Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1421 Middle East Countries Tenders
GTN :14132871
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storag e tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. mete r 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor sho uld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understa nd the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; cleanthe tank, refill full tank with fresh foam supplie d y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 foam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping and clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e comp etent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans work ing under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling of foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsil e for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plan t. 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completi on first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to etransported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personneland will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opncontractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 first remove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assistfor entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractor shall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completion first one for site visit contact persons:mr. arad moile: 0504611635, fire fighting system foam replacement and used foam disposal work at g station. foam tank details, 1#foam tank at dfo/mfo storage tank area - capacity - 7.0 cu. meter. 2#foam tank at mfo day tank areavertical lack tank capacity # 1.25 cu. meter 3#foam tank at aux.oiler area # capacity - 0.5 cu. meter. 4#foam tank at k station forwarding area # capacity - 0.30 cu. meter total volume of foam for disposal # approximate 7.5 cu. meter scope of work 1 contractor shou ld sumit the risk assessment and method statement for otaining ptw from opn. contractor is advised to do the site visit to understan d the complete scope of work efore sumitting quotation. 2 it is the responsiility of the contractor to work safely, supervise work and ensure system is safe to work 3 firstremove complete foam from tank; clean the tank, refill full tank with fresh foam supplied y dewa. 4 contractor should have valid permit form municipality to dispose the waste. copy to e sumitted prior to start work. 5 f oam recovered from all tanks to e transported for disposal, through proper vehicle. 6 clean foam tank area carry out housekeeping a nd clear the area 7. finish the work and clear the ptw. dewa scope 1 dewa will supply fresh angus fp air liquid fluro protein 3% foam. 2 dewa engineer in charge will assist for entry permit to work etc. general conditions 1. the contractor shall e compe tent and have enough experience in the similar work and the work shall e undertaken with utmost safety to the plant and humans worki ng under him and neary. 2. the contractorshall arrange all the equipment, tools, accessories required for emptying and refilling o f foam in tank. 3. contractor must arrange his own tanker for the transportation of the foam. 4. the contractor shall e responsile for safety of his equipment and personnel and will follow all estalished codes of practices on safety and security within the plant . 5. tool ox talks shall e conducted on daily asis. copy to e sumitted daily . note - tank will e given one y one after completio n first one for site visit contact persons: mr. arad moile: 0504611635

1422 Middle East Countries Tenders
GTN :14132884
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of impact wrench; makita cordless; 1/2-inch, hammer drill; dewalt dw511 1/2 inch vsr, grinder;osch angle, professional, gws-8-, grinder;osch gco14-2 powerful 2300-watt

1423 Middle East Countries Tenders
GTN :14132906
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of conductor height meter with pro software the description similar to tru pulse 200x laser range finder - range: 1, 000 meter& 2, 000 me ter on reflective targets - inclination: +/- 90 degrees - accuracy: +/-4cm measurement modes: - distance: horizontal, vertical and s lope - inclination: degree and percentage height: - 3 shot routine - weight: 220 gm temp: -20 to +60 degree - dust & water protectio n: ip 54 - optics: 7x magnification - atarry: 3.0 volt aa type good for 37, 000 shots - communication: serial port - units: feet, y ards, meters & degrees - warranty: 1 year from the date of purchase - make: made from japan, europe or usa tansmission & distriution pro software for span, sag - data collector software solution such as span, sag - ap data collector - t&d pro software - qvga display screen with portrait view - pc: windows xp, vista & 7 operating system measurements: - 1. missing line & slope - 2. conductor clea rance - 3. sag profile - 4. conductor height - touch screen activated - record & store field data notes: caliration/test certificate to e provided warranty certificate to e provided demo and training to e provided.

1424 Middle East Countries Tenders
GTN :14132927
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of automated pressure calirator; model: adt761-m: range: -0.90 to 25 ar make: additel, digital handheld manometer gauge, part no. hm3500dlm310, range 0 to 17 ar, make huer,,

1425 Middle East Countries Tenders
GTN :14132951
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

dismantling existing fume hood cupoard and installation of laoratory fume hood cupoard, latec, fc120-sw. american/european standard. dimension outer - width 1240mm; depth 900mm; height 2400mm inner - width 1200mm; depth 720mm; height 730mm usale sash height work top: 19mm thick epoxy resin coated. depth of clear working space: 700 mm minimum front sash: 6mm thick toughened glass panel sliding up and down 2 nos of fluorescent light. 3 nos of 15a electrical sockets fume extraction fan

1426 Middle East Countries Tenders
GTN :14132973
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of portale turidity meter - wtw 430 ir. attery operated and caliration with 0.02, 10.0, & 1000 ntu standards. equipment with recent cal iration certificate

1427 Middle East Countries Tenders
GTN :14132995
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

01 no. purchase of heavy duty inding machine. -fellowes quasar e 500 electric com inding machine only. for more information please call mr. mohamed 04-3223073.

1428 Middle East Countries Tenders
GTN :14131653
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

ups defects rectifcation@mushmch-ldg-a contractor scope of works: all faults associated with uninterruptile power supply ups syst ems located at technical uilding-a serving the lighting and small power lsp system in mush- mch 400kv cale tunnel shall e identifi ed, rectified and restore the tunnel lsp power supply system into auto mode from persisting ypass mode. ups defect description: the ups systems are faulty with display showing #ups in ypass due to fault#. the mushrif- mamzar 400kv cale tunnel lsp main power supply fed through ups at zone-a are currently ypassed due to the persisting faults in ups. no dc ack-up currently availale for lighting a nd small power system inside the tunnel and technical uildings at the location. the technical data sheet of the ups areenclosed at the end of this document as annexure-1. the ups details and photographs of the ups fault display in the attached document. refer at tached document for more details. notes: · the interested party shall visit the site to collect all required details, assess entire scope of works prior to quote and quote for lump sum accordingly. no claim or change in price accepted after issue of po. contact d etails for arranging the site visit are: mr. althaff hussain, sr. engineer tel. no: 04-3221473/ mo: 050-3620306 or mr. jishar, ass t. engineer tel.: 04-3221431 /mo: 050-4400789 refer attachment for detailed sow., ups defects rectifcation@mushmch-ldg-d contractor scope of works: all faults associated with uninterruptile power supply ups syst ems located at technical uilding-d serving the lighting and small power lsp systemin mush- mch 400kv cale tunnel shall e identifi ed, rectified and restore the tunnel lsp power supply system into auto mode from persisting ypass mode. ups defect description: the ups systems are faulty with display showing #ups in ypass due to fault#. the mushrif- mamzar 400kv cale tunnel lsp main power supply fed through ups at zone-d are currently ypassed due to the persisting faults in ups. no dc ack-up currently availale for lighting a nd small power system inside the tunnel and technical uildings at the location. the technical data sheet of the ups are enclosed at the end of this document as annexure-1. the ups details and photographs of the ups fault display in the attached document. refer at tached document for more details. notesthe interested party shall visit the site to collect all required details, assess entire scope of works prior to quote and quote for lump sum accordingly. no claim or change in price accepted after issue of po. contact d etails for arranging the site visit are: mr. althaff hussain, sr. engineer tel. no: 04-3221473/ mo: 050-3620306 or mr. jishar, ass t. engineer tel.: 04-3221431 /mo: 050-4400789 refer attachment for detailed sow.

1429 Middle East Countries Tenders
GTN :14131661
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

supply of press. switch, ervor france, pn 7 700 015, range 4 - 40 ar, 1/4 g int pressure connection, pg13 cale connection, for air comp model g110edd ser 4760, ref n05000429, sdg/edg

1430 Middle East Countries Tenders
GTN :14131664
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  09 Sep, 2018

complete servicing of hrsg 71 feed water pump motor-, 11kv, 3917kw, make: weg, model mgf 710, speed 2988rpm. as per the followings s cope of work: stator: 1.#carry out stator visual inspection and wedges tightness inspection. 2.#carry out electrical tests and core loss test on the stator. 3.#servicing, drying of the stator and varnishing rotor: 1.#carry out electrical tests on the rotor. 2.#se rvicing of the rotor 3.#dynamic alancing of the rotor earings: 1.#inspection and checking of the earings. earings if required repla cement, would e provided y dewa. 2.#inspection, checking the clearances of earings housing and refill if required. 3.#checking all layrinth seals and earing caps, investigate and rectify the cause of high viration experienced on the earing caps. general:1.#carry out visual inspection efore dismantling. 2.#dismantle the complete motor. 3.#transportation of the motor from its location dewa-ja ps, l1 stn. to vendor workshop and ack to original location with a suitale long low id trailer to e provided. dismantling and load ing to trailer, and unloading and installation of the motor, would e done y dewa. 4.#inspection, painting, hydro test and servicing of coolers. 5.#apply external anti corrosion and anti-static painting of motor ody. 6.#no load and low load test at workshop on 6.6 kv minimum voltage to e carried out. complete reports servicing, tests and inspection& rectifying on findings must e sumitted. warr anty shall e extended for minimum 18 months from delivery or 12 months fromoperation date.

Get United Arab Emirates Tender Alert...

337336