approval of the ptw and isolation of the crane y dewa, the contractor is allowed to commence his work. 5.0#safety precautio ns: 5.1#welding, flame heating or cutting, grinding, pneumatic chipping, etc. shall ecarried out only on specific clearance from d ewa through #hot work permits#. the hot work permit shall e otained on daily asis. 5.2#while working on the crane, the contractor should arricade the area underneath the crane preventing movement of plant operators and maintenance personnel in the work area. 5. 3#operation or testing of the cranes shall e done only upon specific clearance and authorization y concerned dewa engineer. efore op erating the crane, it is required to ensure that the concerned staff are availale and it is safe to operate crane. operator having v alid license to operate eot crane will e permitted to operate cranes after sumitting relevant documents/ license etc. 5.4#the contr actor shall carry out risk/hazop analysisfor all his works. this risk analysis shall e from safety as well as occupational health considerations. he shall provide dewa with his safety plan efore commencement of work and shall otain clearance from dewa for this procedure. 5.5 all vehicles, special tools, rigging tools, inspection tools, temporary scaffoldings/platforms, ladders, test weigh ts etc., shall e inspected and tested y approved authorities and the contractor shall provide dewa with necessary certification efor e their use at site. 5.6 contractor shall adhere with dewa safety and environmental regulations. working at height will e done after using proper personal protections like safety elt, helmets etc as required. man asket used shall e in good condition andtested one. 5.7 the area of work shall e kept clean at all times efore, during and after the work. spillage and splashes s hall e avoided. in case this occurs, it should e cleaned immediately. 5.8 no wastes, detergents, thinners, paints, used luricant s, etc. shall e let to trenches, water collecting pits, each sand or sea in the plant area. all such wastes should e disposed off a s per the product safety data sheets of every waste and under approval y dewa and strictly in line with duai municipal regulations. 6.0#time schedule 6.1 the work should commence within 7 days from date of order confirmation. 6.2 the idder is required to indicate in a ar chart his time schedule for carrying out the crane inspection. 6.3# no load test y an authorized inspection shal l e done. 7.0 code of conduct for thecontractor#s staff ø#report duty in proper uniform printed legily with company logo and nor mal ppe such as helmet, safety shoe, etc. ø#all staff should use same type/color of uniform and ppe ø#carry identity card issued y dewa always and present the same at security gate and on demand. ø#always maintain discipline while oarding and alighting us for t ravelling to and from power stations ø#alight only at the location where the jo is assigned unless it is asked y concerned dewa sup ervisor. no unauthorized roaming around is permitted. ø#refrain from using process water for washing/drinking purpose as it may con tain harmful chemicals ø#keep food packets at air conditioned room and refrain from heating food using steam drains ø#do not ringin moile with camera inside plant area. ø#keep away from operating plants and equipment and do only the jo assigned y dewa supervis or ø#maintain proper duty timing ø#avoid unauthorized entry to control uilding, gas station etc. ø#get proper instruction efore w orking on acid and other chemicals. follow the work instructions and in case of dout, ask questions to clarify. ø#use ppe appropria te for the jo ø#do not engage in fighting or insulting with fellow worker and dewa staff ø#any prolem and emergency, during work, shall e communicated to concerned supervisor ø#dispose waste food, empty cups etc. only to the waste in specially provided for the purpose. ø#maintain proper discipline at work ø#use only allocated facilities and the route indicated to reach thosefacilities fo r prayer, food, wash, etc. as advised y dewa supervisor. please ask questions whenever in dout. contact mr. mohammed arif ansari tel : 0509825631

1388 Middle East Countries Tenders
GTN :14132173
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  10 Sep, 2018

supply of v-elt; dunlop spz-1070, v-elt, spa 1407, dunlop make, v-elt; spa-1320; optieltemd - g

1389 Middle East Countries Tenders
GTN :14132182
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  11 Sep, 2018

smart maintenance - dry ice last cleaning on selected 20 nos secondary sustations.project scope: using dry ice last technology to clean 20 live sustations under dewa supervision.all materials and measures required to do the maintenance inside & outside the susta tion, need to e provided y the contractor as per dewa requirement including proper storing, transporting & disposal of used material s in line with other concerned government authorities. note: workman compensation policy should e availale with the contractor. cont act person: irahim hussein a al alamy contact no: 04-32-29510/ 0529555366

1390 Middle East Countries Tenders
GTN :14132186
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of rotor dynamic alancing for hrsg# 82 feed water pump # model - horizontal, ring section 200hmr06, make - hhi shaft length: 2.695mts. max. dia of impeller: 435mm, weight 460 kg.contact mr. adulrahman yousef alshamsi tel; 0529222252

Get United Arab Emirates Tender Alert...

343005